Ford Q1

C

Cindy Heimberger

#1
Yaaaaah!!! We just received a letter from Ford Purchasing requiring Q1 achievement by the end of the year! The list of four requirements, exactly as provided by Ford:

1. ISO 9000 registration
2. QS-9000 and TE supplement
3. QOS Implementation
4. Endorsement from key customers at Ford

Items 1, 3 and 4 are clear, but item 2 is not. Does anyone out there know what this item includes? I have received conflicting answers from my Ford sources, my consultant and my registrar. I have an old (1998) Q1 petition package list that contains the following bullet:

Copy of the latest 3rd party auditor's summary and recommendations sheet with comments on QOS, R&M and Equipment Proveout complying to the Ford requirements.

At this point, I can't advise my company whether or not we can make the deadline until I know what we're signing up for.
 
Elsmar Forum Sponsor
R

Rod Cler

#2
QS-9000 TE Supplement is an extension of the ISO-9000 requirements. The actual requirements can be ordered from the Automotive Industry Action Group(AIAG) www.aiag.org, 248-358-3003. You'll need QS-9000 3rd Edition and the Tooling & Equipment(TE) Supplement 2nd Edition along with the five associated manuals. You're in for a lot of work. Good luck.
 

Marc

Fully vaccinated are you?
Leader
#3
I'm confused. You are saying they want all four? Or 1 of the four? If you do 2, you have 1 automatically.

If you do 2 you also have 3 automatically. Ford's QOS (Quality Operating System) is really mostly a data thing. Analysis and use of company level data pretty much covers it. QOS requires you to:

Identify Customers and their expectations
Identify Key processes
Select Measurables
Track Measurables
Predict downstream performance

and adds:

Constant employee awareness
Continual process improvement

If you have QS9000 you can demonstrate QOS within.
 

Marc

Fully vaccinated are you?
Leader
#4
Ah! I forgot the TE part. What is your business? High production? Tooling? Need more info.
 
M

mibusha

#5
Before I started working at this TE company they had tried unsuccessfully for a few years to get Q1. For a variety of reasons they came close but just couldn't seem to make it.Basically they gave up. Enter me.They got serious and gave me a blank check both in terms of management support and budget. We got QS 9000 with TE compliance. Now its back to Q1. My question is: we have the old "evidence book" with 10 sections full of data on all aspects of the business. I think it is the old method of petitioning for Q1. A few people have told me that if we have QS 9000 and TE compliance with a good concentration on R&M and continuous improvement and are a preferred vendor, we should be all set.Does this make sense? Ford is predictably vague. The STA for TE suppliers no longer exists.

Michael
 
Thread starter Similar threads Forum Replies Date
D Ford CSR Cpk/Ppk Requirements Statistical Analysis Tools, Techniques and SPC 8
Vader22 FORD CSR Gap Analysis Checklist IATF 16949 - Automotive Quality Systems Standard 4
T Ford Q1 MSA - Virtual Site Visit Hardware Manufacturing and Related Processes 14
Dan Pare Ford CSR Update (FMEA's) - January 2022 FMEA and Control Plans 25
T Ford CSR for Internal Auditors 2021 Internal Auditing 4
Techilady Ford Special Characteristics Communication and Agreement Form (SCCAF) provides production requirements? FMEA and Control Plans 4
B Struggling with using the 5.6 version Ford Capacity Analysis Report APQP and PPAP 5
O Informational Ford Motor Company Customer Specific Requirements for IATF 16949:2016 - 08 Jan 2021 Customer and Company Specific Requirements 0
O IATF 16949 News Ford Motors Customer Specific Requirements Update - Nov 2020 IATF 16949 - Automotive Quality Systems Standard 5
C Ford's MMOG/le Template wanted Manufacturing and Related Processes 0
H FORD's project milestone acronyms Customer and Company Specific Requirements 4
R Ford Q1 Manufacturing Site assessment result Customer and Company Specific Requirements 3
Ron Rompen Ford Method - Position Capability with MMC Modifier Capability, Accuracy and Stability - Processes, Machines, etc. 14
M Ford Q1 Revocation Recovery Process Customer and Company Specific Requirements 5
A Is normal for FORD EU ask for the PSW every year APQP and PPAP 5
C A couple CSR (Customer Specific Requirements) questions... Esp. Ford & Toyota Customer and Company Specific Requirements 5
V What document to use to document Welding PV testing - Supplier to Ford APQP and PPAP 1
E Ford Phased PPAP and T2 timing APQP and PPAP 1
S Where to get Ford document FAP 03-111 FMEA and Control Plans 12
Q Ford's Q1 Score Prediction Customer and Company Specific Requirements 2
V Ford Dimensional Tag Characteristics requirements APQP and PPAP 2
R Ford Motor Company new CSR document - May 2014 Customer and Company Specific Requirements 1
K Q1-Ford - Does anyone have any Q1 templates? Document Control Systems, Procedures, Forms and Templates 2
Ron Rompen Ford Paint Audit Checklist Customer and Company Specific Requirements 4
S ASTM-D4000 & FORD "ZW" Call-Outs Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
S Dimensional Issues because of the last years FORD Recall Manufacturing and Related Processes 2
J JMP Gauge R&R with FORD MSA Data Quality Tools, Improvement and Analysis 2
A Statistical Software Calibration using Ford's "Sample Calibration File" Statistical Analysis Tools, Techniques and SPC 8
V Where I can find an AAR form on Ford Covisint? APQP and PPAP 1
Marc Ford is introducing an Aluminum F-150 Pick 'em Up Truck World News 1
V Webasto Ford Exceptions Form APQP and PPAP 1
Marc Ford - Self-parking technology called Fully Assisted Parking Aid World News 1
M Advise on R Chart with Ppk of 17.85 for Ford Capability, Accuracy and Stability - Processes, Machines, etc. 37
V What Ford Phase PPAP Level should DV testing be submitted? APQP and PPAP 1
Stijloor Ford - June 2013 Customer Specific Requirements (CSR) Customer and Company Specific Requirements 1
T What innovations led to Ford's production line? Coffee Break and Water Cooler Discussions 5
Ajit Basrur On Henry Ford's 150th Birthday, His Greatest Insight Has Been Tragically Forgotten Coffee Break and Water Cooler Discussions 11
D How long must we provide service parts to Ford? IATF 16949 - Automotive Quality Systems Standard 7
S Ford Motor Engineering Change Level definition Customer and Company Specific Requirements 6
C Will Ford accept AS9100 certification in place of ISO9001 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
R Ford SQDCME manual Manufacturing and Related Processes 1
D What is the Ford Troubled Supplier group? Manufacturing and Related Processes 7
V Ford SREA (Supplier Request for Engineering Approval) 2007 revision Document Control Systems, Procedures, Forms and Templates 2
C New Ford CQI 15 Rollout Requirement and reference to ESBC24-5005-AB IATF 16949 - Automotive Quality Systems Standard 3
D What is a Ford Single Scale? Customer and Company Specific Requirements 2
J Ford changing their acronym for Significant Characteristics from HIC to CTQ Customer and Company Specific Requirements 2
K How to fill out an SREA (Supplier Request for Engineering Approval) form at Ford? APQP and PPAP 3
G Ford - Type 1 Gage Study MSA (Measurement Systems Analysis) acceptable? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7
xfngrs What does the Ford Europe acronym ISRD stand for? APQP and PPAP 6
V Where to find FORD Specific PPAP Training Training - Internal, External, Online and Distance Learning 3

Similar threads

Top Bottom