Re: Engineering Specifications
"4.2.3.1 Engineering specifications
The organization shall have a process to assure the timely review, distribution and implementation of all customer
engineering standards/specifications and changes based on customer-required schedule. Timely review should be
as soon as possible, and shall not exceed two working weeks."
I don't think it's possible to misintrepret this. The above lumps engineering standards/specifications and changes together as needing timely review and then further defines timely review as not exceeding two working weeks.
Therefore I still have an issue. Any ideas?
Jen
"4.2.3.1 Engineering specifications
The organization shall have a process to assure the timely review, distribution and implementation of all customer
engineering standards/specifications and changes based on customer-required schedule. Timely review should be
as soon as possible, and shall not exceed two working weeks."
I don't think it's possible to misintrepret this. The above lumps engineering standards/specifications and changes together as needing timely review and then further defines timely review as not exceeding two working weeks.
Therefore I still have an issue. Any ideas?
Jen