How to describe design processes

O

Ovsianko

#1
Hello all!
I am developing a quality system for a printing company with its own design bureau. Products (orders) they make are most of the times unique. Sometimes they develop layout themselves. Sometimes they only make films for offset printing, sometimes they use the client’s films made by somebody else. What should we call “design” under ISO 9001?
- developing layout;
- preparing postscript file;
- preparing films;
- etc.;
- all the operations performed in the pre-press center (design bureau).
Do they have to have a plan for each of the operation included in the design process as the ISO 9001 suggests?
Maybe somebody already has experience in ISO 9000 preparation in a printing company.
Your thoughts shall be appreciated. Thanks in advance.


------------------
Anton Ovsianko


[This message has been edited by Ovsianko (edited 08 August 2000).]
 
Elsmar Forum Sponsor

barb butrym

Quite Involved in Discussions
#2
In my humble opinion, the best way to approach design in such circumstances is with a project management software (as in Micro soft project type stuff...any one will do) The assigned engineer/project manager works off a template of all possible options, and chooses the ones applicable to the project at hand.....sets out the "plan" as the timeline......protects it, and puts it out on the network if applicable for viewing. He makes the updates to it as the plan evolves...live online. prints out copies for the "project book/file that holds the backup info/data/minutes..... the book is the evidence to back up the plan...clean, easy and practical. Phases are identified, in the template, and chosen when applicable...at the E/PM discretion...thus giving the freedom.....have the engineers determine the phases and supporting steps for complete buy in.

When I use this approach I get support from the engineers, any other approach has always caused me some sort of grief.
 

Kevin Mader

One of THE Original Covers!
Staff member
Admin
#3
Anton,

You posted in part:

"What should we call “design” under ISO 9001?
- developing layout;
- preparing postscript file;
- preparing films;
- etc.;
- all the operations performed in the pre-press center (design bureau)."

I guess the question that comes to mind is, are you Design responsible in all cases?

You may have limited responsibility or you may have it all. You may also live in between worlds. As such, your definition will need to be inclusive of your circumstances.

Your definition may include all of the items you bulleted, more, or some. I agree with Barb's approach to defining a template, or checklist if you will, that will guide your project leaders through the activities required. There are many 'models' to choose from, and you may opt to use a design project model that is normaly used in another industry (perhaps automotive). If you should, be sure to tailor your project model to cover the aspects of your business and don't make it overly complicated (for instance, if you should use the automotive design model, you will have many steps that would not be practical in a print shop).

Regards,

Kevin
 
O

Ovsianko

#4
Thanks Barb, Thanks Kevin,

It is a perfect idea to apply state-of-the-art project management software at large long-lasting design projects. However it is going to be too complicated to introduce such software in the case of the print shop. Each design project lasts here from one to seven days. If it is one day, we are goig to waste more time dealing with software than doing actual work.

We have chosen plainer way with the use of computer limited to mere defining free resources, people and equipment and easy distribution of tasks. Records are going to be marks confirming that an action is to be done or is done and when.

Another thing is when we have to develop and design a new product kind or a new service to be introduced in the company and offered to its clients. Does the process belong to design? How it is related to the above procedures? Do they have to perform “design planning” in a form of writing quality plans?



------------------
Anton Ovsianko
Quality systems consultant
 

Marc

Fully vaccinated are you?
Staff member
Admin
#5
Make a template in Excel. Some years back I used spreadsheets for project planning. Make a template to start with - you rarely have to start from scratch nor does it have to be complex and/or difficult..
 
