Well here is my delima. We are trying to comply with AS9102 FAI requirements and It states that you are not to FAI prototype parts.

During the final stages of prototyping the engineering dept will sub-contract a widgit at prototype revision 01 and build the unit. At some point the design is complete and all documentation is released at revision (-) and is now "released".

The problem is that the widget ordered at rev 01 was ordered at a qty of 250 due to ordering minimums and was since released to rev (-) with NO changes. The Rev 01 widgets will be reveived into inventory at the new Revision level of rev (-). Purchasing will ask for a FAI from the vendor at Rev 01 but I need one for rev (-).

My issue is that I need a FAI for rev (-) but will not be ordering more for a good while as I now have 250 in stock.

How can I handle this and be compliant? Can I use the rev 01 FAI and add a statement referencing the rev (-) documentation?
 
Elsmar Forum Sponsor
J

JAltmann

#3
If the processing for the rev (-) is the same as the rev (01) and their were no print changes you could re-mark the rev (-) parts as a rev (01).

The flag going off in my head is you mentioned "prototype" and as such that usually means the part was not built per the production process you are trying to FAIR.

If all things but the rev are the same you could actually do a full FAIR on the rev (-) and and a delta or aprtial FAIR on the rev (01) against the rev (-) FAIR.
 
A

andygr

#4
There is not a definition provided for prototype parts only first production run parts. This plus in my view the wording is open to interpertation that per the definition provided for prototype parts if your widgits are run just like those would be for the next production run you could perform a FAI on them and not focus on the term being used "prototype"
From AS9102
"FIRST PRODUCTION RUN PARTS: The first group of one or more parts that are the result of a planned process designed to be used for future production of these same parts. Prototype parts, or parts built using methods different from those intended for the normal production process, shall not be considered as part of the first production run."
:2cents:
 

dsanabria

Quite Involved in Discussions
#5
There is not a definition provided for prototype parts only first production run parts. This plus in my view the wording is open to interpertation that per the definition provided for prototype parts if your widgits are run just like those would be for the next production run you could perform a FAI on them and not focus on the term being used "prototype"
From AS9102
"FIRST PRODUCTION RUN PARTS: The first group of one or more parts that are the result of a planned process designed to be used for future production of these same parts. Prototype parts, or parts built using methods different from those intended for the normal production process, shall not be considered as part of the first production run."
:2cents:
Not sure if your understood the text above

"Prototype parts, or parts built using methods different from those intended for the normal production process, shall not be considered as part of the first production run."

INTERPRETATION: AS9102 is not for "Prototype Parts."

Usually Prototype parts have a unique identification on prints and parts so that it is clearly visible to production in order to prevent unintended use.

Was that done in this case?
 
A

andygr

#6
In some facilities, such as the originals poster's , there are case where in the configuration system a part design is not released to production but there is a formal tracking of configuration for test run or prototype parts and they are created using methods that would be used by production.
This methodology is done to validate not just the design but also the fabrication process since many times what looks good on the computer screen does not stand up well in the reality of the production process. Once verifed that parts are acceptably produced by the process(s) in the "prototype" fabrication process the design is then released for production in the configuration system.

To account for the change in revision in the FAI process, which is nothing more than accounting for a book keeping/paperwork item, you just would complete a new form 1 for the (-) revision stating that the FAI to rev (-) is to just account for release to prodution and that there is no change to parts or process from rev (01).
:2cents:
 
T

treesei

#7
First article inspection/approval not only verifies the drawing specs but also (implicitly) examines the process.

In the case of the OP, if the 250 pieces were built under the same process conditions to be used for mass production, there could be room for flexibility.
 
L

lorenambrose

#8
In some facilities, such as the originals poster's , there are case where in the configuration system a part design is not released to production but there is a formal tracking of configuration for test run or prototype parts and they are created using methods that would be used by production.
This methodology is done to validate not just the design but also the fabrication process since many times what looks good on the computer screen does not stand up well in the reality of the production process. Once verifed that parts are acceptably produced by the process(s) in the "prototype" fabrication process the design is then released for production in the configuration system.

To account for the change in revision in the FAI process, which is nothing more than accounting for a book keeping/paperwork item, you just would complete a new form 1 for the (-) revision stating that the FAI to rev (-) is to just account for release to prodution and that there is no change to parts or process from rev (01).
:2cents:

This has been VERY heplful.
 
L

lorenambrose

#9
Here is another issue I have with this.

Lets assume the prototype issue is resolved, which I think it is.

