Ford's Q1:2002 Requirements

  • Thread starter matthew evans - 2002
  • Start date
M

matthew evans - 2002

#1
Hi everyone.

Does everyone know about the new Ford Q1:2002. I found a letter on the Ford Supplier Network outlining FMC new revision of their Q1 award.

It has alot of continuous improvement requirements, which never hurts, but it also has a MS9000, MMG requirement which is something to do with control of material flow (I think).

There is also a self assessment checklist which includes the requirement for "Suppliers with high impact" to be QS9000 or 16949 "Compliant" with the customer (Us) verifying this with an annual visit.

Anyone know anything else about this latest requirement from Ford's??

By the way all tier 1 supplier's to Fords only have untill Feburary 1st 2002 to meet all of the requirements and submit them to Ford.
 
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration
Staff member
Admin
#3
My 'mole' sez:

We are pleased to announce the global launch of Q1 2002! It reflects the best of the present Q1 with increased emphasis on manufacturing process capability, variability reduction and key performance metrics. The CEOs of Production suppliers in North America and Europe, including Jaguar, were mailed the Q1 2002 book on August 31, 2002.

The Q1 2002 journey begins with the launch of an updated Supplier Improvement Metrics (SIM). Beginning with the September 17th SIM publication, suppliers will know their Q1 2002 status and overall score, which is linked to their SIM summary report, on a monthly basis. Starting September 11th, to learn more about Q1 2002, suppliers can go to ***DEAD LINK REMOVED***

Details on that page include: Q1 2002 book Q1 2002/SIM/Global Site Management Database Training Guide Q1 2002 Manufacturing Site Assessment.
 
K

Ken K

#4
I received a Q1 2002 Summary from Ford this morning. If there is interest, I'll send Marc a copy to post.
 

Marc

Hunkered Down for the Duration
Staff member
Admin
#5
Originally posted by Ken K

I received a Q1 2002 Summary from Ford this morning. If there is interest, I'll send Marc a copy to post.
You can upload it here in a reply in this thread as an attachment.

Or... You can e-mail it to me and I'll post it for you if you want me to.
 

Marc

Hunkered Down for the Duration
Staff member
Admin
#7
Originally posted by Ken K

Another new feature I missed.
Pretty nifty, eh? Any file up to 3 megabytes.

Hey.... This is a class act, here! :thedeal:
 
#8
As part of the Q1 2002 capability requirement, Ford requires that suppliers demonstrate certification to QS-9000/TS-16949 and compliance to MMOG/MS-9000/Odette no later than February 1, 2002, must also provide third party certification to ISO14001.
 
K

Ken K

#9
Just curious if the manual was helpful to those who downloaded it.
Also curious to hear your comments about this requirement.
 
R

Roger Eastin

#10
Sam - you mention that Ford requires (by 2002) "certification to QS9000/TS16949...". Ford, up to this date, has not required certification to QS9K. Is this a new requirement? They have, on the other hand, required certification (registration) to ISO14001.:ko:
 
