Has PPAP Version 3 made compliance harder for you?

J

Jarrod

#1
PPAP Version 3

Has anyone heard of any suppliers or manufacturers having problems due to PPAP Version 3 that went into effect last week? Just wondering, from my perspective, I thought lots of companies would be caught due to this change...If you know anything, please let me know! Thanks

------------------
Jarrod
 
Elsmar Forum Sponsor
D
#2
I have a question on the new form CFG-1001. Can anyone tell me what Mold/Cavity/Production Process means? It is a line item on the form and we are submitting PPAP with this form and our customer doesn't even know what it means (Tier 1). The only explanation in the manual is to complete it. Also, "I further warrant these samples were produced at the production rate of _________/8 hours. I have noted any deviations from this declaration below." Any suggestions?
 

Howard Atkins

Forum Administrator
Leader
Admin
#3
Mould/cavity/process/ refers to M/C plastic parts or metal stamping etc, how many cavities are produced . Process is the process used. I have also been asked to put the % of regrind used in this place.
8 hours.... refers to the significant production run, see 1.2.1.
 
Thread starter Similar threads Forum Replies Date
O PPAP'ed part manufacturer has discontinued production Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 7
K Should APQP/PPAP has its own section in a QM? Quality Management System (QMS) Manuals 1
J PPAP for New Family Revisions when the Part has not changed APQP and PPAP 4
C Gage R&R/MSA for PPAP - Our product has no variance Statistical Analysis Tools, Techniques and SPC 9
A PPAP Sample Requirement - Using Product which has been Re-Worked APQP and PPAP 6
M Can I release an "Approved PPAP" if one purchased component has a Interim Approval APQP and PPAP 2
P Has anyone ever heard of "Quality Gates" (Volkswagen term?) - APQP and PPAP APQP and PPAP 11
S Who has to sign off on supplier PPAP? IATF 16949 - Automotive Quality Systems Standard 1
M Delayed PPAP - Supplier has delayed providing PPAP for 2 years APQP and PPAP 25
kedarg6500 Our supplier has submitted PPAP documents - What do I do next Supplier Quality Assurance and other Supplier Issues 7
A ProE for PPAP - Has anyone used ProE modelling tool during PPAP submission? Quality Assurance and Compliance Software Tools and Solutions 1
S AIAG PPAP 4th Edition - Has anyone heard what the change(s) will be? APQP and PPAP 42
C Re-PPAP My Parts? Production layout has changed APQP and PPAP 6
M Update to software after CE-certificate has expired. EU Medical Device Regulations 1
A Has anyone implemented the Adobe Acrobat Sign Validation Pack to be 21 CFR Part 11 Compliant? ISO 13485:2016 - Medical Device Quality Management Systems 9
Richard Regalado Informational ISO/IEC 27001:2022 has been published IEC 27001 - Information Security Management Systems (ISMS) 0
Newbie22 UKCA - Placing on the market after CE certificate has expired Manufacturing and Related Processes 6
S Has anyone had experience with Intellect eQMS? ISO 13485:2016 - Medical Device Quality Management Systems 1
J Has the facility been inspected? question in Certificate to Foreign Government application Other US Medical Device Regulations 0
T Does marketing company require CE mark if manufacturer has CE mark on product? EU Medical Device Regulations 5
D IATF Requirements if remote plant has no interface with OEMs who are part of IATF? IATF 16949 - Automotive Quality Systems Standard 6
H Does anyone has feedback on a notified body for small companies? EU Medical Device Regulations 3
K 10 parts, 4 operators, 3 replications and each part has 3 location to measure. Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
H Has anyone undergone MDR FQA review yet? EU Medical Device Regulations 10
J How to keep MDD certificate valid when legal manufacturer has liquidity problem EU Medical Device Regulations 0
G Special 510K possible? Only the packaging has changed Other US Medical Device Regulations 0
Louddogsbark When your 13485:2016 certificate has been pulled ISO 13485:2016 - Medical Device Quality Management Systems 2
lanley liao What shoud i do if our company top management has been changed. Oil and Gas Industry Standards and Regulations 8
S PSW - Requirements for "off-the shelf" component that has multiply manufacturing locations Off the Shelf Item Manufacturing and Related Processes 1
L GRR for a tolerance that has changed Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 6
D Partial FAI - AS9102 - One single drawing has 10 part numbers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
BeaBea ISO 9001 Customer Feedback Methods - What has worked for your company? Service Industry Specific Topics 17
S Has anybody done IMS - Management Review Meeting ISO 14001:2015 Specific Discussions 8
M Has anyone has been through an MDR audit? (3/2020) EU Medical Device Regulations 1
M Has anyone heard of Run at Risk? Manufacturing and Related Processes 15
B ASA Aviation Supply Association - Has anyone heard of ASA? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B Has anyone done an IEC 60601-1 gap analysis to IEC 60335? Medical Device and FDA Regulations and Standards News 4
Z 510(k) usage - Company has 2 physically similar products Medical Device and FDA Regulations and Standards News 2
D Has anyone had sudden challenges from Korea-MFDS? Other Medical Device Regulations World-Wide 1
Sidney Vianna IAQG News IAQG has a new website - December 2019 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
Richard Regalado ISO 22301:2019 has been published - Nov 2019 Business Continuity & Resiliency Planning (BCRP) 0
S FAIR - If we have not produced a part in over 2 years, but nothing has changed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Nicole Desouza Who has to be compliant with REACH Declarations? REACH and RoHS Conversations 11
CycleMike GD&T - Hole pattern - Print (attached) has a single Datum Reference Frame Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
Al Rosen Would an MRP system that has been in use for over 10 years require validation? ISO 13485:2016 - Medical Device Quality Management Systems 6
W Informational VDI 2017 - Medical Grade Plastics - German VDI has published a "Richtlinie" Other Medical Device Related Standards 1
D FDA Biomarker Qualification Program - Has anyone prepared an application? Medical Device and FDA Regulations and Standards News 0
U Hand-Held dosing device has no PATIENT - Interpretation of the PATIENT definition IEC 60601 - Medical Electrical Equipment Safety Standards Series 6
L Has anyone heard of the 2 pan system? Manufacturing and Related Processes 6
N Technical File Reviewer has requested more testing to ISO 10993 Other Medical Device Related Standards 10

Similar threads

Top Bottom