W
Hi All,
Need some advice on how to perform validation for an epoxy curing station. Basically what we do is to pour epoxy into one of our sub assembly and bake it in the oven for 10-12hours at 70 degree celcius. According to the engineer, the temperature is not critical because the epoxy can also cure at room temperature but it may take longer time. The problem is we have no way of testing whether the epoxy has cured thus we have to validate this process.
Thank you in advance for your help
Need some advice on how to perform validation for an epoxy curing station. Basically what we do is to pour epoxy into one of our sub assembly and bake it in the oven for 10-12hours at 70 degree celcius. According to the engineer, the temperature is not critical because the epoxy can also cure at room temperature but it may take longer time. The problem is we have no way of testing whether the epoxy has cured thus we have to validate this process.
Thank you in advance for your help