#3
That's a lot of media hype to get that "evildoer GM."

Problem is that in a court of law, all the "evidence" may not be admissible as it is subsequent remedial measures. It is the kind of corrective action we want a manufacturer to take if there is a potential problem with a device.
 
L

lk2012

#4
Thanks for this article Stijloor.
Even though it's a bit of a 'scary paper story' like most of the stuff we get in the media these days, it might just strengthen the position of QA on notificaitons.
I for one am constantly struggling with our plants getting the notifications through in enough time for the customers.
 

outdoorsNW

Quite Involved in Discussions
#6
News reports state that GM is recalling 2.6 million cars, so the $400,000 in tooling costs works out to less than $0.16 per car. Even if the tooling needed replacement a few times to make parts for 2.6 million cars, we are still looking at less than $2 per car.
 
Thread starter Similar threads Forum Replies Date
B TS16949 - PPAP Material Analysis Requirement - Plastic component supplier APQP and PPAP 10
B No Supplier PPAP or PSO (process approval) Requirement APQP and PPAP 3
J Supplier not responding to PPAP request APQP and PPAP 5
G Supplier delivered recent PPAP, should he deliver yearly layout inspection? IATF 16949 - Automotive Quality Systems Standard 4
A New Supplier implementation - PPAP vs APQP APQP and PPAP 9
N How to resolve discrepancies in Level 3 PPAP supplier dimensional reports? APQP and PPAP 11
H Manufacturer vs. Supplier - Which is which on PPAP Forms APQP and PPAP 3
P Automotive Supplier PPAP Level Requirements Supplier Quality Assurance and other Supplier Issues 12
B Should I Request/Submit a PPAP from/to a Supplier/Customer for only Repackaging Parts APQP and PPAP 7
V PPAP After Fire at Supplier APQP and PPAP 4
V Submitting Supplier Information in Customer PPAP APQP and PPAP 2
W Using a sub-supplier's PFMEA in PPAP Submission APQP and PPAP 4
D Supplier PPAP questions for CPK Capability, Accuracy and Stability - Processes, Machines, etc. 6
M Supplier PPAP for Interim Materials - Oil to test functionality of finished product IATF 16949 - Automotive Quality Systems Standard 4
G OEM resistance to Supplier / PPAP Change APQP and PPAP 5
S PPAP Supplier Submission Questions - Automotive Paint IATF 16949 - Automotive Quality Systems Standard 2
V We put Old plating spec on supplier prints and need to PPAP to Customer. APQP and PPAP 1
V Supplier's First Run had Plating Problems - Can they Strip, Re-Plate and PPAP them? APQP and PPAP 14
V Plating Supplier PPAP Revalidation Requirements - A-Coat GM 9984132 Plating Process APQP and PPAP 1
V Can't PPAP to Customer because a Supplier was Re-Sourced APQP and PPAP 2
S PPAP - Supplier Evaluation Responsibilities APQP and PPAP 1
S Who has to sign off on supplier PPAP? IATF 16949 - Automotive Quality Systems Standard 1
V Supplier?s PPAP - Production Process Control Plan Review, Evaluation and Approval? FMEA and Control Plans 5
V Do I need to have Supplier Master PPAP Samples? I see in AIAG 4.1 APQP and PPAP 4
V Supplier Moving Manufacturing Location after original PPAP APQP and PPAP 4
E PPAP PSW Approval: Customer Drawing or Supplier Drawing APQP and PPAP 4
V Repercussions for Interim Approval of Supplier PPAP's APQP and PPAP 3
Q Signal from Supplier to do PPAP? APQP and PPAP 10
Q Level of PPAP - Bulk Chemicals Supplier Requirements APQP and PPAP 2
Q What to do instead of PPAP for non ISO TS 16949 Certified Supplier? APQP and PPAP 23
Q Supplier PPAP - TS 16949 Clause 7.3.6.3: For what products? IATF 16949 - Automotive Quality Systems Standard 19
Q Supplier PPAP: Procedure or Flow Chart to define Responsibilities and Actions? APQP and PPAP 4
F PPAP Material Test Results Requirements - Material Supplier Identification QS-9000 - American Automotive Manufacturers Standard 1
B Supplier changed their Manufacturing Process - Is a PPAP resubmission required? APQP and PPAP 17
S PPAP Requirements for Submission to our Customers for a New Supplier APQP and PPAP 1
Q Supplier PPAP Requirements - TS 16949 Clause 7.3.6.3 IATF 16949 - Automotive Quality Systems Standard 12
C Sub-Supplier compliance to Ford Phase 0 PPAP (Run at Rate) APQP and PPAP 3
K Supplier PPAP Requirements - Level 3 or Level 4 APQP and PPAP 6
N On-Time Supplier PPAP Tracking APQP and PPAP 3
F Notification of Change of Material Supplier - PPAP Manual 4th Edition APQP and PPAP 15
P Supplier Responsibilities to Initiate a PPAP Submission APQP and PPAP 15
J Prior Notice of Sub-Supplier or Material Source Change - PPAP Requirements Question APQP and PPAP 13
N Supplier PPAP - How many parts should they submit? APQP and PPAP 6
B Cost for PPAP - Customer pays for samples and PPAP documentation from supplier APQP and PPAP 8
M Delayed PPAP - Supplier has delayed providing PPAP for 2 years APQP and PPAP 25
F Who should Sign Supplier PPAP (Production Part Approval Process) documents? APQP and PPAP 13
B PPAP approval based on information supplied by the supplier APQP and PPAP 2
S Supplier requesting Customer PPAP submission APQP and PPAP 5
R Out of Specification Parts from Supplier. Do we need to re-PPAP? APQP and PPAP 7
E Supplier PPAP - Section 7.3.6.3. - Our company received a minor - Help IATF 16949 - Automotive Quality Systems Standard 7

Similar threads

Top Bottom