Thread starter Similar threads Forum Replies Date
T 510k Submission - Where to describe firmware and firmware design documentation? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 6
O Which part of ISO 14644 describe how can I classify cleanrooms between them? Other ISO and International Standards and European Regulations 0
somashekar How to technically describe a Plastic Injection Moulding Tool Manufacturing and Related Processes 3
T Traceability SOP Audit Finding - SOP does not describe the extent of the traceability ISO 13485:2016 - Medical Device Quality Management Systems 15
Jim Wynne Using Famous Quotations to Describe Bad Managers Coffee Break and Water Cooler Discussions 10
A I have two doubts about PFMEA failure modes - How should I describe a "failure mode" FMEA and Control Plans 24
I Post-delivery activities - How do you describe for a 2nd or 3rd tier supplier? Supplier Quality Assurance and other Supplier Issues 2
J What is the right way to describe a failure? Anomaly? Nonconformance and Corrective Action 3
A Process Tool Attached - 'Process title page' to describe all links, COPs, MOPs, SOPs IATF 16949 - Automotive Quality Systems Standard 5
Z Disposition of Records - Describe HOW records are being disposed of? Records and Data - Quality, Legal and Other Evidence 17
B Drawings - Design Rules Inspection, Prints (Drawings), Testing, Sampling and Related Topics 26
R Role of QA during Design and Development of Products and Processes Design and Development of Products and Processes 4
B Design Responsibilities for Mature Acquired Product Lines ISO 13485:2016 - Medical Device Quality Management Systems 3
I RWE Studies and Design Controls US Food and Drug Administration (FDA) 1
G How to record Regulations and Standards as Design Inputs? Design and Development of Products and Processes 15
T Design Traceability - Labelling / Instructions for Use ISO 13485:2016 - Medical Device Quality Management Systems 5
B How to exclude empty rows in full factorial design analysis? Using Minitab Software 0
M Handling design changes with use-as-is inventory disposition Quality Manager and Management Related Issues 6
M Design Control - Management of Electronic CAD files Design and Development of Products and Processes 14
S Examples of FDA acceptable Software Design Specification (SDS) Medical Device and FDA Regulations and Standards News 6
A Design Change/ECO Related Question 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
R Using R package to implement Bayesian phase I/II dose-finding design for three outcomes ISO 13485:2016 - Medical Device Quality Management Systems 6
C ISO 9001:2015 8.3.2. h) Design and Development Planning - What is required? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
Z Software for design control ISO 13485:2016 - Medical Device Quality Management Systems 5
E Design and Development file Procedure ISO 13485:2016 - Medical Device Quality Management Systems 0
DuncanGibbons Section 8.3 relevant for design organisations AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
P DFMEA - Machinery Design Best Practices FMEA and Control Plans 0
R Is a FAIR required on parts that we design? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
U API Spec Q1 - 5.6.1.2 C (3) - Design software Oil and Gas Industry Standards and Regulations 3
N Example for design and development planning,input,output,review,verification,validation and transfer Misc. Quality Assurance and Business Systems Related Topics 4
A 8.6 Release of products and services, 8.3 Design and development - evidence required ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
C Stress / Challenge Conditions for Design Verification Testing to Reduce Sample Size 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 11
J Significant change related to design and intended use EU Medical Device Regulations 3
S Traceability of requirements to design and risk Design and Development of Products and Processes 3
U NOC - What is considered a "design change" EU Medical Device Regulations 5
Q PPT used as Design Review ISO 13485:2016 - Medical Device Quality Management Systems 3
D Design Verification Sample Size vs Repeats Statistical Analysis Tools, Techniques and SPC 9
A Design and development procedure for API Spec Q2 Oil and Gas Industry Standards and Regulations 6
D Design controls - Inputs, outputs, V&V, DHF, DMR ISO 13485:2016 - Medical Device Quality Management Systems 10
LostLouie Manufacturer divorced from Design process, is he justified in design process deficiencies? ISO 13485:2016 - Medical Device Quality Management Systems 9
R DFA & DFM - Examples for Design for assembly and design for manufacturability Lean in Manufacturing and Service Industries 2
D Using Laboratory Notebooks in R&D and Design and Development ISO 13485:2016 - Medical Device Quality Management Systems 3
D ISO 13485 - 7.3.6 Design and development verification - Do most folks create a separate SOP? ISO 13485:2016 - Medical Device Quality Management Systems 6
K Joint approval between OEM and Manufacturer on Design Documents ISO 13485:2016 - Medical Device Quality Management Systems 4
M API 4F/7K/8C Design Package Validation Oil and Gas Industry Standards and Regulations 2
A Design History File - Not ready to share the design drawings or Bill of Material US Food and Drug Administration (FDA) 2
W Need for current design or process control FMEA and Control Plans 2
A What is the difference between Design Process, Process Design and Design Control? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
D Test summary report example for design validation wanted - ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 1
B Why the Greek god Hephaestus should have done a design FMEA (DFMEA) on his giant robot APQP and PPAP 1

Similar threads

Top Bottom