I am the QAM / MR of a AS9100C CNC machine shop. We will be having our AS9100D transition audit in a few weeks from now.
I would like to know what risk-specific documents the auditor will want to see (example - risk register, PFMEA, Contract review with risks, Supplier Quality Survey with Risks,
Corrective action reports with risks and mitigation actions (Instead of PA), Work transfer form with risks). If possible, please attach suitable templates.
Also I want to know how to link SWOT / PESTLE analysis, Interested parties, External and Internal Issues with the Risk Register. Do I have to show a link mentioned above. I would like to have clarifications what would the auditor want to see in SWOT / PESTLE analysis, Interested parties, External and Internal Issues and whether I have to determine the various risk in each case. Am confused.
 
Elsmar Forum Sponsor
S

sol49720

APQP process and associated form with risk evaluation for all the steps on it, analysis whether to quote or not and what to do if taking a quote with identified risk. If a new part, used a try-out sheet router for part. Follow steps, document where, what is done differently. Is this part at APQP because of a change request, either from customer or internally. Is a FAIR needed because of tooling repair, machine repair, process change, a full fair or Delta fair.

Contract review, evaluated our procedure and instruction, what, where did it evaluate risk and document. Our sales form addressed many areas for that and has notes areas for follow through. Is a FMEA, PPAP, FAIR needed. After contract review, how long has the part been out of production so you can determine if fair is needed or required.

On production floor, how often do you document measurements, sample plans used, are the item measurements critical, major, minor. Inspection, final inspection, self-release, what is checked, where documented, FOD control. Your people need to use words like risk, suspect. Your receiving inspection has to look for suspect material, do you use FRX, do you look for false certificates of material reports.
Are yor suppliers, both material and special/outside evaluated for risk, does purchasing evaluate a P.O. before it is sent to supplier?
All this is risk. Additionally, has Upper Management identified risk in section 4, done wrong and you can get a major. All the items you identified are applicable too. Good luck.
 
D

Document Dame

Congratulations!

We were scheduled to begin our AS9100D Transition Audit next Tuesday but our auditor lives in Florida, so needless to say he has more important things to deal with right now.

I'm a little concerned about how long it will take to set a new date.

It was scheduled as a Survailliance Audit plus the Rev. D Transition. (4 days)

From what I read, the CB schedules are pretty tight.

I feel like I got all dressed up to go to the dance and at the last minute my date couldn't make it.

Once again, Congratulations!
 

J.Enger

Involved In Discussions
We passed our Stage II Audit with only 2 NCRs (1 - a Ø0.2505" Class X pin gage was found to be out of tolerance during calibration - no investigation to determine if escapes happened, was just replaced; 2 - three jobs had no identifiers (move tickets) with the material to identify the job/material/operation. ).

We corrected those issues, and received our Certification on Feb 24, 2018. We are currently listed on OASIS which is a big thing for us, and we are preparing for a NADCAP audit for our welding processes. I have already incorporated all the Welding documentation into the AS9100 system, so we should go through that audit with no issues.

I want to thank everyone on here as all the threads i read through helped us get to this point.

We also ordered two flags from StandardFlags.com. Got one flying on the flagpole under the company flag, and one hanging in Quality (see pic below).
 

Attachments

Big Jim

Super Moderator
We passed our Stage II Audit with only 2 NCRs (1 - a Ø0.2505" Class X pin gage was found to be out of tolerance during calibration - no investigation to determine if escapes happened, was just replaced; 2 - three jobs had no identifiers (move tickets) with the material to identify the job/material/operation. ).

We corrected those issues, and received our Certification on Feb 24, 2018. We are currently listed on OASIS which is a big thing for us, and we are preparing for a NADCAP audit for our welding processes. I have already incorporated all the Welding documentation into the AS9100 system, so we should go through that audit with no issues.

I want to thank everyone on here as all the threads i read through helped us get to this point.

We also ordered two flags from StandardFlags.com. Got one flying on the flagpole under the company flag, and one hanging in Quality (see pic below).

Congratulations! Thanks for the feedback.
 

Sidney Vianna

Post Responsibly
Staff member
Admin
Just checked OASIS and there are 10163 sites certified to the AS91X0:2016 standards, which is, approximately, 50% of all certified sites. With a little over 4 months until the transition deadline, it is crunch time.
 
