Informational How to develop a Control Plan from a PFMEA (Process FMEA)

Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration
Staff member
Admin
#52
As a general rule all appropriate people must know the SC (special characteristics) and the CC's (critical characteristics). They must know and understand control plans. Inspectors - Definitely.
 
Last edited:

toniriazor

Involved In Discussions
#53
Hello all again,
I have an issue, before coming IATF 16949 audit.
In Ford health chart - Plug availability is High Impact (HI)
In Ford SCCAF - Plug availability is Significant Characteristic (SC)
In PFMEA Ford Handbook it is written that HI characteristic MUST NOT align to characteristic designated in the DFMEA as YC and YS. I understand it that way - characteristic whether is SC or HI. You can't have Plug availability characteristic - both as SC and HI.

What is your opinion about this matter ? Is my logic right or wrong ?

Please share your valuable opinion with me.
 

Attachments

Last edited:

GRP

Involved In Discussions
#54
Hello all again,
I have an issue, before coming IATF 16949 audit.
In Ford health chart - Plug availability is High Impact (HI)
In Ford SCCAF - Plug availability is Significant Characteristic (SC)
In PFMEA Ford Handbook it is written that HI characteristic MUST NOT align to characteristic designated in the DFMEA as YC and YS. I understand it that way - characteristic whether is SC or HI. You can't have Plug availability characteristic - both as SC and HI.

What is your opinion about this matter ? Is my logic right or wrong ?

Please share your valuable opinion with me.
How is "plug availability" in the DFMEA?

It is probably best to clarify with the customer because, without additional information, you are right in that there seems to be a contradiction.
 

toniriazor

Involved In Discussions
#55
How is "plug availability" in the DFMEA?

It is probably best to clarify with the customer because, without additional information, you are right in that there seems to be a contradiction.
Hello, thanks for reply.

In DFMEA Plug Availability is YS and in PFMEA confirmed as SC. There is no valid reason SC characteristic to be and HI, in my opinion. It is a strange casus anyway.
 
#57
You should keep in mind the major additions to the FMEA needed to develop a Control Plan are:
  • Identification of the control factors.
  • The specifications and tolerances.
  • The measurement system.
  • Sample size.
  • The control method.
  • The reaction plan.
 
Thread starter Similar threads Forum Replies Date
J Sampling Strategy for Process Control - How to develop a Sampling Plan Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
P Develop a Document Control System - Six Sigma Project Document Control Systems, Procedures, Forms and Templates 32
L Software control program to handle firmware we develop - Seeking Procedure Software Quality Assurance 1
P How to develop executable quality management system for rookies? IATF 16949 - Automotive Quality Systems Standard 6
M Proper way to develop LCL when only given a lower spec limit Reliability Analysis - Predictions, Testing and Standards 7
O ISO 9001 new certification advice request - Develop a QMS from scratch ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
Sidney Vianna NASA to Develop a Novel Approach for All-Electric Aircraft Using Cryogenic Liquid Hydrogen as Energy Storage World News 2
M IEC 62304 - Develop an Architecture for the Interfaces of Software Items IEC 62304 - Medical Device Software Life Cycle Processes 8
S Help develop sampling plan for prototype samples (medical devices) Statistical Analysis Tools, Techniques and SPC 7
G How to develop a strategy to eliminate an indicator who has been 0 forever? Preventive Action and Continuous Improvement 1
C Who should develop a LSS (Lean Six Sigma) project charter? Six Sigma 2
A How to Develop and Implement 5S +1 Program Lean in Manufacturing and Service Industries 3
J Develop a Customer Survey for Quality - The influence of Quality (ISO) on our Service ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
A What should be strategy plan to develop R&D and what we should do to certified that IATF 16949 - Automotive Quality Systems Standard 5
S How to develop Productivity Metrics Quality Manager and Management Related Issues 3
A We Design and Develop - All of our Manufacturing is Outsourced - ISO 13485 Question ISO 13485:2016 - Medical Device Quality Management Systems 18
G Is it dumb to develop an ISO 17025 web site? ISO 17025 related Discussions 9
R How to Develop a 5S Implementation Plan Quality Tools, Improvement and Analysis 5
tony wardle Change Starts at the Top - Who can Initiate or Develop a Paradigm Change Quality Manager and Management Related Issues 45
S How to develop a Quality Cost Summary Report Quality Manager and Management Related Issues 4
A Guidelines and Advice on how to develop a Company Newsletter ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
N Help a newbie to develop a QMS (Quality Management System) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 50
I How do I develop OC Curves from data collected? Statistical Analysis Tools, Techniques and SPC 14
A SPC Training - I want to develop my knowledge in statistical tools Statistical Analysis Tools, Techniques and SPC 5
M ISO 9001 Requirements for associated service - Design and develop software Design and Development of Products and Processes 7
U ISO to develop Road Safety Standards - ISO/PC 241-"Road Safety Management" Other ISO and International Standards and European Regulations 0
M How to develop the Health and Safety Committee (textile sector)? Occupational Health & Safety Management Standards 4
S Develop and Train Project Management Team in Effective APQP Usage APQP and PPAP 5
R Trying to develop ISO 9001 training for a newly certified company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
E What is the best way to develop a CTQ tree? Six Sigma 3
M How to develop a checklist for internal audit? Internal Auditing 14
D What is the minimum number of values to develop individual chart? Statistical Analysis Tools, Techniques and SPC 14
J Quality Assurance Plan (APQP) - I have to Develop a Quality Assurance Plan APQP and PPAP 5
Y Want to meet someone from big 3 in the supplier develop field to learn from Supplier Quality Assurance and other Supplier Issues 6
S Product Development Program - Design, develop, approve and manufacture new products Design and Development of Products and Processes 6
C Calibration Engineer - Looking for information to develop a job description General Measurement Device and Calibration Topics 2
S 5S blitz workshop - One of my first missions is to develop a 5S training course Quality Tools, Improvement and Analysis 9
Sidney Vianna Interesting Discussion ISO to develop a Guidance Document (ISO 26000) on Social Responsibility - some object Other ISO and International Standards and European Regulations 177
Tom W PFMEA for Heat Treat Service Provider - Trying To Develop RPNs FMEA and Control Plans 11
D Trying to develop a written procedure for Gage R&R Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
Marc Ford Reaches Agreement With Covisint To Develop Supplier Portal Supplier Quality Assurance and other Supplier Issues 0
C How to develop an Equipment / Machinery FMEA - Remember the key word: Predictive FMEA and Control Plans 7
J FMEA Software to develop P&D Failure Modes Effects Analysis Quality Assurance and Compliance Software Tools and Solutions 12
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
D All Dimensions listed on control plan FMEA and Control Plans 10
W Need for current design or process control FMEA and Control Plans 2
Q ISO 9001 8.5.1 - Control of production and service performance ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
A What is the difference between Design Process, Process Design and Design Control? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
A Beginners help with ISO3951-2 Combined control s-method n>5 what is Phi ?? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
C Corrective action for failure in documents control ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
Similar threads


















































Top Bottom