Have any of you submitted PPAP to Volvo using their DMIS measurement system?

  • Thread starter funkyoldcortina - 2006
  • Start date
F

funkyoldcortina - 2006

#1
Hello all, first post so go easy, :bigwave:

Have any of you submitted PPAP to Volvo using their DMIS measurement system.
Are the measurement reports in the ppap binder to the manf drawing or the MP drawings?

MP drawings are new to us and have ben causing much confusion! :bonk:

any help appreciated

Dave
 
Elsmar Forum Sponsor
G

gszekely

#3
Dmis

Years back, programming CMM's, DMIS, meant for me Dimensional Measurement Interface Standard. Text editable programming language for some CMM's. (I used in case of Werth)
http://www.dmis.com/
I don't know more, about Volvo's expectation, but I have never heard about any DMIS measuring system. If you have an approved 3D measurement program, where you simultaneously measure more characteristics, you may be asked to supply the printed form of the program, where they can review how did you build up the measuring program. That's all what comes in my mind.
Gyorgy
 
Q

qinlan

#4
I think that the MP drawing means a drawing with marking number of measured dimension. when we submit ppap to our costumer, we need bider it to MP drawings.
 
F

funkyoldcortina - 2006

#5
feedback

Hi again all,

Well and truely been there done that and got the T shirt now so i thought i feedback for everyone elses benifit.

MP drawings are in addition to the assy drawing and consist of front sheet with iso view of part showing the datum / support structure used to hold the part in measurement etc. This is normaly as the part is fitted to teh car as i understand it.

Further pages show the part and identify specfic POI that are called off using a code. Next to this is a reference table with the co-ordinates of said points.

These are programmed to the CMM in a special program that can be read by volvo system. You measure the part to this, load the results up to the web (txt files and very very hard to alter unless you are good at code) and then Volvo can see exactly where you parts are in relation to every component int he vechile!!

Now this is the really clever bit, if you are showing a consistent product that is off to one side of teh tolerence band (hence not a good Cpk value) they can look at the area and the vehicles they are building and if it dosent affect them they tell you not to move it! rather than spend ages tuning your part for no reason, equaly (i work with BIW and closures) if a panel needs you hardware matching to it they may ask you to move your part within the tolerence band using new target co-ordinates!

sorry for the long post but hope it is useful!

D:bigwave:
 
B

bigkevin

#6
We have submitted PPAP Lev. 3 to Ford STA, PSW made out for Volvo Corp.
And then we have sent approved PSW to Volvo....
No extra work ;) :applause: :applause: :applause:
 
Thread starter Similar threads Forum Replies Date
V What Ford Phase PPAP Level should DV testing be submitted? APQP and PPAP 1
Q Requirement for All Dimensions on the Print on the Control Plan submitted with PPAP APQP and PPAP 19
S Can PPAP be submitted when not all customer requirements can be met? APQP and PPAP 5
J Laboratory Scope - Submitted a new PPAP for approval and the SQA rejected it General Measurement Device and Calibration Topics 16
kedarg6500 Our supplier has submitted PPAP documents - What do I do next Supplier Quality Assurance and other Supplier Issues 7
D Not a SaMD - How to be submitted for marketing authorization in EU and USA CE Marking (Conformité Européene) / CB Scheme 5
shimonv Referring to previously submitted biocompatibility results in a new 510(k) submission Other US Medical Device Regulations 1
E Changes to medical device submitted through a variation? EU Medical Device Regulations 1
S Conduct Customer Satisfaction Survey for every submitted Bid? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
H Follow up mail for the submitted resignation, reminder mail of submitted resignation Career and Occupation Discussions 4
Q The Internal Audit Report will be submitted to myself Quality Manager and Management Related Issues 5
K First Article Inspection - What are the Documents that need to be submitted with it? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
S Have you submitted a Technical File yet? Directive 2007/47/EC CE Marking (Conformité Européene) / CB Scheme 10
A CDRH Guidance Document - Software bugs submitted in 510(k): Quantity or Quality? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
D Should QSRD codes be included in Documents Submitted to Regulatory Bodies? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 0
S ASQ Six Sigma Black Belt - Format or any samples of two projects submitted Six Sigma 3
M Auditor interpretation of PO data - PO submitted for outside calibration General Auditing Discussions 2
J Supplier not responding to PPAP request APQP and PPAP 5
J Part submission warrant for Level 1 PPAP APQP and PPAP 1
K Should APQP/PPAP has its own section in a QM? Quality Management System (QMS) Manuals 1
B Toyota PPAP Process - Three Questions APQP and PPAP 3
G Supplier delivered recent PPAP, should he deliver yearly layout inspection? IATF 16949 - Automotive Quality Systems Standard 4
F How to submit a PPAP when a subcontractor is the sole manufacturer IATF 16949 - Automotive Quality Systems Standard 2
P PPAP samples retention time IATF 16949 - Automotive Quality Systems Standard 5
K Updated MSA with the Annual PPAP validations APQP and PPAP 8
P Managing How PPAP Requirements are Communicated in the Manufacturing Process and to Suppliers APQP and PPAP 5
E Annual PPAP+ deviation request ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
K OEM specific requirements - PPAP was rejected by STA Customer and Company Specific Requirements 5
T PPAP for distributors? APQP and PPAP 1
A PPAP for Fire extinguisher APQP and PPAP 2
S PPAP Progress - Visual Status Board APQP and PPAP 0
C AS9145 Appendix D PPAP Approval Form APQP and PPAP 2
Pau Calvo PPAP customer requirements in the APQP APQP and PPAP 25
V 3 PQ lots mentioned as requirement in PPAP. Is this necessary? APQP and PPAP 2
B What is the role of Quality Engineer in APQP and PPAP APQP and PPAP 3
F How to submit PPAP without IMDS APQP and PPAP 10
GreatNate Excel PPAP Tracking templates or tool wanted APQP and PPAP 1
M Where can I find examples of PPAP? APQP and PPAP 6
R Process Specification - What is the name of this PPAP form? APQP and PPAP 15
I PPAP Assembly and Components Manufacturing and Related Processes 3
F PPAP Documentation Control APQP and PPAP 8
K PPAP Phases Vs PPAP Levels APQP and PPAP 2
R Plan to Volvo Cars for capacity verification in Phase 3 of PPAP Customer and Company Specific Requirements 3
G Job interview - So I have to do a presentation on PPAP APQP and PPAP 16
J AIAG PPAP: 2.2.11.3 Acceptance Criteria for Initial Study (page 9, 4th edition) APQP and PPAP 1
M Level 3 PPAP submission of intentional defective parts APQP and PPAP 4
L Reasons to submit a new PPAP or notify the customer APQP and PPAP 3
eule del ayre List of Level 3 PPAP requirements for automotive suppliers APQP and PPAP 20
A New Supplier implementation - PPAP vs APQP APQP and PPAP 9
E Nissan (Renault) PPAP Acronyms (DNote , KFD, IR) APQP and PPAP 2

Similar threads

Top Bottom