IATF 16949 Clause 8.5.6.1.1 (Temporary Process Control Change)

T

tongxiaozhi

#11
For the " Temporary change of process controls“, is it just related to the control method, I mean monitoring and measuring of process.

For example, If the automatic CMM machine doesn't work, we use the manual CMM machine, my understanding this is a kind of temporary change of proces controls.

But , for the injection moulding, if we block 1 cavity out 4 to produce, does it also fits into the definition of temporary change of process control?

I still don't really understand this chapter. thanks very much for your clarification.

thanks.
 
Elsmar Forum Sponsor

Sebastian

Trusted Information Resource
#12
In control plan there are product and process characteristics, which have to be controlled during manufacturing, storage and shipment of product. There are defined evaluation/measurement techniques used for their control. This requirement is related to risk of unavailability of equipment listed in evaluation/measurement techniques column.

There are two options:
1. Determine during APQP back-up equipment or determine back-up process and product characteristics and related back-up equipment.
2. Implement kobesteelism.
 
A

Azaarus

#13
In control plan there are product and process characteristics, which have to be controlled during manufacturing, storage and shipment of product. There are defined evaluation/measurement techniques used for their control. This requirement is related to risk of unavailability of equipment listed in evaluation/measurement techniques column.

There are two options:
1. Determine during APQP back-up equipment or determine back-up process and product characteristics and related back-up equipment.
2. Implement kobesteelism.
But, no one can anticipate having to block off 2 of 4 cavities on a tool to incorporate an approval from the customer for APQP. How would one establish back-up equipment for blocking off cavities?

Sorry, just curious.
 

Sebastian

Trusted Information Resource
#14
Quantity of cavities is one of controlled process parameters? Poor me, I was thinking that it is a material volume.
SPC on quantity of cavities is definitely worth of trying. It is joke, before you start to consider it.
 
Last edited:

Mikey324

Quite Involved in Discussions
#15
We use a spreadsheet we can Management of Change. I cant share the form, but can explain the format.
We note any proposed changes, what internal process it impacts, whether its permanent or temporary, etc. If its temporary change we list the alternate method. This just shows what we are doing in the meantime. For example, if a piece of equipment goes down, we use a modified process to complete the job. This would require us to do some additional checks to make sure the alternate process is producing an acceptable part.
 

Sebastian

Trusted Information Resource
#16
This is standard process change management and it has separate section in IATF 16949. This is not evidence of addressing requirement we talk about.
 

Golfman25

Trusted Information Resource
#17
It seems to me this is one where you can go completely nuts. Obviously if you have some type of specialized control system you may need a backup system if the specialized system goes down. But for those of us who use standard store bought measuring tools (calipers, mics, etc.) it seems overkill.

If you have an in line inspection system, and that goes down -- sure you probably need a backup procedure. I know from my experience, companies who guarantee defect free products use automated inspection systems built into their process. Logic tells me that is what the focus on alternates really is about.

If you have a single cmm that's on the fritz, your backup might be hand gages?

If you have hand gages, is there really a backup? Other hand gages?
 
G

GRCracker

#18
That's my question. We had a consultant come in and stated that we needed to add "alternative method and error-proofing" to the internal laboratory scope. Question is why can't I just say alternate control method is replacement of same device. Caliper for caliper and mic for mic.
 

Sebastian

Trusted Information Resource
#19
Your consultant is partially right. Laboratory can perform measurement, testing activities mentioned in product control plan. You have to have back-ups or determine alternate control method. When alternate method is not one of already used and included in laboratory scope, you have to revise it.
Caliper for caliper is a back-up, but one testing machine for another testing machine when both require pressured air and your pressured air supply system might go down, it is not a back-up. For this case you have to determine alternate control method.
 

malasuerte

Involved In Discussions
#20
Your consultant is partially right. Laboratory can perform measurement, testing activities mentioned in product control plan. You have to have back-ups or determine alternate control method. When alternate method is not one of already used and included in laboratory scope, you have to revise it.
Caliper for caliper is a back-up, but one testing machine for another testing machine when both require pressured air and your pressured air supply system might go down, it is not a back-up. For this case you have to determine alternate control method.
Great inputs Sebastian.

