Has anyone ever written a Quoting Process?

al40

Quite Involved in Discussions
Has anyone ever written a quoting process? I'm trying to do one and I'm at a loss at what it should contain other than the basic contract review items.

Thanks,
al40
 

BradM

Leader
Admin
Actually, that's a pretty decent question. From my construction days, the quote process could become pretty involved.

I would think it should have an expiration date on it. Also, it should have criteria for you performing the work.

For example, when I would quote calibration work, I would always need to include having ready access to the equipment. If it was a high temperature furnace, it would need to be cooled down. I would need to also note if I expected them to have a forklift available, did they provide a lift (or was I), etc.

Depending on your line of work, I would think a simple checklist to make sure all the basis are covered. Even if you're just selling equipment, noting what is included (not included), warranty, extended warranty, etc. might be things that should be addressed.
Just some thoughts.
 

Wes Bucey

Prophet of Profit
Has anyone ever written a quoting process? I'm trying to do one and I'm at a loss at what it should contain other than the basic contract review items.

Thanks,
al40
Disclaimer:
The stuff I write here in the Cove worked for me primarily because we (our organization) were well-financed and NOT desperate for business and thus did NOT have to grovel before buyers.


Several years ago, I wrote about my quoting process (quoted below.) This type of process really is pertinent only for organizations providing custom products or services, not off-the shelf products or hourly based services where everyone understands the estimated number of hours is subject to adjustment based on conditions found on the job.
http://elsmar.com/Forums/showpost.php?p=101893&postcount=3
Contract Review
When I was in the high tech contract machining business, "comparison quoting" was a common practice for purchasing agents.

I saw the process as a wasteful intrusion on a supplier if (as in many cases) the purchasing agent was just blatantly looking for ammunition to beat his current supplier over the head and there was little or no hope of getting the job away from the current supplier.

We turned the process on its ear by countering a request for quotation (from a new prospect who was not a current customer) with an immediate phone call asking simple straightforward questions like

  1. Do you currently buy this from anyone else?
  2. If so, why are you seeking other quotes? Are you dissatisfied with quality? service? price?
  3. If this is a new product, how many folks are you asking for quotes?
  4. What are your true quantity projections per year? How do you know?
  5. Would you like to engage in a concurrent engineering session to help your engineers work out the most inexpensive design to fit form, fit, function requirements?
If the prospect balked at answering the questions, we simply said, "OK! Our answer is NO QUOTE!" Always seemed much more efficient to weed out shoppers and fools BEFORE spending time and money on working up a quote. We also no quoted if the answers weren't to our liking.

(If we got past the initial questions, we always had more, but they were all focused on getting a clear understanding of requirements.)
 
J

Jeff Frost

Yes my organization wrote a quotation process instruction. Elements of the process include what is required by the QMS Standard, what are the known requirements of the product we sell, what does the sector we sell to require (or will be selling to require), and what do we as an organization need from the customer.

Our process involves the following:

- Review of quotation request
- Obtaining customer drawings
- Obtain and review specifications and standards listed on quote or drawing
- Comparison of customer requirements to company requirements (specification/drawings)
- Determination of additional requirements for product we sell that customer is unaware of but required for the product
- Determination of what customer requirements that we will take exception to
- Formal written response with TC of sale
 
Thread starter Similar threads Forum Replies Date
P Has anyone ever heard of the Eastern Weighing and Inspection Bureau? Calibration and Metrology Software and Hardware 1
D ?Pa? Capability Index - Has anyone ever heard of this? Capability, Accuracy and Stability - Processes, Machines, etc. 5
R Mix Multi-Site/Individual Certification - Has this ever happened to anyone? Miscellaneous Environmental Standards and EMS Related Discussions 14
P Has anyone ever heard of "Quality Gates" (Volkswagen term?) - APQP and PPAP APQP and PPAP 11
I Has anyone ever heard of Registrar QSRD-International? Registrars and Notified Bodies 36
S Cappsnt Software - Has anyone ever used Cappsnt software for a CMM? General Measurement Device and Calibration Topics 1
T Resolution Analysis - Has anyone ever performed a Resolution Analysis? General Measurement Device and Calibration Topics 1
C Has anyone ever heard of Informance software? Monitors machine uptime/downtime (OEE) Preventive Action and Continuous Improvement 11
J Has anyone ever been harmed by a CMM (coordinate measuring machine)? Coffee Break and Water Cooler Discussions 11
R Has anyone ever performed a MSA study on a profilometer? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
B Has anyone ever had to submit a DMF (Drug Master File) with the FDA? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 6
P Has anyone ever heard of a Certificate of Quantity? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
K Has anyone ever written a non conformance against their registrar? Their reaction? Registrars and Notified Bodies 16
J Has anyone ever used a Management Representative Committee for their QMS? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
S Has anyone ever heard of an International Standard for date sequence? Other ISO and International Standards and European Regulations 2
A Has anyone implemented the Adobe Acrobat Sign Validation Pack to be 21 CFR Part 11 Compliant? ISO 13485:2016 - Medical Device Quality Management Systems 9
S Has anyone had experience with Intellect eQMS? ISO 13485:2016 - Medical Device Quality Management Systems 1
H Does anyone has feedback on a notified body for small companies? EU Medical Device Regulations 3
H Has anyone undergone MDR FQA review yet? EU Medical Device Regulations 10
M Has anyone has been through an MDR audit? (3/2020) EU Medical Device Regulations 1
M Has anyone heard of Run at Risk? Manufacturing and Related Processes 15
B ASA Aviation Supply Association - Has anyone heard of ASA? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B Has anyone done an IEC 60601-1 gap analysis to IEC 60335? Medical Device and FDA Regulations and Standards News 4
D Has anyone had sudden challenges from Korea-MFDS? Other Medical Device Regulations World-Wide 1
Dobby1979 FDA Biomarker Qualification Program - Has anyone prepared an application? Medical Device and FDA Regulations and Standards News 0
L Has anyone heard of the 2 pan system? Manufacturing and Related Processes 6
M Has anyone here assessed the latest Abbreviated 510(K) guidance document? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
D Has anyone undergone a BARDA (HHS) audit as part of their grant process? Other Medical Device Regulations World-Wide 0
Sidney Vianna LinkedIn bug - Anyone has any idea of how to fix this? Posts not showing for me in a Group feed. Coffee Break and Water Cooler Discussions 2
K Has anyone used QAI for training? Training - Internal, External, Online and Distance Learning 7
D Has anyone here had any experience with PQ-FMEA software? FMEA and Control Plans 1
S Has anyone completed IATF 16949 Certification - Share your Audit Experience? IATF 16949 - Automotive Quality Systems Standard 2
S Has anyone created a Turtle Diagram reflecting the new ISO 9001:2015 Structure? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M Has anyone done a Gage R&R for Spectrophotometer? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 10
T Has anyone completed the AS9100D Quality Manual transition? Quality Management System (QMS) Manuals 1
D Has anyone taken the AS9100 Delta course / exam? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 37
D Medica show in Dusseldorf - Has anyone else gone? Other Medical Device and Orthopedic Related Topics 3
A AS9100C to D - Has anyone done a gap analysis? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T Has anyone been through the ISO 14001:2015 process? ISO 14001:2015 Specific Discussions 12
Marc Has anyone here gotten Gigabyte Fiberoptics (Internet) to home? Coffee Break and Water Cooler Discussions 3
M Has anyone had their electronic system scrutinized in an FDA inspection? Records and Data - Quality, Legal and Other Evidence 16
M Has anyone successfully challenged the new IATF site extension change? IATF 16949 - Automotive Quality Systems Standard 36
R Does anyone know why the TC 176 website has been hijacked by CSA? ASQ, ANAB, UKAS, IAF, IRCA, Exemplar Global and Related Organizations 1
GStough Rx-360 - Has Anyone Used This and What Was Your Experience? Supplier Quality Assurance and other Supplier Issues 3
A Has anyone made an ISO9001:2015 vs. ISO9001:2008 Matrix ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 32
I Has anyone read BIP 0115:2014? ISO 13485:2016 - Medical Device Quality Management Systems 5
optomist1 Has anyone recently taken the GD&T ASME Y14.5M Certification Exam Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
T Has anyone considered what logic is? Coffee Break and Water Cooler Discussions 23
Jim Wynne Has Anyone Had Trouble with IMDS 8.0? RoHS, REACH, ELV, IMDS and Restricted Substances 17
G Has anyone used shlomo Aviv-lean consultant? Lean in Manufacturing and Service Industries 1

Similar threads

Top Bottom