Supplier put final inspection as process step in the process flow.
In the PFMEA this step is skipped.

In my opinion NOK. When this is a specific process step you must put this in your PFMEA and calculate the RPN.

has somebody an example how and what?

Thanks,
Wil
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#2
Re: Final inspection as proces step in PFMEA

Supplier put final inspection as process step in the process flow.
In the PFMEA this step is skipped.

In my opinion NOK. When this is a specific process step you must put this in your PFMEA and calculate the RPN.

has somebody an example how and what?

Thanks,
Wil
There are differing opinions on the subject of including inspection operations on the PFD and PFMEA. There is no specific requirement to do so in the AIAG manual, but I tend to think it should be included because it does (A) have the potential to result in delays and customer dissatisfaction and (B) have its own potential failure modes.

How you deal with the issue with your suppliers is a matter of choice on your part.
 

Kales Veggie

People: The Vital Few
#3
My preference is to include Final Inspection in the FMEA. Jim is right. It has its own failure modes (skipped, missed inspection step, accept a NOK part, reject a OK part and so on).
 
D

David Bear - 2010

#4
My experience has shown that if a step is important enough to include on the process flow diagram, it should be included on the PFMEA and Control Plan. It is not always necessary to include final inspection (depending on how your process is structured), but your PFMEA and Control Plan should include the steps listed on the flow diagram.
 

Stijloor

Staff member
Super Moderator
#5
My preference is to include Final Inspection in the FMEA. Jim is right. It has its own failure modes (skipped, missed inspection step, accept a NOK part, reject a OK part and so on).
Kees,

Would an MSA conducted on the devices + parts mitigate some of the risks associated with final inspection?

What do you think?

Jan.
 
D

David DeLong

#6
Re: Final inspection as proces step in PFMEA

There are differing opinions on the subject of including inspection operations on the PFD and PFMEA. There is no specific requirement to do so in the AIAG manual, but I tend to think it should be included because it does (A) have the potential to result in delays and customer dissatisfaction and (B) have its own potential failure modes.

How you deal with the issue with your suppliers is a matter of choice on your part.
Jim and I disagree on this point.

I would suggest following the outline in the AIAG manual which which states that one should ask "How can the process/part fail to meet requirements? Regardless of engineering specification, what would a customer consider objectionable?"

I always remember presenting a seminar on this subject in one company and they reflected one Process FMEA that they had spent countless hours developing. It included Receiving Inspection, fork lift moving, storage, dock audit, etc. It was huge and they were about ready to give up.

Most inspection is now performed by the Operator at the job site. I wonder how this should be approached if we do include inspection? Do we really have one process step or two process steps when the inspection in integrated? The inspection at a process step or after a process has occurred is called the Current Process Controls Detection or Prevention method.

I would suggest that a process step is one that is costed into the product which does comply with the AIAG outline. If a final inspection was costed rather than included in overhead, include it but in most cases, it isn't.

At least 50% of the Process FMEA are faked. There is 1 person, usually from the Quality group, sitting in a corner dreaming up stuff and then making sure that the RPN is lower than the Customer requirement.This usually occurs a day prior to sample submission. Does this really help reduce defects?

We need to really perform then in product families with a small group of department representatives contributing to preventing non-conforming product and defects.

Although I do respect Jim's opinion, I would not include final inspection as a process step but as a control method.
 

Jim Wynne

Staff member
Admin
#7
Kees,

Would an MSA conducted on the devices + parts mitigate some of the risks associated with final inspection?

What do you think?

Jan.
It would mitigate some risk, but not all. The level of risk (which varies depending on circumstances) should be considered in all cases, and there's no single best answer to the question at hand.
 

bobdoering

Stop X-bar/R Madness!!
Trusted Information Resource
#8
Re: Final inspection as proces step in PFMEA

Although I do respect Jim's opinion, I would not include final inspection as a process step but as a control method.
As usual - the correct answer to any question is it depends. For some products, it is a control, and there are no real issues from its inclusion in the process flow and may have nothing to offer in the FMEA.

BUT, on other products, the additional handling in final inspection can create problems - sometimes with frequencies that can be quite significant. For example, it may be that a final inspector is far from the production line, and on the line they take every effort to protect the threads. But at final inspection they measure a characteristic or two, and toss them into a box (unaware of all of the controls put in to avoid that defect - as determined in the FMEA and transferred to the control plan and work instructions - on the previous operations), nicking the threads and creating scrap. That is scrap that will not be detected until the customer opens up the box. Once you get that rejection, it will end up on the FMEA anyway, so it was likely worthwhile putting it in and considering the issues. :cool:
 

sinned

Registered Visitor
#9
I think the issue depends on how your company define what a "process" is. In my org., everyone used to include final inspection into the process flowchart so every doc hereafter has the process "Final inspection". In fact, in most of the time, it is the inspection being done right after the last production operation. So instead of writing it to the control part of the last operation (in control plan), we simply put the control points to an individual process at the end of the flow.