If these parts are plastic and I order 250 of them and they are "SOFT MOLDED" parts that can produce 50 parts per mold. So in this case with a 250 part order the vendor has to make 5 soft molds.

IS THIS:

a) 1 250 part run requiring 1 FAI
b) 5 50 part runs requiring 5 FAI's

Is there a way to include the the "SOFT MOLD" making process in the whole FAI process.

Am I overthinking this?
 
Thread starter Similar threads Forum Replies Date
K First Article Inspection (FAI) - Equipment used - Dimensions vs. Go/No-Go ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
C Is a First Article Inspection (FAI) Procedure required by ISO 13485? ISO 13485:2016 - Medical Device Quality Management Systems 3
M FAI AS9102 - What does a First Article Inspection cover? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
U Whether First Article Inspection Report- FAI is mandatory for regular Human Factors and Ergonomics in Engineering 4
R AS9100 FAI - First Article Inspection to a prior Customers PO AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
G FAI (First Article Inspection) Responsibility - QC or Engineering? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
R FAI (First Article Inspection) on source-controlled parts AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
K FAI (First Article Inspection) vs PPAP (Production Part Approval Process) APQP and PPAP 15
T FAI (First Article Inspection) of Large Assemblies/Tooling after move to new building AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
Q FAI IAW AS9102 - First Article Inspection Documentation Question AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 20
D AS9102 B (FAI - First Article Inspection) is Released - October 2014 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
A AS9102 First Article Inspection and NC Parts - New FAI? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
D Delta or Partial FAI (First Article Inspection) - What are the differences? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
K FAI (First Article Inspection) using Digital Design Data AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
G What is meant by FAI (First Article Inspection) and how do we comply? AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 26
C Inexperienced Mechanical Inspectors and FAI's (First Article Inspection) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
S FAI (First Article Inspection) during Assembly of Sub-Assemblies Only AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
F Can you reference original FAI (First Article Inspection) after Delta? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
R FAI (First Article Inspection) Report Number Method AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
Z AS9102 FAI (First Article Inspection) - Is a Ballooned Drawing Required? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
H FAI (First Article Inspection) Software Recommendations and Help Quality Tools, Improvement and Analysis 11
B AS9102 FAI (First Article Inspection) per standard or contract? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
L Selling Products Produced before First Article Inspection (FAI) Approval AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
E Understanding terminology for FAI (First Article Inspection) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
T FAI (First Article Inspection) - How many parts are measured AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
S FAI (First Article Inspection) and Key Characteristics Requirements - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
J AS9102 FAI (First Article Inspection) Full or Partial - Changes to NC programming Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
J FAI (First Article Inspection) Do as I say not as I do AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
P Design Characteristics of the FAI (First Article Inspection) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
P First Article Inspection - FAI for every new product launch AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
K Incoming Materials First Article Inspection (FAI) Procedure needed Document Control Systems, Procedures, Forms and Templates 2
T First Article Inspection - Is FAI Design Verification? Design and Development of Products and Processes 3
M Measure "TYP" dimensions on a first article inspection (FAI) report? ISO 13485:2016 - Medical Device Quality Management Systems 10
I FAI (First Article Inspection) for Bulletproof Glass normally for Autos? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
I FAI (First Article Inspection) for Chemical companies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
M Help needed with brilliantly engineered FAI (First Article Inspection) form 3 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
I FAI (First Article Inspection) per AS9102A include gen. notes on form 3? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
gard2372 Our Parent company is our supplier? FAI (First Article Inspection) not required? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
B FAI (First Article Inspection) per AS9102 Form 2, sections 5 & 6 question Document Control Systems, Procedures, Forms and Templates 10
T AS9102 FAI (First Article Inspection) Form example Document Control Systems, Procedures, Forms and Templates 35
A AS9100 Clause 8.2.4.2 - First Article Inspection (FAI) - How do you comply? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 10
M First Article Acceptance FAI Letter and related Letters of Approval Supplier Quality Assurance and other Supplier Issues 10
A First Article planning - Is an FAI timeline for the product the same thing? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
L FAI Charge General Auditing Discussions 3
D "FAI" Requirements/Process for New Supplier Materials Design and Development of Products and Processes 3
H FAI Requirement After Moving CNC Machine? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 15
DuncanGibbons Pre FAI production terminology AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
NDesouza Is my Partial FAI an Assembly or Detail? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
R FAI & P.O. Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 21
M Weld Symbol--Bubble Drawings for FAI Document Control Systems, Procedures, Forms and Templates 4

Similar threads

Top Bottom