William G
I have implemented Lean in many locations, but I must say that I have been spoiled. All of my locations have allowed me to move the operations within a few feet of each other and create a visual pull systems quite easily. Now I am on a job where the operations are performed on very large machines and they are arranged in a traditional functional layout, ie. one department per building. While I have many ideas on how to create a visual signaling system to create my pull system. I would like to know from those with the same issue, how you are doing it, and how successful it is? eventually with time and lots of money to move everything, I will create cells.
Thanks
William
Thanks
William