A
We are a new supplier to Ford and are working towards our Q1 endorsment. It was sugested to us that we look at using First time through (FTT). Is this the same as First Run Capability (FRC)?
Does any one have an example worksheet or process for First Run Capability (FRC) / First time through (FTT) that I could look at to make sure we are heading the right dirrection with this?
Does any one have an example worksheet or process for First Run Capability (FRC) / First time through (FTT) that I could look at to make sure we are heading the right dirrection with this?