1. A firm's division assembles the manufactured parts. All individual parts do go thru FAI in the first production run. But when all parts are assembled together into a single product, no FAI is done on first assembled product. Is it ok? Does "first production run" also includes "the first assembled product"?
2. A firm says, all of its product dimensions in all drawings are key characteristics and are monitored during QC. So we dont need to identify the key characteristics. Is it ok?