How to complete gage R&R when you have only a single sided tolerance

G

gavinqce

#1
Any clues on how to complete gage R&R when you have only a single sided tolerance?

Thanks

Gavin
 
Elsmar Forum Sponsor

Miner

Forum Moderator
Staff member
Admin
#2
The method is the same, but you should use %GRR against Total Variation (TV).

If you must use P/T Ratio, there are a couple options.

If your tolerance is a maximum such as maximum flatness, it is legitimate to use zero as a minimum because flatness cannot be less than zero. However, the farther from zero your maximum gets, the less likely that this is a realistic method.

In this case, or in the case where the spec is a minimum, you may use a calculation similar to the Cpk calculation where you use the difference between the part averages and use 3 sigma instead of 6 sigma.

I will warn you in advance that there will be a lot of disagreement on this issue.
 

Marc

Hunkered Down for the Duration with a Mask on...
Staff member
Admin
#3
gavinqce said:
Any clues on how to complete gage R&R when you have only a single sided tolerance?
If you take a minute an look at the 'Similar Threads' list at the bottom of this thread page you will find several discussion threads about gage R&R when you only have a single sided tolerance. A Search in the forums will also reveal a number of existing discussion threads about single sided tolerance gage R&Rs.
 
L

lee01

#5
Okay, firstly I would highly recommend you get rid of any excel spreadsheets for GRR, I found roughly 6 different GRR’s forms and all gave different results and as the AIAG doesn’t recommend any spreadsheet per say, well you have no correct Spreadsheet or bad Spreadsheet.

Secondly, I have let to see a spreadsheet that will do single sided tolerances. When you enter the product (feature) tolerance you enter the total tolerance (+/-0,010mm would be entered as 0,020mm in the relevant cell) and the calculations are straight forward.

However if the same tolerance is used (+0,020mm) the spreadsheet automatically thinks you mean +/-0,010 and so it will calculate readings accordingly. So lets say on average, readings are mid limit to the 0,020mm single sided tolerance (perhaps how you would like them) the spreadsheet things the results are actually on the top limit, so you end up with really bad GRR results.

In Minitab, you have the option to enter single sided tolerances and the results are massively different as Minitab is calculating the readings based on single sided tolerance.

I had the same problem when choosing a suitable method of hole position measurement, as hole position GD&T callouts are diametric and not the previous standard of +/-. I couldn’t find a measurement device that had a good enough GRR result until I used Minitab. Minitab is my best tool and its soooo cheap to buy!

Regards

Lee01
 
L

llapanowski - 2007

#10
The spreadsheet jrubio posted R&R 1 Sheet.xls is outdated. It is not using the correct Kx factors, at least the ones that are in the MSA 3rd edition. According to the 3rd edition you should use the new kx factors and when solving based on tolerance divide the approriate metric by 6*Tolerance. Of course this is for a bilateral tolerance. I'm still trying to find what to do with unilateral tolerances.
 
Thread starter Similar threads Forum Replies Date
B New to Metrology and told to complete Gage R&R with AIAG compliant software Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 16
A How much does a complete biocompatibility test package cost? Other ISO and International Standards and European Regulations 1
A Is there a better way to do a complete assessment of our QMS? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
A Document Change Notice vs complete System re-write Manufacturing and Related Processes 4
G Best Practices for IT auditing - Is a session-id necessary for a complete audit trail? IEC 27001 - Information Security Management Systems (ISMS) 0
M How to complete structure Analysis and Function analysis sections' columns of AIAG-VDA DFMEA form FMEA and Control Plans 0
S New AIAG FMEA Process - How to complete the new format FMEA and Control Plans 32
D China - Where I can get NMPA complete structure/organogram chart and GB/YY format list China Medical Device Regulations 1
J0anne 90 Day Limit Imposed by NB to complete NCs raised at audit Preventive Action and Continuous Improvement 6
S What is considered the complete software medical device? Medical Information Technology, Medical Software and Health Informatics 6
L A Complete Control Chart Decision Tree Statistical Analysis Tools, Techniques and SPC 5
N Interesting Discussion How to Deal with Suppliers Who Refuse to Complete our ISO Survey? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 51
H FMEA sample for complete CNC machining process FMEA and Control Plans 1
P Searching for a complete audit check list based on ISO14001:2004 ISO 14001:2015 Specific Discussions 1
D What is a reasonable consulting fee for preparation of a complete traditional 510k? Consultants and Consulting 11
E Is Design Transfer to Production be complete prior to Release of first production lot 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
K Partial FAI on Semi-Complete Parts question ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
D When to complete FAA Form 337 (Major Repair and Alteration) Federal Aviation Administration (FAA) Standards and Requirements 4
Q Complete Company Restructuring & Impact on ISO 9001 Certification ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
D Steps to Complete Quality Control Plans and Work Instruction Manufacturing and Related Processes 4
E Auto Populate Date and Time in an adjacent cell to one the user will complete..... Excel .xls Spreadsheet Templates and Tools 7
F Process Maps as a complete QMS Manual ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
S Calibration conducted to 3 steps only of the std instead of complete 5 steps General Measurement Device and Calibration Topics 4
2 Complete Cycle for Complaint Process - Idea Searching Customer Complaints 7
A AS9100 rev C Skill Examiner Audit to complete my RABQSA Auditor certification Career and Occupation Discussions 3
S AS9100C Complete Internal Audit Software Package Recommendations Quality Assurance and Compliance Software Tools and Solutions 13
optomist1 Complete list of all Default Conditions for Y14.5M 1994 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
E List of Complete EMC Test Requirements consisting of IEC, EN, Cispr, etc. General Measurement Device and Calibration Topics 2
L ISO 9001 Clause 7.3.2 Design & Development Input - Adequacy, Complete, Unambiguous ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M Requirement to complete an MSA when doing Comparative Tests Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
N The Gap Analysis is complete - From which clause do I begin? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
V Issue: Suppliers charge for complete Level III PPAP package - Heat Treated Parts APQP and PPAP 16
Hami812 Minitab and Control Charting Time to Complete each Repair Over Time Using Minitab Software 8
L Records Register is not maintained and is far from complete ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
S Required Complete calibration SOP, calibration Plan and master list template! IATF 16949 - Automotive Quality Systems Standard 3
S AS9102 Form 1 Item 19 FAI Complete / Not Complete Box - Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
F Importance of Complete Inspection Records in Aerospace Manufacturing Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
G Help needed to complete a Financial Audit of a Nonprofit Organization Various Other Specifications, Standards, and related Requirements 7
J ISO9001:2008 - What a complete joke! ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 85
L 5S Auditing & Accountibility - Keeping our 5S tool boards complete and accounted for Lean in Manufacturing and Service Industries 13
R Creating Quality System and using it before it is complete ISO 13485:2016 - Medical Device Quality Management Systems 8
P Help Needed to complete audit hours under a Certified Lead Auditor - ISO 9001 General Auditing Discussions 5
N Basic MSA - A simple way to complete an MSA study on Dial Calipers Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
C Complete ISO idiot on a steep learning curve - Quality Manual Review appreciated ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
A Complete change of the ISO 9001 Quality Management System ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
P Earned Value Calculation when you have moved forward but work is not complete Quality Tools, Improvement and Analysis 1
B Is it Compulsory to complete Management Review before Stage 1 Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
R Requirement to Complete Missing Documentation - Changing Registrars Quality Manager and Management Related Issues 6
T 21 CFR Part 11 Compliance - Generation of Complete Copies of Records Qualification and Validation (including 21 CFR Part 11) 3
SteelMaiden Surveillance Audit Complete ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5

Similar threads

Top Bottom