#1
Is the 'Final Inspection' and 'Layout & Functional Testing' should be attached into Control Plan??? Is it necessity???
:confused: :confused: :confused: :confused: :confused:
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#2
jhoniegudel said:
Is the 'Final Inspection' and 'Layout & Functional Testing' should be attached into Control Plan??? Is it necessity???
:confused: :confused: :confused: :confused: :confused:
Welcome to the Cove. Those things should be in the control plan.
 
J

jhoniegudel

#3
Thanks Jim...
I've already implement Final Inspection & Layout Inspection. But until this time I have not included this activity in my Control Plan.
Before ask you, I have the same with you about this case.
Sorry Jim,
I'm working in the Machining Company....but until now I don't know the differences between Final Inspection & Layout Inspection.
Until now I have do same things in Final Inspection & Layout Inspection
Can you explain about this..

Sorry i can't speak English well.
 

Howard Atkins

Forum Administrator
Staff member
Admin
#4
Welcome from me as well.
Final inspection- the inspection that you do to approve the part before you ship, usually at the time of packaging and as you decide (TS 8.2.4).
Layout- a complete dimensional and functional inspection according to the design records (drawing), required at certain times only, usually at PPAP and at times that you or your customer decides. (TS 8.2.4.1), this must be on the control plan
Hope this helps
 
J

jhoniegudel

#5
Specially thanks to Mr. Howard,

I have done the same things at Final Inspection and Layout Inspection.
The different is the inspection frequency only.
That is OK?
I have planned that the layout inspection will be deleted because I have
done Final Inspection at every production process.
That is OK?
As you wrote before, the Final Inspection do before shipping, so what is the difference between Final Inspection and Pre Delivery Inspection?
Thanks before.
 
Z

zenti78

#6
Final inspection will not cover all the characterstics specified in the drawing.
(May include some dimensions and visual aspects)

Layout inspection is an periodic inspection of all characterstics specified in drawing.

A.Senthil
 

Jim Wynne

Staff member
Admin
#7
zenti78 said:
Final inspection will not cover all the characterstics specified in the drawing.
(May include some dimensions and visual aspects)

Layout inspection is an periodic inspection of all characterstics specified in drawing.

A.Senthil
Not necessarily true; I've seen instances where a full layout was always performed at final inspection. In other words, there isn't necessarily a difference between "layout" and "final" inspection. Layouts might be done on an annual basis in addition to layouts at other times.
 

rnsvasan

Involved In Discussions
#8
We do final inspection for each and every batch before despatch.This inspection plan includes all the parameters that are all addressed in layout inspection. My question is what action we have to take when we notice any deviation in Final Inspection and Layout Inspection ? Will action be the same in both cases ? Pl. clarify how to approach the problem in both cases. Thanx
 

Jim Wynne

Staff member
Admin
#9
We do final inspection for each and every batch before despatch.This inspection plan includes all the parameters that are all addressed in layout inspection. My question is what action we have to take when we notice any deviation in Final Inspection and Layout Inspection ? Will action be the same in both cases ? Pl. clarify how to approach the problem in both cases. Thanx
As i suggested three years ago in a post up the thread a bit, there's no universally-accepted operational difference between "layout inspection" and "final inspection." The word "layout" is usually meant to describe a complete verification of all of the drawing dimensions and specifications, and that definition can apply to inspection anywhere in the process.

If you find a nonconformity in the product, you should take the action that's appropriate to your quality system requirements and your customer requirements.
 
U

Umang Vidyarthi

#10
Specially thanks to Mr. Howard,

I have done the same things at Final Inspection and Layout Inspection.
The different is the inspection frequency only.
That is OK?
I have planned that the layout inspection will be deleted because I have done Final Inspection at every production process.
That is OK?
As you wrote before, the Final Inspection do before shipping, so what is the difference between Final Inspection and Pre Delivery Inspection?
Thanks before.
Not OK.

Lay out Inspection: Covers each and every detail given in the drawing.

Final Inspection: Covers all major specs. of the component and/or as per customer requirement. This may not cover every detail given in the drawing. That is where it is different from 'Layout Inspection'.

PDI (Pre Despatch/Delivery Inspection): Covers all major specs. as is done in Final Inspection.

All the PDIs may be called Final Inspection, but every Final Inspection may not fall in the category of PDI. For example, a component after completion going to assembly line (within the facility), has to go through Final Inspection which is not termed as PDI.

