Hi..
PPAP Standards for Production Part Approval process. Its conatins FAI ( First article inspection report) which has to be provided by vendor/ supplier, which will be made for production tools 300 parts will be produced. among 300 parts 30 parts will be randomly selected & again 3 parts will be selcted among 30 parts, which will be made FAI. Also we have cp & CPK study ( process capability & process capability index) which is to estimate parts for rejection. Also PPAP contains GRR study which provides information about setups for measuring dimensions ( CMM stup, vernier, optial measuring m/c's etc). PPAP also contains material study ( Material used for this product) like %, composition, mechanical study etc. Additional reports like Colour matching, chemical analysis reports will be prodvided.
This report has to be approved by Responsbile design engineer before moving to production. Let me know any information required for this .