SBS - The best value in QMS software

External Audit - Nonconformance Root causes

Paul Simpson

Trusted Information Resource
#21
It is disturbing to realize that the same non value added NC's are still being reported two decades later.

There should be a "death panel" for the career of auditors who don't understand how they should be adding value to stakeholders.

Let's create an independent bureau, responsible for reviewing all audit reports (including NC's) on an annual basis. Auditors who fail to demonstrate competence in providing useful feedback would be expelled from the system.:tg:
Wasn't there a 'Three strikes and you're out' law in the US a while back and we hear of people in jail for life now for stealing a slice of pizza - dodgy audit n/cs are far more corrosive to the prosperity of each of us. Think about all the hours spent going through the 'correction, corrective action, root cause analysis, action to prevent recurrence' cycle.

Not to mention the time spent here in the cove discussing it. But at least, your honour, it is my time and I'm doing this for fun! :bonk:
 
Elsmar Forum Sponsor

Paul Simpson

Trusted Information Resource
#22
Again, thank you guys for your responces. In regards to the Audit, we have a weird situation here. As I have said, this is a Recertification Audit but for the last 2 years, we did not conduct the 2 Surveillance Audit. I wasnt here at that time, but I learned that they did not got an Auditor for the Surveillance Audit. That means, our last Audit Report was on 2006.
:mg:

Previously, our Management Representative was one of the General Manager in our Company. Due to his busy schedule, he could not performed his job correctly. So his responsibilities was submitted to each department, just like dealing with the Customer Complaints. Each department are responsible for updating thier Complaint Log (some of the Complaints was not forwarded to the Top Management). There was no Customer Complaint Log for the whole company, no NCR Log, no Change Request Log and many more. For short, no system. Everyone was performing thier daily job and do what they can do. Now, its me who will be trying to collect every files from there to here.

Eventhough its a bit chaotic, our staff is still helping to collect the files I need. But the year is ending fast and we need the re-certification Audit this year. I was hired to find a system and maintain all the copies of QMS Documents. We start on revising the procedures and forms. Conducting the Internal Audits, MRM and closing the Internal NCR's. Sadly the time was short. We got the schedule for the external audit. I couldnt close some internal NCR's and my MRM presentation was not yet done.

That is the reason why we got this minor NCR's. I can say, it not really not a big issue but it is an NCR that need to be close.

If there are some who has the same situation like me. Please let me know. That will give me a feeling not to be more disperate.

Thank you.
:applause: My friend you have my undying admiration for your optimism in the face of such a blatant disregard for quality and the principles that underpin ISO 9001 ... and I haven't even started on your so called certification body yet! :mad:
 
H

Hodgepodge

#23
The OP indicated that the first NC was due to no reference to ISO 9001:2008 in the quality policy. I would be very surprised if the OP's company had their own documented requirements for such a reference.
Probably right!

The OP went on to state that the customer feedback, etc. was discussed in an MR meeting, but the discussion wasn't included in the meeting minutes.
So…no information was included relating to the 2 topics mentioned. Or, in your wording, “there was no evidence that it had been discussed”. This no evidence seems to indicate the lack of notes by the attendees regarding the required items. These two ways of stating nonconformance seem the same to me. Aren’t they? Section 5.6.2 requires review of information on:
b) customer feedback,
c) process performance and product conformity,

In an earlier post, Paul Simpson says:
if the latest meeting hadn't happened then there isn't any evidence.
If this were the case, I would agree. I don’t read it this way. After reading the thread again, it seems to me the finding was on a MRM that had already happened. However, a “presentation” hadn’t been finalized. If there was no evidence that it had been discussed or the information was not included in minutes of a meeting that already happened, then there is an NC. Perhaps, as Paul says, some leeway could have been given due to WIP, but it is what it is. Just because the CB has shown incompetence, or down right uselessness, doesn't mean this isn't an NC.



