The set-up verification for unplanned shutdown is different from the one for planned shutdown.
The former should include more check items, because some thing may not to be checked for planned shutdown. For example, the mould of injection molding worn and repaired, some dimesions, which are effected by the repairing, need to be inspected, while the normal setup verification may not check these.