K
kornfind
Hello,
My question is based on interpreting Minitab data with GR&R being done for production process improvement.
We run PCBs on Automated Test Systems with a number of parameters being tested. For instance, for voltage measurements, I have a tolerance value, a measured value and an expected value.
I read in some earlier posts that I should consider the %Tolerance value off the Minitab GRR report? Is that right?
Also, can I extrapolate false Passes and false failures from a GR&R study? If yes, how? If no, is there any other SPC method I should consider to find False Passes and False Failures' percentage?
Thanks,
BE
My question is based on interpreting Minitab data with GR&R being done for production process improvement.
We run PCBs on Automated Test Systems with a number of parameters being tested. For instance, for voltage measurements, I have a tolerance value, a measured value and an expected value.
I read in some earlier posts that I should consider the %Tolerance value off the Minitab GRR report? Is that right?
Also, can I extrapolate false Passes and false failures from a GR&R study? If yes, how? If no, is there any other SPC method I should consider to find False Passes and False Failures' percentage?
Thanks,
BE