How to kick off the office Quality Improvement Program (QIP)?

lynfern

Starting to get Involved
#1
We are the subsea production provider and the organization has initiate the services in China. As the QA Engineer, how can I select a quality topic/activity to raise the staff quality awareness as the office Quality Improvement Program?
 
Elsmar Forum Sponsor
A

Andy Jones

#3
As mentioned KPIs will be the main source of data. All projects really need to based around sound, factual data.
If you are starting in an office environment, you may want to start your QI programme with a 5s excercise.
 

Geoff Cotton

Quite Involved in Discussions
#4
It would also be useful to determine the current state (before the 5S programme) and to define the future state (what's your goal).
 
Thread starter Similar threads Forum Replies Date
M Presentation Material for New Project Kick Off Meeting Manufacturing and Related Processes 2
S Project Kick-Off - First visit agenda to kick off a ISO/IEC 17025:2005 ISO 17025 related Discussions 1
M Lean training for new team - Thoughts on topics for a kick-off meeting? Lean in Manufacturing and Service Industries 6
S TS 16949 Implementation Kick Off Promotional Techniques?? IATF 16949 - Automotive Quality Systems Standard 5
G ISO 14001 Slogans and Kick Off Ideas Miscellaneous Environmental Standards and EMS Related Discussions 14
K Play this game. Try to kick the ball & beat me !! Coffee Break and Water Cooler Discussions 20
A Can a power Supply be an accessory to a medical device, if it is an 'off-the-shelf' product. IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
I Do I need to sign off my annual audit calendar? Internal Auditing 2
Q ISO 13485 7.5.6 Validation - Off the shelf Software ISO 13485:2016 - Medical Device Quality Management Systems 3
A IEC 62304 safety classification, External Controls and off-label use related risks IEC 62304 - Medical Device Software Life Cycle Processes 5
R Qualification list of businesses approved to Off-Shore Aerospace work. AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
S Study sign off question / responsibilities ISO 13485:2016 - Medical Device Quality Management Systems 3
M Question for Auditors - "Off the Record" Conversation? General Auditing Discussions 14
P Equipment 21 CFR 820.70(g) - User Requirements Document for Off the shelf equipment 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 7
S PSW - Requirements for "off-the shelf" component that has multiply manufacturing locations Off the Shelf Item Manufacturing and Related Processes 1
Ed Panek CE Mark Requirements on Kits (off the shelf product requirements met) CE Marking (Conformité Européene) / CB Scheme 2
M Off-Label Use - Clarification of FDA Policy US Food and Drug Administration (FDA) 1
Watchcat Best Regulatory Oversight for Off-Shore Device Manufacturing? Other Medical Device Regulations World-Wide 1
M Seeking advice regarding use of off-the-shelf (OTS) batteries Other Medical Device and Orthopedic Related Topics 4
E Stand-by vs. ON/OFF symbol IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
R NRTL - Scope Question - Off-the-Shelf Plug In IEC 60601 - Medical Electrical Equipment Safety Standards Series 0
P Qualifying commercial off the shelf (COTS) external suppliers ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
SKM.Sunil Detachable parts vs Off the Shelf parts EU Medical Device Regulations 8
M OTS (Off-the-shelf) Medical Device Accessories - Camera EU Medical Device Regulations 1
M Labeling for off-label use - Prevention of off-label use of a medical device 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
C Software validation - Off The Shelf Software - Web hosted ISO 13485:2016 - Medical Device Quality Management Systems 6
T Potential Off-Label Use question 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
Q Handling Off-the-Shelf Components 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
Marc Goldsmiths University will take beef products off the menu starting in September 2019 Sustainability, Green Initiatives and Ecology 19
A A purpose of a Stage 1 audit - Off site document review Registrars and Notified Bodies 3
Miner Getting logged off repeatedly Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 13
C Supplier blowing off CAR request Registrars and Notified Bodies 14
W Job Card/Router sign off - Want to go paperless AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
L Off the Shelf Software VISUAL ERP system ISO 13485:2016 - Medical Device Quality Management Systems 1
J Supplier controls for consumer-grade off-the-shelf products 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
R Software validation - off the shelf X-Ray Software Quality Assurance 3
R Control of COTS (Commercial Off The Shelf) Specifications ISO 13485:2016 - Medical Device Quality Management Systems 2
T Stamps vs Signatures - Stamps as inspection/approval sign-off vs. Initials Records and Data - Quality, Legal and Other Evidence 18
shimonv Off-Label Use of a Medical Device in Japan Other Medical Device Regulations World-Wide 2
A Cpk Formula seems off, need help!? Capability, Accuracy and Stability - Processes, Machines, etc. 11
C Do we need to Validate Off the Shelf Software? Manufacturing and Related Processes 5
T Parts Lists - Use of the word "off" against Quantity Coffee Break and Water Cooler Discussions 2
E Information required about changing an off shelf part 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
N Control of stock (Off the Shelf) Non-Conforming Material & Product Tags ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
K UL 6601 - Would an off-the-shelf Android tablet, powered by USB, pass UL 6601? Other Medical Device Related Standards 3
S COTS (commercial off-the-shelf) Validation FDA Requirements Software Quality Assurance 4
D Off-Label Self Promotion - What to do EU Medical Device Regulations 3
T Document Review And Sign Off Second Person Review - FDA Requirements ISO 13485:2016 - Medical Device Quality Management Systems 5
M Opportunity For Improvement - Customer to sign off or approve a new design ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
C Medical Device on/off switch symbolization IEC 60601 - Medical Electrical Equipment Safety Standards Series 5

Similar threads

Top Bottom