Just wanted to chime in and say this is not as difficult as it sounds. Make yourself a quick table of you Control Methods today. Then simply determine what the "alternate" method would be if you were w/o that primary method.

i.e. - Note, there are only random examples off the top of my head to illustrate a point.
Primary method for 'inspection of defects': MIK - microscope
Alternate method: Manual visual inspection


Primary method of control of product dimensions: Caliper
Alternate method: Ruler

Primary method of controlling product output: SPC - statistical process control
Alternate method: FDC - fault detection classification
 
Thread starter Similar threads Forum Replies Date
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
P IATF 16949 Clause 8.4.2.3 - Justification for non-certified suppliers IATF 16949 - Automotive Quality Systems Standard 14
M IATF 16949:2016 clause 8.4.2.3 - We don't have ISO 9001:2015 certificate IATF 16949 - Automotive Quality Systems Standard 26
R Material safety data sheet (MSDS) related clause in IATF 16949 manual IATF 16949 - Automotive Quality Systems Standard 17
R IATF 16949 Clause 8.5.1.6 a) maintenance and repair facilities - Production tooling management and personnel IATF 16949 - Automotive Quality Systems Standard 4
QChas IATF 16949 Clause 8.5.1.2 - C -Standardized Work IATF 16949 - Automotive Quality Systems Standard 1
N Looking for input on the attached Process / IATF 16949 Clause Matrix IATF 16949 - Automotive Quality Systems Standard 4
R IATF 16949 Clause 6.1.2.1 - Lessons Learned and Risk Analysis IATF 16949 - Automotive Quality Systems Standard 6
L IATF 16949 Clause 9.2.2.2 Quality Management System Audit IATF 16949 - Automotive Quality Systems Standard 9
H IATF 16949 Clause 9.2.2.2 Audit System / CSR IATF 16949 - Automotive Quality Systems Standard 1
B IATF 16949 clause 7.1.5.1.1 - Statistical studies shall be conducted IATF 16949 - Automotive Quality Systems Standard 3
P Interesting Discussion IATF 16949:2016 Clause 9.2.2.3 and Layered Process Audits IATF 16949 - Automotive Quality Systems Standard 18
M Reference to IATF 16949 clause 8.4.3 in clause 8.3.4.4, Is it right? IATF 16949 - Automotive Quality Systems Standard 1
M IATF 16949 Clause 8.3.5.2 sub-clause (l) - Process maintainability requirements IATF 16949 - Automotive Quality Systems Standard 15
J IATF 16949 Clause 9.3.2.1 - How to understand "measures" IATF 16949 - Automotive Quality Systems Standard 4
J How to address IATF 16949 clause 5.1.1.1 in my Quality Manual IATF 16949 - Automotive Quality Systems Standard 6
B IATF 16949 clause 8.3.4.3 Prototype programme IATF 16949 - Automotive Quality Systems Standard 0
DeeDeeM IATF 16949 - Clause 8.5.2 Identification and Traceability IATF 16949 - Automotive Quality Systems Standard 7
W IATF 16949 Clause 6.1.1 - My first Major NCR (Management Review) IATF 16949 - Automotive Quality Systems Standard 57
A Escalation Process - IATF 16949 Clause 4.4.1.2 IATF 16949 - Automotive Quality Systems Standard 11
E IATF 16949 Clause of 8.4.3 - Approvals - Can you explain to me IATF 16949 - Automotive Quality Systems Standard 1
B IATF 16949 Clause 9.2.2.2 - Which QMS Processes are Included IATF 16949 - Automotive Quality Systems Standard 1
J What are sample documents of IATF 16949 Clause 8.6.4 a? IATF 16949 - Automotive Quality Systems Standard 2
