B
Bryon Simmons
Final Dock Audit
I need some direction in this new requirement. We are a QS-9000 certifed company; we are also a job shop, we produce as many as 75-100 orders a day of different product. Does this requirement mean that we have to do an audit (glorified inspection, IMHO) on every part number, or can we do a random sampling of orders to audit? Even at a self-prescribed frequency of annually, the sheer volume of part numbers would require me to hire an :inspector:, which ios something I have been diligently working to get away from. I do not understand how the B3 can tell us to emphasize defect "prevention: in our systems, (which makessense, obviously), and then require us todoadditional inspection. My process control systems were developed with prevention in mind.....This new requirement is a step backwards, IMHO.
Please enlighten me.
Thanks
Bryon
I need some direction in this new requirement. We are a QS-9000 certifed company; we are also a job shop, we produce as many as 75-100 orders a day of different product. Does this requirement mean that we have to do an audit (glorified inspection, IMHO) on every part number, or can we do a random sampling of orders to audit? Even at a self-prescribed frequency of annually, the sheer volume of part numbers would require me to hire an :inspector:, which ios something I have been diligently working to get away from. I do not understand how the B3 can tell us to emphasize defect "prevention: in our systems, (which makessense, obviously), and then require us todoadditional inspection. My process control systems were developed with prevention in mind.....This new requirement is a step backwards, IMHO.
Please enlighten me.
Thanks
Bryon