We have a new machine installed in manufacturing and paper work has been signed off for installation. If we check 1st piece as well as in process inspection to the part print do I still need to run a capability study? Again the risk for this part is low and critical dimensions are checked in 1st piece. I understand the more data to show capability is great (I also now the machines specs) but the machine is needed to run for parts production.
Last edited: