IATF 16949 6.1.2.3(e) Contingency Plan Testing

jfries2

Involved In Discussions
#1
Any thoughts on the expectations for periodic "tests" of your contingency plans? Tests such as evacuation drills for fire, tornado, etc. are easy enough. How does one test or simulate major disruptions such as equipment failures, plant shutdown (fire, etc.), supplier shutdown? The requirement for testing is a separate requirement from annual contingency plan reviews, so I'm guessing the reviews won't constitute a test.
 
Elsmar Forum Sponsor

WCHorn

Rubber, Too Glamorous?
Trusted Information Resource
#2
This is a good question; I am interested in the group's thoughts on this, too. For a supplier shutdown, you could certainly query your alternate suppliers to find if they can handle the workload in a timely manner. The simulation of major equipment failure could be a giant task, especially if production is at near-capacity. You could simulate a natural disaster, but the cost would be significant. If you can't compromise delivery schedules, you would have to schedule the simulation on off days at overtime wages. It will be interesting to hear feedback from ITAF 16949 auditors about expectations for this requirement.
 

jfries2

Involved In Discussions
#4
Good thought about testing backup generators. Like WCHorn, I'd be interested to hear more about expectations from the IATF auditors.
 

Golfman25

Trusted Information Resource
#5
Good thought about testing backup generators. Like WCHorn, I'd be interested to hear more about expectations from the IATF auditors.
So would they. :) My understanding is the training has yet to be rolled out. This thing is going to be a real cluster for a while. Good luck.
 

QualitySpirit

Involved In Discussions
#6
IATF has released ADP training & quiz on IATF16949 and rules 5th today. I hope I could understand their intention clearly after I complete all modules.:(
 

Englishman Abroad

Involved In Discussions
#7
All,

Yes it would be nice to have some guidance on what is needed here.

I do not want to have a conversation with my customers like;

"Sorry, we stopped the assembly plant because we were testing our contingency plan"
 

joekirk

Involved In Discussions
#8
Some are easy to do and probably is already done by your company such as fire drill, earthquake drill, violent person in the workplace, first aid drill, chem spill drill and others can be addressed through table talks on things you cannot simulate.
 

qusys

Trusted Information Resource
#9
Requirement 6.1.2.3 at point e) states "where appropriate". The example is "simulation" but where it is not "appropriate" , I think it is not pursuable.
Other example , in case you have group of continuity, you shall test during maintenance activity using simulation.
Having a cogeneration plant aimed at supplying energy in case of energy breakage from public line, could be a good method to minimize risks in this sense.
However there are other risks to be managed( natural events, manpower lost, infrastructure etc...)
 

jfries2

Involved In Discussions
#10
My view is that the "as appropriate" applies only to the example of simulations, because it is included inside the parentheses about simulations. If it were outside the parentheses, I would agree with you. On the other hand, I hope you are right and I am wrong! It will be interesting to see how this gets audited as has been previously mentioned here.
 
