We are in the process implementing a documentation system. I received a rejection from our customer. Part was made to wrong rev. What would be the proper procedure to follow to correct this. Here's what I did please comment on how to improve.

Customer notifies us part is wrong.
Issue a corrective action report.
- problem, wrong rev
- cause, eng not notified of change (buried in email)

-corrective action, update files to new rev, remake part.
-preventive action, ? other than paying more attention not sure.

Issue a ECO to update rev.

Should I have a nonconforming in here as well?

Thanks
 
Elsmar Forum Sponsor

ScottK

Not out of the crisis
Staff member
Super Moderator
#2
Re: How NCR CAR and ECO interact

Well, there's a million ways to handle it. Here's what my system does:

1. Customer submits an NCR to us using their own NCR system
2. I turn that NCR into a RMA (returned material authorization)
3. When we get the material we analyze the parts and document the analysis on the RMA Form.
4. The RMA may result in a Corrective Action and/or action to prevent recurrence (Preventive Action) which is documented on a Corrective and/or Preventive action form. This may result in a drawing or procedue change handled via a DCR (Document Change Record)
5. We send a formal response to the customer documenting what we did and any actions that resulted.

All of this is covered in three procedures - RMA Procedure, CAPA procedure, Document Control Procedure.

in your particular case, using my system, I would issue a corretive action to engineering to document and correct the nonconformity.
 

Stijloor

Staff member
Super Moderator
#3
Re: How NCR CAR and ECO interact

<snip>Here's what I did. Please comment on how to improve correct.

Customer notifies us part is wrong.
Issue a corrective action report.
- problem, wrong rev
- cause, eng not notified of change (buried in email)
Your actions are NOT improvements. What you are suggesting is an attempt to correct the situation. You need ask WHY a few more times. The fact(?) that engineering was not notified of the change is only a SYMPTOM and not a root cause...

Hope this clarifies.

Stijloor.
 
D

DrM2u

#4
Re: How NCR CAR and ECO interact

Customer notifies us part is wrong.
Issue a corrective action report.
- problem, wrong rev
- cause, eng not notified of change (buried in email)

-corrective action, update files to new rev, remake part.
-preventive action, ? other than paying more attention not sure.

Issue a ECO to update rev.
Not to sound too critical but I have to say that the response is poor and personally would not accept it if I were the customer. Like Stijloor indicated you are addressing the simptom that you are seeing, which is OK for the short run. However you need to perform an in-depth root cause analysis in order to take effective action(s) to prevent this from happening again. IMHO I suggest to put together a team of people to help solve this. Select members who are directly involved in the process. After that, follow Stijloor's advice and ask WHY many times until you reach a dead end (a.k.a. root cause). Look at the problem from prevention, detection and occurence mode points of view. Why wasn't this prevented? Why wasn't this detected? Why did it take place? You'll be in good shape after you go through these exercises.
Should I have a nonconforming in here as well?
I am not sure what a 'nonconforming' is to you. Are you talking about 'nonconforming material' or 'nonconformance'? You know the answer to the first one. For the second, the simple fact that you have a problem (opportunity to improve) means that you have a nonconformance (discrepancy between actual and requirement).
 
M

mannym01

#5
I am not sure what a 'nonconforming' is to you. Are you talking about 'nonconforming material' or 'nonconformance'?
I'm talking nonconforming material report, being that this was picked up by the customer would we fill one out for ourselves?
Scott has clearified this for me, what I'm missing is an RMA. Which would result in a Corrective Action Report.

Not to sound too critical
I don't mind the critisism, This is my first step in trying to get some documentation going, I've looked at some sample forms and am trying to see how they would be used together.
 
D

DrM2u

#6
I'm talking nonconforming material report, being that this was picked up by the customer would we fill one out for ourselves?
Most organizations use a formal RMA/RGA system to control product returned from customers and/or to suppliers. This is done for a variety of reasons, one main reason being control of NC product and the other being accounting (invoives, credits, etc).
Scott has clearified this for me, what I'm missing is an RMA. Which would result in a Corrective Action Report.
It depends on your NC Product & CA/PA procedures whether or not the RMA will automatically trigger a CAR. Just because Scott or I would say that an RMA triggers a CAR it does not mean that's how things should be. The procedures have to make sense to your organization and be compliant with the requirements of the applicable standard(s).
I don't mind the critisism, This is my first step in trying to get some documentation going, I've looked at some sample forms and am trying to see how they would be used together.
I am sure you'll find plenty of examples of RGA, CAPA and Change Control procedures in the Cove. Good luck!
 