Last edited:

Sidney Vianna

Post Responsibly
Staff member
Admin
With approximately a month and a half to go before the September 15, 2018 deadline for the transition, OASIS show approximately 15,550 sites certified to the 2016 Edition of the AS91X0 standards. Out of a total 20,405 sites. So, close to 3/4 of the sites have made the transition already and attained certification.

On another note, during the last month, 122 sites have had their certificates suspended or withdrawn.
 

Buckyb

Involved In Discussions
Sidney,

How are the certifications going? We are only a few days away from the deadline....inquiring minds want to know.
 
Thread starter Similar threads Forum Replies Date
Q AS9100:2016 D - Intent of 8.4.3 (K) - Implement QMS AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
M Looking for Cross reference of AS9100:2016 to ISO13485 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
K AS9100:2016 (Rev. D) Required Procedures AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 19
W Is ISO9001:2015 required for AS9100:2016 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
A ISO9001:2015 comparison with AS9100:2016 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
R AS9100:2016 Rev. D - Status and Information - May 2014 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
Crusader AS9100 7.5.2 NOTE Approval methods identified AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
A Can a organization use a disclaimer "pending AS9100 Certification" in Marketing Information? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R AS9100D internal audit checklist or ISO 9001 2015 to AS9100 D AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
T AS9100 audit due to facility move AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K AS9100 and ISO9001 together AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M Do AS9100 Registrar Auditors have nonconformity quotas? General Auditing Discussions 18
L Heading dies as "tooling" and AS9100 Manufacturing and Related Processes 2
L Heading dies as "tooling" and AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
F AS9100 - Validation, FAIR's, ITAR and Sub-Contracting AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
L AS9100 - Product and Service Provision 8.5.1q AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
T Temperature Requirements For In House Calibration - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 16
T What does AS9100 mean when it says you must establish a process to do X? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 24
G Tool tracebility and First calibration requirements for aerospace (AS9100) organisation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T Internal Nonconformance procedure thoughts (AS9100) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
A AS9100 Training - Where do I start? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
SocalSurfer Can you recommend an enterprise QMS for new AS9100 startup AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
L Open Positions During AS9100 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
SocalSurfer AS9100 new certificate, but need QMS software, help Quality Assurance and Compliance Software Tools and Solutions 2
C AS9120 or AS9100 Cert pertaining to inventory? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
H AS9100 Checklist for Internal Audit needed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
hockeyhead Existing process never included in AS9100 scope of certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
W Major NCRs within AS9100 - What is the most frequent reason for Major NCRs? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
was named killer AS9100 Supplier Approval Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
R AS9100 - 8.4.2 - Receiving Inspection Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B AS9100 8.4.1 Supplier Selection/Evaluation criteria and reevaluations AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
S Effective nonconforming process for AS9100 8.7 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
O Adding ISO 13485 to an AS9100 QMS ISO 13485:2016 - Medical Device Quality Management Systems 13
M Customers Request AS9100 certification - Small Company (less than 20 employees) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
NDesouza AS9100 - D Capacity Planning Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
D ISO 9001 & AS9100 Certificate issued by a consultant for a Distributor Registrars and Notified Bodies 11
B FAR/Prime Contractor Flow-down Tool - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
K AS9100 - 7.3 - Are these black and white questions with specific correct answers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Does AS9100 require traceability to operators performing the work? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R Traceability on Unmarked Parts - AS9100 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
M When is FAI required? AS9100 8.5.1.3 and 8.4.3 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M Ethics and Legality AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K Counterfeit parts prevention - Audit Nonconformance - AS9100 8.2.2 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 25
classical_quality AS9100 Surveillance Audit - advice on drafting strong responses AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
L AS9100 - Infrastructure or Product? Inflight internet connectivity network AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
C AS9100 Rev D 8.1.1 & APQP - Operational risk management process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
T AS9100 - Changing PEARs target AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 41
R AS9100 DELTA FAI - Sub-supplier for plating changed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
G AS9100-8.1.2 Configuration Management AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R AS9100 REV D gap analysis matrix AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6

Similar threads

Top Bottom