What becomes of the T & E (Tooling and Equipment) supplement for QS 9000?
Did it die with QS or will it be resurrected elsewhere?
 
Elsmar Forum Sponsor

Sidney Vianna

Post Responsibly
Leader
Admin
#2
From AIAG :
The QSA-TE is used to determine conformance to the Quality System Requirements - Tooling and Equipment Supplement. Second Edition - 6/1998. This manual became obsolete on December 15, 2006. Will continue selling remaining stock for those customers who need one for their records. All sales final.
 
M

Michael Walmsley

#3
I understand the supplement dies with QS 9000 and will no longer be sold by AIAG. The concern I have is , is there value bringing the DCX TESQA or T&E formal requirements forward into another standard?
 
Thread starter Similar threads Forum Replies Date
D Little Help with "Tooling Change Program" for perishable tooling (8.5.1.6) IATF 16949 - Automotive Quality Systems Standard 4
E How to risk assess tooling? For a medical device and is it needed??? Manufacturing and Related Processes 2
briteme4 Customer Requests FAI on Tooling Fixture AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
C In-process inspection - Tooling and assembly lines for automotive companies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
L Heading dies as "tooling" and AS9100 Manufacturing and Related Processes 2
L Heading dies as "tooling" and AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
P Definition of production tooling in IATF16949 clause 8.5.1.6 IATF 16949 - Automotive Quality Systems Standard 4
Q Asset / Tooling Management - Two Questions Manufacturing and Related Processes 3
Nicole Desouza AS9100D - Calibration of Dies & Tooling - Plastic Extrusion AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R IATF 16949 Clause 8.5.1.6 a) maintenance and repair facilities - Production tooling management and personnel IATF 16949 - Automotive Quality Systems Standard 4
G Can anyone tell me about Tooling FMEA FMEA and Control Plans 3
S Document control for tooling drawings (Document control clause 7.5.3) IATF 16949 - Automotive Quality Systems Standard 5
S IATF 16949 Supplier Management - Supplier Tooling Requirements Supplier Quality Assurance and other Supplier Issues 1
B PPAP for Disposable Tooling APQP and PPAP 2
T FAI (First Article Inspection) of Large Assemblies/Tooling after move to new building AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
A Ensuring Tooling Use Tracking and Traceability AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
T Perishable Tooling Supplier - Nonconformances and Metrics AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
P Process Validation of inherited tooling by Contract Manufacturer ISO 13485:2016 - Medical Device Quality Management Systems 4
B Need help with a Control Plan for Encapsulation Mold / Trimming / Forming Tooling FMEA and Control Plans 9
R Managing Tooling Condition at Suppliers Supplier Quality Assurance and other Supplier Issues 6
J Tooling Cost - As an OEM I am paying for a new tool Manufacturing and Related Processes 6
E Nadcap - Tooling Control - Major Audit Finding (Question) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
P Machine Shop Tool Crib Procedure - Tooling for CNC mills Quality Tools, Improvement and Analysis 1
P What is a Tooling Detail form? APQP and PPAP 2
W What's the difference between Facility, Equipment and Tooling? APQP and PPAP 1
V GM Gage and Tooling Tolerancing Standards APQP and PPAP 3
K Machine Press Tooling Operation Inspection Samples Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
D AS9100 Tooling Purchasing Process Manufacturing and Related Processes 5
G How to manage a problem Overseas Tooling Supplier Supplier Quality Assurance and other Supplier Issues 7
V Application of AS9100 clause 7.5.1.1 - Tooling Supplier AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
J Tooling Inspection - Re-Inspection of Forge Tooling after it is Refurbished IATF 16949 - Automotive Quality Systems Standard 3
R Change Prints to accommodate Worn Tooling - There has to be a better way! Supplier Quality Assurance and other Supplier Issues 8
A Does anyone know what a SRVA is? Chrysler is asking for this for tooling Customer and Company Specific Requirements 7
S Plastic Injection Tooling - Understanding Plastic Injection Molding Terms Manufacturing and Related Processes 4
M Chrysler, GM, and Ford Tooling Records Requirements - What are Tooling Records? IATF 16949 - Automotive Quality Systems Standard 4
K An easy way to distinguish Tooling vs. Equipment Design and Development of Products and Processes 7
L Injection Moulding - Definitions of T0, T1 Samples produced from new mold tooling Manufacturing and Related Processes 11
A Tooling Status and APQP - When it should become "final"? APQP and PPAP 8
QMMike Extrusion Dies - Perishable Tooling? APQP and PPAP 4
M Tracking Materials and Tooling - Evolving to Real Life Misc. Quality Assurance and Business Systems Related Topics 8
S PPAP Clarification - Tooling Transfers APQP and PPAP 2
L Interpreting Injection Molding Tooling Documents - Cavities Manufacturing and Related Processes 3
Z Does a Tooling Build or Design Benefit From TS16949 IATF 16949 - Automotive Quality Systems Standard 8
J Press Brake Tooling / Back Gauging - Holes for the back stop instead of the Part Edge Manufacturing and Related Processes 8
apestate Ground Tooling produced from OEM Blueprints - Part 21? Of WHAT? Federal Aviation Administration (FAA) Standards and Requirements 9
B Tooling Suppliers: Process Audit Check-List? Supplier Quality Assurance and other Supplier Issues 6
F Can they take our tools? Inspection vs. Manufacturing Tooling and Gages General Measurement Device and Calibration Topics 13
harrysons Management of Production Tooling - TS 16949 Clause 7.5.1.5 IATF 16949 - Automotive Quality Systems Standard 3
D Adjusting Tolerances because of available tooling? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 9
B Application of Risk Management - ISO 14971 for a Tooling Manufacturer ISO 14971 - Medical Device Risk Management 18

Similar threads

Top Bottom