Personally i don't think much help to separate out a final inspection if all the control points are in fact being done right at the site of the last operation. (But the reality is many customers do not find a production process "completed" without having a final or outgoing inspection) 100% inspection is however frequently be treated as a process itself.

b.rgds
 
T

tlars

#10
Is it possible that an inspection step should not be scored in an FMEA?

One's first instinct is that EVERY step should be evaluated for failure mode. Under this guise, the inspection step should not be skipped.

I would propose that the inspection step IS A RESULT of a previous process step in the FMEA. The inspection step has been added to increase the likelihood of detection for a previous process step. The failure modes for that previous process should have already been captured.

Just my $0.02.

Thad
 
Thread starter Similar threads Forum Replies Date
T Primary & Secondary Inspection Definitions - Incoming, In-process & Final Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
C Are these Final Inspection Process Checklists required? Document Control Systems, Procedures, Forms and Templates 10
M Incoming, In-Process, Final and Outgoing Quality Inspection Procedure examples Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
T In-Process vs. Final Inspection Manufacturing and Related Processes 15
V Sampling Plan for Final Inspection and Process Verification Inspection, Prints (Drawings), Testing, Sampling and Related Topics 21
L In-Process and Final Inspection for a job shop (Machine) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
S Final inspection process design for a machine shop setting. Inspection, Prints (Drawings), Testing, Sampling and Related Topics 21
J Software or template to manage first piece, in process and final inspection reports Software Quality Assurance 2
S Kaizen event for the final QA inspection process - Kaizen help Lean in Manufacturing and Service Industries 7
P No In-process or first piece inspection - Final Inspection ONLY! Am I wrong? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 37
K Process Control Plan and Inspection Plans - Receiving and final inspection required? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 8
I Mother bobbin final inspection criteria Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
A Doubt on multiple inspection carrying out for same balloon number during Stage Inspection and Final Inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
S 100% Final Inspection Requirements of Active Medical Devices (MDD or IEC Standards?) EU Medical Device Regulations 4
QMMike Software to Record Detailed Final Audit / Inspection Data Software Quality Assurance 2
S Required PFMEA Content - Final QC Inspection FMEA and Control Plans 7
alonFAI Finished PCB Final Visual Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
R Goods Inwards And Final Inspection Stamps Document Control Systems, Procedures, Forms and Templates 1
A Does ISO/TS 16949:2009 require us to perform Final/Pre-dispatch Inspection? IATF 16949 - Automotive Quality Systems Standard 5
N Final Inspection Retesting for Failed Batches Nonconformance and Corrective Action 6
P MDD position on Final Inspection/Release Employee Experience/Training EU Medical Device Regulations 1
P AS9100 and Final Inspection of Machined Parts AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
B CNC Machining Shop still heavily relies on First Piece and Final QC Inspection Manufacturing and Related Processes 5
B "Detection, NOT Prevention!" - Relying on Final Inspection Quality Manager and Management Related Issues 48
M Developing a CPI for First Pass Yield Final Inspection - Need help Quality Tools, Improvement and Analysis 7
E Our Lean Initiative Manager is trying to eliminate Final Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
Q SMT Final Inspection Sampling Plan for boards off an SMT line Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
T CP: Is it feasible to define the inspection equipment as final function tester? APQP and PPAP 12
L Do all gages need calibration or only those used for final inspection? General Measurement Device and Calibration Topics 49
M Control Plan: How to include Final Inspection FMEA and Control Plans 3
T Final inspection and testing of product from validated processes Misc. Quality Assurance and Business Systems Related Topics 1
Z MSA (Measurement Systems Analysis) for gages used in final inspection Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
B Pre-Inspection & Final Inspection Procedures and ISO 9001 Document Control Systems, Procedures, Forms and Templates 9
R Basic training needs for Final Inspection people Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
V Can give me the sampling plan for Receiving and Final inspection - AS9100? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
K Final Inspection for Software Product - Functional Test? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
J Final Inspection - 1st Article Dimensions before Anodize and Passivation Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
H No Final Inspection - Can this kind of a policy meet ISO 9001 requirements? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
O Final Inspection - QTY (Quantity) Check - Offset Printing Service Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
M Determine if your final inspection practices are 'waste' or not Lean in Manufacturing and Service Industries 35
S First Article Inspection in an AS9100 service industry (Final product non tangable) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
X Is final inspection necessary? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
S NonConforming product NCR during Manufacturing vs. NCR only at final inspection AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 21
A Final Inspection - Calibrated M&TE (Measurement and Test Equipment)? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
Q Final Inspection lot failures - AQL based final acceptance AQL - Acceptable Quality Level 3
J 'Final Inspection' and 'Layout & Functional Testing' - Part of Control Plan? FMEA and Control Plans 9
H Hoeyster QM - Goal: Eliminate "Final Inspection" - Aerospace precision machining AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
Z 4.10.4 Final Inspection and Testing - Wondering what kind of methods you guys use Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
J Final Inspections - Does 100% inspection really work Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
A Define Final Inspection Requirements on the Control Plan? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1

Similar threads

Top Bottom