Thread starter Similar threads Forum Replies Date
B Combining a CAR, an NCR, and an Accident Report ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
P Differences between an NCR and CAR Internal Auditing 9
T Do Customer Returns = NCR and CAR? Nonconformance and Corrective Action 5
Q Why make them different - CAR and PAR and NCR? Nonconformance and Corrective Action 7
Q Complaint, NCR, CAR? Claim or Complaint ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
Q NCR, Containment Action, CAR - Some Basic Questions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
R NCR & CAR - How to use & where to raise Nonconformance and Corrective Action 23
D Controlled Documents and Records - Overdue NCR/CAR Forms QS-9000 - American Automotive Manufacturers Standard 8
C NCR (Nonconformance System) Software Nonconformance and Corrective Action 7
K My question is, what/when is a nonconformity? Therefore what requires an NCR? Nonconformance and Corrective Action 9
L How to write a proper defect description in a NCR Nonconformance and Corrective Action 4
qualprod When to write up a nonconformance and require a NCR - We produce labels ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
B How to reply NCR on ineffectiveness of corrective action during IATF external audit? This is repeated issue whereby some mistake was done. IATF 16949 - Automotive Quality Systems Standard 7
M Issuing NCR for improper method statement submissions Internal Auditing 10
A Scrap is NCR or not - What regulation ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 33
Q Interaction of Processes IOP NCR Process Maps, Process Mapping and Turtle Diagrams 7
W Surveillance report along side an NCR program Nonconformance and Corrective Action 2
A NCR, NCMR, CAPA, Deviations - Medical Device Distributor Nonconformance and Corrective Action 2
D Can an AS9100 auditor issue an NCR a month after the audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
K AS9100 - No NCR's or CA's during Stage 2 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
W IATF 16949 Clause 6.1.1 - My first Major NCR (Management Review) IATF 16949 - Automotive Quality Systems Standard 57
K NCR or CA? We're taking any issue we have and saying its a nonconformance Nonconformance and Corrective Action 11
S Re-validation NCR - In which cases re-validation of processes is required Oil and Gas Industry Standards and Regulations 6
Pancho United Airlines NCR Nonconformance and Corrective Action 43
Q Practical Way to raise NCR's in an Assembly Workshop ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
W NCR Performance KPI Monitoring in an Industry like Construction Nonconformance and Corrective Action 1
A ISO/TS 16949 - Sharing Certification Audit Report (NCR's) with the Customer IATF 16949 - Automotive Quality Systems Standard 8
N Any comment, if a supplier raise an NCR to the Client? Oil and Gas Industry Standards and Regulations 5
W Auditor Remorse for not issuing an NCR AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
Q Criteria for not rising NCR's in 8.3 of ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
I NCR for Customer not updating their drawings AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
R How do you perform verification of a NCR (Nonconformance)? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
N New to ISO 9001 - NCR for every defect? Nonconformance and Corrective Action 5
K Validity of Using NCR's to evaluate Performance Nonconformance and Corrective Action 7
N NCR and CAPA in the FMCG (Fast Moving Consumer Goods) Industry Nonconformance and Corrective Action 1
K Nadcap (AC7107/7 C, paragraph 6.1.b) NCR - Machining Tensile Specimens AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
L How to track the NCR (Quality Notification, Services Notification) Nonconformance and Corrective Action 2
F AS9100 Management Review NCR help - Output of the MR is not Adequate AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Q ECR (Engineering Change Request) or NCR (Nonconformance Report) in Fabrication? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
Q NCR before the Product is delivered to the Customer? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
D Is an NCR required in this Customer Complaint scenario? Nonconformance and Corrective Action 6
W Process Effectiveness NCR's (Nonconformance Reports) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
R Internal Auditing Checklist - Major NCR because the Checklist was not Completed Internal Auditing 17
S Is an 8D Report and a NCR (Nonconformance Report) the same? Nonconformance and Corrective Action 10
N NCR (Nonconformance Report) Combined with Corrective Action Report? Nonconformance and Corrective Action 1
B Format for Discrepant Material Report (DMR) - Nonconformance Report (NCR) Document Control Systems, Procedures, Forms and Templates 1
C AS9100 8.3 Procedure for Non-Conforming Parts - When should an NCR be filled out? Nonconformance and Corrective Action 5
J What is the time limit for an auditor to respond to NCR's and submit audit report? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
K Customer NCR - How to respond to a non-applicable NCR? Nonconformance and Corrective Action 7
C NCR (Nonconformance Report) Root Cause - Cause Code AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2

Similar threads

Top Bottom