Q

QualityQ

#21
Re: Contract Review and Engineering Change System

Hi,
I know that this conversation ended years ago but does anyone know the answer of the following question?
Referring to the article 4.2.3.1 of ISO 16949 (Timely review should be as soon as possible, and shall not exceed two working weeks.), how do I manage it with customers like GM or Daimler? There is no automatic notifying e-mail? Do I still have to check their web site every 2 weeks?
Thanks,
Elif
 
Elsmar Forum Sponsor

qusys

Trusted Information Resource
#22
Re: Contract Review and Engineering Change System

Hi,
I know that this conversation ended years ago but does anyone know the answer of the following question?
Referring to the article 4.2.3.1 of ISO 16949 (Timely review should be as soon as possible, and shall not exceed two working weeks.), how do I manage it with customers like GM or Daimler? There is no automatic notifying e-mail? Do I still have to check their web site every 2 weeks?
Thanks,
Elif
I suggest you to review the process in place checking their supplier manual if there is a requirement in this sense from their side.
However, the clause 4.2.3.1 refers to your organization that shall have a procedure ( not documented) to assure the timely examination , distribution and implementation if all technical specs of the customer and related modifications.
Hope this helps:bigwave:
I do not know how they proceed in this sense
 
Q

QualityQ

#23
Re: Contract Review and Engineering Change System

Actually, I have discussed this problem with my SQE. He also said that even in GM they do not have any solution for this problem. He told that he sometimes has the oldest versions of some standards.
We nearly work for all OEM's and we review all websites without a notifier every 2 months. In the meantime, if we receive any notification e-mail from any customer, we review it and inform our customer max within 2 weeks.
I hope it's ok, in terms of ISO 16949 requirements.
Thanks,
Elif
 

qusys

Trusted Information Resource
#24
Re: Contract Review and Engineering Change System

Actually, I have discussed this problem with my SQE. He also said that even in GM they do not have any solution for this problem. He told that he sometimes has the oldest versions of some standards.
We nearly work for all OEM's and we review all websites without a notifier every 2 months. In the meantime, if we receive any notification e-mail from any customer, we review it and inform our customer max within 2 weeks.
I hope it's ok, in terms of ISO 16949 requirements.
Thanks,
Elif
Hi, take into account that a change will require an updated record of customer production part approval when the specifications are referenced in the design record, or if the change affects PPAP documents.
ECN is usually used to witness the change and the date of implementation.
Hope this helps:bigwave:
 

Jim Wynne

Staff member
Admin
#25
Re: Contract Review and Engineering Change System

Actually, I have discussed this problem with my SQE. He also said that even in GM they do not have any solution for this problem. He told that he sometimes has the oldest versions of some standards.
We nearly work for all OEM's and we review all websites without a notifier every 2 months. In the meantime, if we receive any notification e-mail from any customer, we review it and inform our customer max within 2 weeks.
I hope it's ok, in terms of ISO 16949 requirements.
Thanks,
Elif
You can use a service such as the one that IHS provides to get notifications of changes in OEM standards, or you can develop your own system. At a minimum, you should be checking for the latest versions with each new PO, and keeping a record of it.

In 1998, when GM had set a deadline for suppliers to be registered to QS9000, they announced that Boise Cascade would be the official keeper of standards, and that they should be contacted for information as to the latest revisions. Unfortunately, they apparently forgot to tell Boise Cascade, and when queried about revision levels of the standards the customer service people said they knew nothing about it and didn't know how to verify the revision levels.

4.3.2.1 generally applies to what must be done once you're notified or become aware of a new revision of a standard or customer specifications. The best you can do is be reasonably diligent in verifying that you're working to the latest standards, and keep records of your actions in that regard.
 

qusys

Trusted Information Resource
#27
Re: Contract Review and Engineering Change System

:thanx:Thanks so much.
I would like to add that the requirement could be also addressed under “review of the requirement related to product” given that any customer documents are included in the contract and “contract review” should satisfy the clause before acceptance and implementation .
Customer representative is the right person to manage this issue you are dealing with.:bigwave:
 
Last edited:
Q

QualityQ

#28
Re: Contract Review and Engineering Change System

Hi,
I agree with you. If we have any RFQ, PPAP submisson for new part or re-PPAP submission for a modification, we do check related standards.
But let's say the standard GM XYZ is modified and our company didn't get any e-mail or any other notifier from any website. And as we check it every 2 months, we found it out only at that time. Is that ok?
Regards,
 

Jim Wynne

Staff member
Admin
#29
Re: Contract Review and Engineering Change System

Hi,
I agree with you. If we have any RFQ, PPAP submisson for new part or re-PPAP submission for a modification, we do check related standards.
But let's say the standard GM XYZ is modified and our company didn't get any e-mail or any other notifier from any website. And as we check it every 2 months, we found it out only at that time. Is that ok?
Regards,
Your original question was "Do I...have to check... every two weeks?" this being in reference to the requirement for timely review. You can't review something that you don't have, so the requirement is not to check every two weeks, but to begin the review with two weeks of receiving updated requirements. Whether or not verification of revision levels every 2 months is adequate, I can't say. It depends on how many standards you have to keep track of, the criticality of the requirements, and other things not in evidence here. What you need to concern yourself with is the possibility that you will do work to outdated requirements, and the risks involved with that.
 

qusys

Trusted Information Resource
#30
Re: Contract Review and Engineering Change System