Thread starter Similar threads Forum Replies Date
CbusQAguy IATF 16949 6.1.2.3 - Contingency Plans Testing Checklist IATF 16949 - Automotive Quality Systems Standard 3
L IATF 16949 Contingency plan requirements / Sanctioned Interpretations? IATF 16949 - Automotive Quality Systems Standard 33
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 6
L IATF 16949 certification costs IATF 16949 - Automotive Quality Systems Standard 3
B FCA US Customer Specific IATF 16949- Critical Characteristics 8.6.2 Customer and Company Specific Requirements 0
B IATF 16949 News Six month extension on all valid IATF 16949 certs IATF 16949 - Automotive Quality Systems Standard 10
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
B FCA US IATF 16949 Customer Requirements updates Customer and Company Specific Requirements 3
S Can assembly manufacturing sub-supplier be certified IATF 16949? IATF 16949 - Automotive Quality Systems Standard 6
D IATF 16949 Requirement for CMMI in a Global Company Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 0
M Tips on preparing for IATF 16949 Internal Lead Auditor exam Manufacturing and Related Processes 1
A IATF 16949 4.3.1 - Determining the scope of the quality management system - supplemental IATF 16949 - Automotive Quality Systems Standard 9
S Definition of "worldwide" in view of IATF 16949 and Product conformity IATF 16949 - Automotive Quality Systems Standard 3
R Where does IATF 16949 address Process mapping? IATF 16949 - Automotive Quality Systems Standard 3
A Document "Correspondence IATF 16949 vs ISO13485" available? IATF 16949 - Automotive Quality Systems Standard 0
H Remote product audits in Coivd-19 - IATF 16949 9.2.2.4 IATF 16949 - Automotive Quality Systems Standard 3
S IATF 16949 - Partial traceability of Aftermarket products IATF 16949 - Automotive Quality Systems Standard 5
M IATF 16949 8.5.1.3 Verification of job set-ups - Do we need secondary check? IATF 16949 - Automotive Quality Systems Standard 7
C Industrial scales and MSA (IATF 16949 requirement 7.1.5.1.1) IATF 16949 - Automotive Quality Systems Standard 30
V Generic IATF 16949 Audit Checklist wanted IATF 16949 - Automotive Quality Systems Standard 3
M Scope of Combined ISO 9001 and IATF 16949 QMS - Non-automotive customers ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
D Postpone IATF 16949 audit due to COVID-19 IATF 16949 - Automotive Quality Systems Standard 41
J Does anyone have an excel IATF 16949 Internal Audit checklist I could use? IATF 16949 - Automotive Quality Systems Standard 7
T Reaction Plan To Drive suppliers to IATF 16949 registration IATF 16949 - Automotive Quality Systems Standard 4
B IATF 16949 - Is a Deviation required for sample components in a prototype build? IATF 16949 - Automotive Quality Systems Standard 13
C IATF 16949 - Scope or not? IATF 16949 - Automotive Quality Systems Standard 2
L "IATF-Compliant" IATF 16949:2016 certification? What does this mean? IATF 16949 - Automotive Quality Systems Standard 13
B Go Beyond ISO 9001 WITH IATF 16949 (January 28) [Paid] Training - Internal, External, Online and Distance Learning 1
V IATF 16949 8.4.1 Control of externally provided processes, products and services - Should the CB be on our Approved Supplier List? IATF 16949 - Automotive Quality Systems Standard 10
S Can we provide training plan as corrective action for IATF 16949 Non conformity? IATF 16949 - Automotive Quality Systems Standard 9
C Design and implementation of process audits as defined within IATF 16949 IATF 16949 - Automotive Quality Systems Standard 2
Q VDA 6.3 questions vs IATF 16949 clauses VDA Standards - Germany's Automotive Standards 0
N IATF 16949:2016 7.1.5.3.2 External Laboratory - How to approve the Testing Laboratory without accreditation scope IATF 16949 - Automotive Quality Systems Standard 2
M IATF 16949 (6.1.1 - Planning and Risk Analysis for a remote site) Process Maps, Process Mapping and Turtle Diagrams 5
D IATF 16949 FAQ 24 (8.4.2.2 Countries of Destination) - How is this actually being interpreted? IATF 16949 - Automotive Quality Systems Standard 3
Jimmy123 What is the difference between Error Proofing and Controls? ISO/IATF 16949 - Control Plans FMEA and Control Plans 16
P IATF 16949 8.4.2.4 Supplier Monitoring IATF 16949 - Automotive Quality Systems Standard 2
V IATF 16949 9.2.2.1 Internal Audit Program - "Process Changes" IATF 16949 - Automotive Quality Systems Standard 11
Sidney Vianna IATF 16949 News Presentations from the latest IATF Stakeholder Event - Expectation that IATF 16949 certification should equate with product quality. Misguided? IATF 16949 - Automotive Quality Systems Standard 7
C IATF 16949 8.3 Exclusion - Manufacturing process design and development IATF 16949 - Automotive Quality Systems Standard 5
J IATF 16949 8.4.1.2 Supplier selection process IATF 16949 - Automotive Quality Systems Standard 4
M IATF 16949 CAPITULO 7.3.2 IATF 16949 - Automotive Quality Systems Standard 3
Casana IATF 16949 7.1.5.3.2 External Laboratory - On Site Calibration IATF 16949 - Automotive Quality Systems Standard 8
M IATF 16949 7.2.3 Internal Auditor Competency - Trainer's competency Internal Auditing 7
P IATF 16949 Clause 8.4.2.3 - Justification for non-certified suppliers IATF 16949 - Automotive Quality Systems Standard 14
M IATF 16949:2016 clause 8.4.2.3 - We don't have ISO 9001:2015 certificate IATF 16949 - Automotive Quality Systems Standard 26
T New role Quality Manager IATF 16949, new company, advise how to get started IATF 16949 - Automotive Quality Systems Standard 2
R Material safety data sheet (MSDS) related clause in IATF 16949 manual IATF 16949 - Automotive Quality Systems Standard 17
R IATF 16949 Clause 8.5.1.6 a) maintenance and repair facilities - Production tooling management and personnel IATF 16949 - Automotive Quality Systems Standard 4
C IATF 16949:2016 Section 8.5.1.2 item d) accessible for use at the designated work area(s) IATF 16949 - Automotive Quality Systems Standard 5

Similar threads

Top Bottom