It is more of convenience rather than a rule, as to the use of the terms Final Inspection or PDI

Umang :D
 
Thread starter Similar threads Forum Replies Date
I Mother bobbin final inspection criteria Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
A Doubt on multiple inspection carrying out for same balloon number during Stage Inspection and Final Inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
T Primary & Secondary Inspection Definitions - Incoming, In-process & Final Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
S 100% Final Inspection Requirements of Active Medical Devices (MDD or IEC Standards?) EU Medical Device Regulations 4
QMMike Software to Record Detailed Final Audit / Inspection Data Software Quality Assurance 2
S Required PFMEA Content - Final QC Inspection FMEA and Control Plans 7
alonFAI Finished PCB Final Visual Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
R Goods Inwards And Final Inspection Stamps Document Control Systems, Procedures, Forms and Templates 1
C Are these Final Inspection Process Checklists required? Document Control Systems, Procedures, Forms and Templates 10
A Does ISO/TS 16949:2009 require us to perform Final/Pre-dispatch Inspection? IATF 16949 - Automotive Quality Systems Standard 5
N Final Inspection Retesting for Failed Batches Nonconformance and Corrective Action 6
M Incoming, In-Process, Final and Outgoing Quality Inspection Procedure examples Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
T In-Process vs. Final Inspection Manufacturing and Related Processes 15
P MDD position on Final Inspection/Release Employee Experience/Training EU Medical Device Regulations 1
V Sampling Plan for Final Inspection and Process Verification Inspection, Prints (Drawings), Testing, Sampling and Related Topics 21
P AS9100 and Final Inspection of Machined Parts AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
B CNC Machining Shop still heavily relies on First Piece and Final QC Inspection Manufacturing and Related Processes 5
B "Detection, NOT Prevention!" - Relying on Final Inspection Quality Manager and Management Related Issues 48
M Developing a CPI for First Pass Yield Final Inspection - Need help Quality Tools, Improvement and Analysis 7
E Our Lean Initiative Manager is trying to eliminate Final Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
Q SMT Final Inspection Sampling Plan for boards off an SMT line Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
T CP: Is it feasible to define the inspection equipment as final function tester? APQP and PPAP 12
L In-Process and Final Inspection for a job shop (Machine) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
L Do all gages need calibration or only those used for final inspection? General Measurement Device and Calibration Topics 49
M Control Plan: How to include Final Inspection FMEA and Control Plans 3
T Final inspection and testing of product from validated processes Misc. Quality Assurance and Business Systems Related Topics 1
Z MSA (Measurement Systems Analysis) for gages used in final inspection Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
B Pre-Inspection & Final Inspection Procedures and ISO 9001 Document Control Systems, Procedures, Forms and Templates 9
S Final inspection process design for a machine shop setting. Inspection, Prints (Drawings), Testing, Sampling and Related Topics 21
R Basic training needs for Final Inspection people Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
V Can give me the sampling plan for Receiving and Final inspection - AS9100? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
J Software or template to manage first piece, in process and final inspection reports Software Quality Assurance 2
K Final Inspection for Software Product - Functional Test? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
V Final inspection as process step in PFMEA FMEA and Control Plans 11
S Kaizen event for the final QA inspection process - Kaizen help Lean in Manufacturing and Service Industries 7
J Final Inspection - 1st Article Dimensions before Anodize and Passivation Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
H No Final Inspection - Can this kind of a policy meet ISO 9001 requirements? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
O Final Inspection - QTY (Quantity) Check - Offset Printing Service Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
M Determine if your final inspection practices are 'waste' or not Lean in Manufacturing and Service Industries 35
S First Article Inspection in an AS9100 service industry (Final product non tangable) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
X Is final inspection necessary? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
S NonConforming product NCR during Manufacturing vs. NCR only at final inspection AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 21
A Final Inspection - Calibrated M&TE (Measurement and Test Equipment)? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
Q Final Inspection lot failures - AQL based final acceptance AQL - Acceptable Quality Level 3
P No In-process or first piece inspection - Final Inspection ONLY! Am I wrong? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 37
H Hoeyster QM - Goal: Eliminate "Final Inspection" - Aerospace precision machining AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
K Process Control Plan and Inspection Plans - Receiving and final inspection required? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 8
Z 4.10.4 Final Inspection and Testing - Wondering what kind of methods you guys use Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
J Final Inspections - Does 100% inspection really work Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
A Define Final Inspection Requirements on the Control Plan? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1

Similar threads

Top Bottom