C
Christophe81
Hi
I would like to ask about the clause 8.5.1.3 of standard, "verification of job setups", in which there is a subsection:
"perform first off/last off part validation, as applicable; where appropriate first off parts should be retained for comparison with the last off parts...".
Does the above point mean that the first-off (master part) should be kept in the visible place available for operator until the end of production order so that it can be compared with the last part? Is it enough if the operator compares the records from the first-piece inspection with the records of the last part inspection, and the first piece can be packed in the carton with the rest of the production after the inspection? - I am talking about a situation when products are traced with level 1, and I am able to find the first piece at every moment of production.
What exactly does the word "retained" mean in this case?
I would be grateful for help.
I would like to ask about the clause 8.5.1.3 of standard, "verification of job setups", in which there is a subsection:
"perform first off/last off part validation, as applicable; where appropriate first off parts should be retained for comparison with the last off parts...".
Does the above point mean that the first-off (master part) should be kept in the visible place available for operator until the end of production order so that it can be compared with the last part? Is it enough if the operator compares the records from the first-piece inspection with the records of the last part inspection, and the first piece can be packed in the carton with the rest of the production after the inspection? - I am talking about a situation when products are traced with level 1, and I am able to find the first piece at every moment of production.
What exactly does the word "retained" mean in this case?
I would be grateful for help.