Thread starter Similar threads Forum Replies Date
H Ford Customer-Specific Requirements for use with ISO/TS16949:2002 Customer and Company Specific Requirements 0
T Ford Q1 2002 revision the most current version? Customer and Company Specific Requirements 5
Marc Ford's Q1 for 2002 Customer and Company Specific Requirements 3
O IATF 16949 News Ford Motors Customer Specific Requirements Update - Nov 2020 IATF 16949 - Automotive Quality Systems Standard 5
C Ford's MMOG/le Template wanted Manufacturing and Related Processes 0
H FORD's project milestone acronyms Customer and Company Specific Requirements 4
R Ford Q1 Manufacturing Site assessment result Customer and Company Specific Requirements 3
Ron Rompen Ford Method - Position Capability with MMC Modifier Capability, Accuracy and Stability - Processes, Machines, etc. 14
M Ford Q1 Revocation Recovery Process Customer and Company Specific Requirements 5
A Is normal for FORD EU ask for the PSW every year APQP and PPAP 5
C A couple CSR (Customer Specific Requirements) questions... Esp. Ford & Toyota Customer and Company Specific Requirements 5
V What document to use to document Welding PV testing - Supplier to Ford APQP and PPAP 1
E Ford Phased PPAP and T2 timing APQP and PPAP 1
S Where to get Ford document FAP 03-111 FMEA and Control Plans 10
Q Ford's Q1 Score Prediction Customer and Company Specific Requirements 2
V Ford Dimensional Tag Characteristics requirements APQP and PPAP 2
R Ford Motor Company new CSR document - May 2014 Customer and Company Specific Requirements 1
K Q1-Ford - Does anyone have any Q1 templates? Document Control Systems, Procedures, Forms and Templates 2
Ron Rompen Ford Paint Audit Checklist Customer and Company Specific Requirements 4
S ASTM-D4000 & FORD "ZW" Call-Outs Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
S Dimensional Issues because of the last years FORD Recall Manufacturing and Related Processes 2
J JMP Gauge R&R with FORD MSA Data Quality Tools, Improvement and Analysis 2
A Statistical Software Calibration using Ford's "Sample Calibration File" Statistical Analysis Tools, Techniques and SPC 8
V Where I can find an AAR form on Ford Covisint? APQP and PPAP 1
Marc Ford is introducing an Aluminum F-150 Pick 'em Up Truck World News 1
V Webasto Ford Exceptions Form APQP and PPAP 1
Marc Ford - Self-parking technology called Fully Assisted Parking Aid World News 1
M Advise on R Chart with Ppk of 17.85 for Ford Capability, Accuracy and Stability - Processes, Machines, etc. 37
V What Ford Phase PPAP Level should DV testing be submitted? APQP and PPAP 1
Stijloor Ford - June 2013 Customer Specific Requirements (CSR) Customer and Company Specific Requirements 1
T What innovations led to Ford's production line? Coffee Break and Water Cooler Discussions 5
Ajit Basrur On Henry Ford's 150th Birthday, His Greatest Insight Has Been Tragically Forgotten Coffee Break and Water Cooler Discussions 11
D How long must we provide service parts to Ford? IATF 16949 - Automotive Quality Systems Standard 7
S Ford Motor Engineering Change Level definition Customer and Company Specific Requirements 6
C Will Ford accept AS9100 certification in place of ISO9001 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
R Ford SQDCME manual Manufacturing and Related Processes 1
D What is the Ford Troubled Supplier group? Manufacturing and Related Processes 7
V Ford SREA (Supplier Request for Engineering Approval) 2007 revision Document Control Systems, Procedures, Forms and Templates 2
C New Ford CQI 15 Rollout Requirement and reference to ESBC24-5005-AB IATF 16949 - Automotive Quality Systems Standard 3
D What is a Ford Single Scale? Customer and Company Specific Requirements 2
J Ford changing their acronym for Significant Characteristics from HIC to CTQ Customer and Company Specific Requirements 2
K How to fill out an SREA (Supplier Request for Engineering Approval) form at Ford? APQP and PPAP 3
G Ford - Type 1 Gage Study MSA (Measurement Systems Analysis) acceptable? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7
xfngrs What does the Ford Europe acronym ISRD stand for? APQP and PPAP 6
V Where to find FORD Specific PPAP Training Training - Internal, External, Online and Distance Learning 3
M For Bulk Material (eg. paint), are there any guidelines for Ford PPAP Requirements? APQP and PPAP 1
J Ford Acronym - What the acronym "ym" means in Ford lingo? Customer and Company Specific Requirements 1
B FORD CPA (Capacity Planning Analysis) User Guide for Suppliers Customer and Company Specific Requirements 13
C Does anyone have the Ford Supplier Requirements Manual (including Q1)? Customer and Company Specific Requirements 2
B TS16949 Annual PPAP Submission Requirements for Ford and Chrysler Parts IATF 16949 - Automotive Quality Systems Standard 2

Similar threads

Top Bottom