 
Thread starter Similar threads Forum Replies Date
D Having trouble with corrective action on external audit nonconformance Nonconformance and Corrective Action 8
S External Auditor Findings when an Internal Audit found a Nonconformance Yesterday Document Control Systems, Procedures, Forms and Templates 11
A What happens if an External Audit NC (Nonconformance) is not closed in 90 days? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
J Escalation of an External Audit Nonconformance Nonconformance and Corrective Action 13
L IATF external audit virtual (remote) IATF 16949 - Automotive Quality Systems Standard 13
R External Audit and Certificate prorogation due to the pandemic General Auditing Discussions 10
N Audit non-compliance API Q1 - Use of External Documents 4.4.4 in Product Realization Oil and Gas Industry Standards and Regulations 8
I What kind of wine best complements the Friday that you close out your external audit findings? Opinions are welcome. Coffee Break and Water Cooler Discussions 12
B Using external FDA and ISO 13485 audit as internal audit Internal Auditing 6
qualprod The Perfect audit? External Audit causes a significant negative impact in a company General Auditing Discussions 9
B How to reply NCR on ineffectiveness of corrective action during IATF external audit? This is repeated issue whereby some mistake was done. IATF 16949 - Automotive Quality Systems Standard 7
B IATF 16949 7.1.5.3.2 FAQ #7 Audit Finding - External Calibration Laboratory IATF 16949 - Automotive Quality Systems Standard 7
P IATF checklist for External Supplier Audit IATF 16949 - Automotive Quality Systems Standard 9
J Ignoring a Failed Gage R&R and upcoming external audit IATF 16949 - Automotive Quality Systems Standard 22
B Integrating ISO 9001/27001 External Audits - Audit Time Reduced? Discounts? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
J Corrective Action for External Audit NCMR (Procedure Not Followed) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
Q Effectiveness Plan for CAPA initiated from External Audit US Food and Drug Administration (FDA) 3
P Is Internal and external audit of Account Department applicable to any ISO standard Internal Auditing 5
R Can a external auditor raise a finding that is already identified in Internal Audit ? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
R Root Cause for "Simple" External Audit Findings ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
M Internal Audit finding versus External Audit finding General Auditing Discussions 2
drgnrider Control of External Audit Notes and Documents Document Control Systems, Procedures, Forms and Templates 8
L Mock Audit by External Consultant (ISO 13485) 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 8
R External Audit Attendees - Surveillance Audit Quality Manager and Management Related Issues 27
Q External ISO 14001 Audit in a Distribution Center ISO 14001:2015 Specific Discussions 3
R QMS changes before Annual External Audit Quality Manager and Management Related Issues 8
M External Audit Findings - TS 16949 IATF 16949 - Automotive Quality Systems Standard 3
B Audit of equipment after certified external calibration... ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M What to do during a Stage 1 External Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
V Most Common Internal/External Audit Observations on Risk Management ISO 14971 - Medical Device Risk Management 4
S Internal and External Audit Programme Implementation Internal Auditing 6
C No findings from External Audit - Should I be worried? General Auditing Discussions 7
K External Auditor asking for other Audit Findings ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 36
S Dreading an Ineffective External Audit and the impact it will have on staff General Auditing Discussions 1
Chennaiite External Audit re-defined Imported Legacy Blogs 4
A Need to Audit an External Calibration Laboratory? - Customer Audit Finding Other Medical Device Regulations World-Wide 5
J Withdraw NCR Request - External QMS Audit is In Progress General Auditing Discussions 23
S Customer Audit needs to see External Supplier Management Procedure Supplier Quality Assurance and other Supplier Issues 7
B Critical Action Limits (CAL) for All Internal and External Audit Findings General Auditing Discussions 17
S External Audit Non-Conformance - Control Plan and Inspection Issues IATF 16949 - Automotive Quality Systems Standard 1
Chennaiite Questions on the Scope of Remote Locations for the ISO/TS External Audit IATF 16949 - Automotive Quality Systems Standard 7
R ISO 9001 Internal Quality Audit by Consultants (External agency) Internal Auditing 5
M Giving copy of external audit report to customer General Auditing Discussions 20
L Human Resources Officer is absent during an ISO 9001 External Audit General Auditing Discussions 17
P ISO 13485 Audit - EN 62366:2008 not in External Document File IEC 62366 - Medical Device Usability Engineering 1
E First external audit coming up, do I need to have performed Internal Audits already? Internal Auditing 15
L How to check for validity of registration scope during ISO9001:2008 external audit Quality Manager and Management Related Issues 3
L Preparation for the second year external audit. General Auditing Discussions 8
A External Audit CAR on Record Control? General Measurement Device and Calibration Topics 6
P External Contract Auditor for Internal Quality Audit Internal Auditing 18

Similar threads

Top Bottom