S IATF 16949 Clause 8.3.3.3 - Documentation of all Special Characteristics in Drawings IATF 16949 - Automotive Quality Systems Standard 2
B IATF 16949 Section Clause 8.3.4.1 - Monitoring - Design and Development Input(s) IATF 16949 - Automotive Quality Systems Standard 3
B IATF 16949 Clause 8.6.2 - Layout Inspection and Functional Testing IATF 16949 - Automotive Quality Systems Standard 13
B IATF 16949 Clause 9.3.2.1 - Management Review Inputs IATF 16949 - Automotive Quality Systems Standard 1
T Customer Authorization for Concession - IATF 16949 Clause 8.5.1.1 IATF 16949 - Automotive Quality Systems Standard 3
W IATF 16949 Clause 8.4.2.4.1 Second Party Audits (Supplier Management) IATF 16949 - Automotive Quality Systems Standard 45
T Record Retention Requirements - IATF 16949 Clause 7.5.3.2.1 Records and Data - Quality, Legal and Other Evidence 15
T Temporary Change of Process Controls - IATF 16949 Clause 8.5.5.1.1 IATF 16949 - Automotive Quality Systems Standard 16
B IATF 16949 Clause 8.4.1.2 - Supplier Selection Process - Service Providers IATF 16949 - Automotive Quality Systems Standard 13
J IATF 16949 Clause 8.7.1.7 Nonconforming Product Disposition - Scrap Rendered Unusable IATF 16949 - Automotive Quality Systems Standard 64
M IATF 16949 Clause 4.4.1.2 - Product Safety - Concept of the Title IATF 16949 - Automotive Quality Systems Standard 4
M IATF 16949 Clause 7.1.5.1.1 - What are "inspection equipment systems"? IATF 16949 - Automotive Quality Systems Standard 4
P Setup Verification in IATF 16949 Clause 8.5.1.3 IATF 16949 - Automotive Quality Systems Standard 6
D Does IATF 16949:2016 Clause 7.3 (now 8.3) Apply to "Grandfathered" Products IATF 16949 - Automotive Quality Systems Standard 4
J IATF 16949 Clause 8.7.1.7 Nonconforming Product Disposition Compliance IATF 16949 - Automotive Quality Systems Standard 38
M Exclusion of IATF 16949 Clause 4.4.1.2 - Product Safety IATF 16949 - Automotive Quality Systems Standard 2
P Problem with IATF 16949 Clause 7.2.3 Requirements (Internal Auditor Competency) IATF 16949 - Automotive Quality Systems Standard 3
M IATF 16949 Clause 4.4.1.2 - Product Safety IATF 16949 - Automotive Quality Systems Standard 13
M Compliance with IATF 16949 Clause 8.3.4.4 Product Approval Process IATF 16949 - Automotive Quality Systems Standard 2
dubrizo IATF 16949 Clause 8.7.1.6 - Customer Notification - Your Inputs Requested IATF 16949 - Automotive Quality Systems Standard 4
P IATF 16949 Clause 8.5.6.1.1 - Temporary Change of Process Controls IATF 16949 - Automotive Quality Systems Standard 21
M IATF 16949 Clause 8.3 - Rework Records Requirements IATF 16949 - Automotive Quality Systems Standard 1
J What results need to be defined in IATF 16949 Clause 8.3.4 IATF 16949 - Automotive Quality Systems Standard 3
P IATF 16949 Clause 10.2.4 - Error Proofing IATF 16949 - Automotive Quality Systems Standard 25
P IATF 16949 Clause 8.5.1.4 - Verification after Shutdown IATF 16949 - Automotive Quality Systems Standard 27
J How to understand IATF 16949 Clause 8.5.6.1.1 - Process Controls IATF 16949 - Automotive Quality Systems Standard 2
J How to understand IATF 16949 Clause 8.5.2.1 - Traceability IATF 16949 - Automotive Quality Systems Standard 5

Similar threads

Top Bottom