Brain Teaser for all you readers out there:
If you start a process (variable-continuous) and determine the process is capable. Then do a process capability study with which includes the production gage which shows an acceptable Cp & Cpk (lets say 2.0 - 3.0+).
Pick One:
A. Now I do a gage r&r study.
B I did a gage r&r before I did the process capabilty study
C. Don't run a gage r&r study
E. What the heck is a gage r&r
--> Tell me why!
---------------------------------------------
If you start a process (variable-continuous) and determine the process is capable. Then do a process capability study with which includes the production gage which shows an acceptable Cp & Cpk (lets say 2.0 - 3.0+).
Pick One:
A. Now I do a gage r&r study.
B I did a gage r&r before I did the process capabilty study
C. Don't run a gage r&r study
E. What the heck is a gage r&r
--> Tell me why!
---------------------------------------------