Hi,
I agree with you. If we have any RFQ, PPAP submisson for new part or re-PPAP submission for a modification, we do check related standards.
But let's say the standard GM XYZ is modified and our company didn't get any e-mail or any other notifier from any website. And as we check it every 2 months, we found it out only at that time. Is that ok?
Regards,
If you find a very fiscal CB auditor saying that if there is a modification today and you checked the web-site the day before , you shall miss the modification and you will be able to check it only within two months minus one day:(
The best approach could be a daily check at the beginning and at the end of the working day...very safe approach...
It does not require lot of time: In any case, consider that the role of customer is key in this sense, they shall alert!bigwave:
 
Thread starter Similar threads Forum Replies Date
Q How to handle customer request for changing specifications 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
D Responsibility of Distributor for Customer Complaints - How should we handle this Customer Complaints 5
K How to Handle an Invalid Customer Complaint? Customer Complaints 24
Y How to handle difficult customer - Improving my communication skill and techniques Service Industry Specific Topics 5
D Internal form we use to handle Customer Complaints - To control or not to control Customer Complaints 6
M How to handle changed Customer Specifications or Requirements IATF 16949 - Automotive Quality Systems Standard 4
K Different Indications for Use in Different Countries -- how to handle IFU? Other Medical Device Regulations World-Wide 4
K How to handle GTINs for different configurations of one device with one part number? Other Medical Device Related Standards 0
I How to handle pending FSN when incident happens? EU Medical Device Regulations 1
Jimmy123 Process disturbances and the repair - How do you handle this risk in your company? FMEA and Control Plans 18
GoSpeedRacer How to handle operator involvement in the non conformance ISO 13485:2016 - Medical Device Quality Management Systems 5
A How to Handle Documented Information in an online database for ISO 9001:2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
O How will you handle Clause 6.1 - Risks and Opportunities for AS9100 Rev. D Auditors? Risk Management Principles and Generic Guidelines 22
V Systems to Handle Development and Batch Analysis in same Laboratory Qualification and Validation (including 21 CFR Part 11) 3
dubrizo How do you handle damaged IM&TE in your organization? General Measurement Device and Calibration Topics 3
D MDD Classification of Bone Saw Handle ISO 13485:2016 - Medical Device Quality Management Systems 1
1 How to handle Nononformances in Clincal Manufacturing ? Nonconformance and Corrective Action 2
R How do we handle Training during transition and overlap from one system to other ? Training - Internal, External, Online and Distance Learning 4
Q How to handle different voltages for different countries Document Control Systems, Procedures, Forms and Templates 1
A How to handle complaints after end of specified medical device life-time ISO 13485:2016 - Medical Device Quality Management Systems 5
M How does Australia handle products that are EU PPE, but Australia Medical Devices? Other Medical Device Regulations World-Wide 7
C How to handle this Inspection conflict? Second Shift Inspector? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
T How to handle Demo Units during an ISO 9001 Audit General Auditing Discussions 3
C ISO 9001 Nonconformances an how to handle them ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
D How to handle a blood stained GMP document ? Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 6
T How to handle 510(K) submisison in 2014 when the Fees were paid in FY13 ? US Food and Drug Administration (FDA) 3
C How to handle Action Results in a new FMEA Review once we have a new RPN? FMEA and Control Plans 1
Mikishots How to handle CAR (Corrective Action Request) Scope vs. Timely Response Nonconformance and Corrective Action 9
J Quality Procedure to handle some standard Medical Device Processes Document Control Systems, Procedures, Forms and Templates 1
L How to handle a Business Shutdown - Business Dissolution 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
D Plan & Procedure to handle a Product that's being Withdrawn from the Market 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 6
J Can you handle passivated parts without wearing gloves? Manufacturing and Related Processes 5
A How to handle the various Document Revisions Document Control Systems, Procedures, Forms and Templates 2
N How to handle Quality and Safety Deficiencies ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
L Client that refuses to help - How to handle ? Misc. Quality Assurance and Business Systems Related Topics 5
C How to handle Outsourcing with Same Site - Separate Cert ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
B How to handle Medical Device Emergency Software Releases Software Quality Assurance 4
B How to handle/follow supervisor and department head with different supervisory style? Quality Manager and Management Related Issues 7
Z If this is a Nonconforming Product (Service) under clause 8.3? How do we handle it? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
R How to Handle 'Scrap and Replace' of Non-Conforming Products Nonconformance and Corrective Action 9
B Upper Management makes changes to a report - How do I handle this? Six Sigma 12
J SOP for How to Handle an Investigation wanted Document Control Systems, Procedures, Forms and Templates 1
J AS9100 C - 7.5.1.3 - How do you handle Production Equipment Maintenance? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
J Seeking advice on how to handle a Special Process Nonconformance AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
M How to handle the task of Organizing a Regulatory File Room Document Control Systems, Procedures, Forms and Templates 2
V ISO 26262 - How to handle OEM ASIL A (Automotive Software Integrity Requirements) Other ISO and International Standards and European Regulations 4
M How to handle Rejections of a Internal NCR event Nonconformance and Corrective Action 7
G Manufacturing Process Subcontracted - How do I handle Cl. 7.5? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 16
P How to handle Out of Tolerance during Calibrations and exceeded Alert Action Limits Quality Manager and Management Related Issues 4
M The importance of Document Control? How do you handle your Document Control? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2

Similar threads

Top Bottom