IATF 16949 Section Clause 8.3.4.1 - Monitoring - Design and Development Input(s)

bkirch

Involved In Discussions
#1
In the IATF 16949 standard, section 8.3.4.1 states that "Measurements at specified stages during the design and development of products and proceses shall be defined, analysed, and reported with summary results as an input to management review (see section 9.3.2.1)."

My issue is that when I look at section 9.3.2.1, I am having trouble finding which one of the inputs that the requirements of section 8.3.4.1 would align with? Any thoughts on this would be appreciated.
 
Elsmar Forum Sponsor

jfries2

Involved In Discussions
#2
ISO/TS 16949 contains nearly the same requirement in paragraph 7.3.4.1. It's an "extra" required input for management review. If they put it all in the same paragraph it would be too easy! But the note in 8.3.4.1 gives you some hints as to where you could include it (quality costs, product conformance, etc.). Or, I think it's easier just to have a section of management review for "APQP status" and use that to meet this clause.
 

AMIT BALLAL

Super Moderator
#3
In the IATF 16949 standard, section 8.3.4.1 states that "Measurements at specified stages during the design and development of products and proceses shall be defined, analysed, and reported with summary results as an input to management review (see section 9.3.2.1)."

My issue is that when I look at section 9.3.2.1, I am having trouble finding which one of the inputs that the requirements of section 8.3.4.1 would align with? Any thoughts on this would be appreciated.

This is an additional input to Management review. Its up-to you how you show it as an input. You can simply call it as "design and development review".


Thanks,
Amit
 

Sebastian

Trusted Information Resource
#4
My issue is that when I look at section 9.3.2.1, I am having trouble finding which one of the inputs that the requirements of section 8.3.4.1 would align with? Any thoughts on this would be appreciated.
Yes, it is one of few mistakes IATF has to correct in future revision.
 
Thread starter Similar threads Forum Replies Date
C IATF 16949:2016 Section 8.5.1.2 item d) accessible for use at the designated work area(s) IATF 16949 - Automotive Quality Systems Standard 5
C AIAG's IATF 16949 section 7.1.5.1.1 - Torque MSA Requirement Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 10
H Documented processes required by IATF 16949 section 4.4.1 IATF 16949 - Automotive Quality Systems Standard 1
B IATF 16949 Section 8.5.1.5 (Total Productive Maintenance) IATF 16949 - Automotive Quality Systems Standard 42
B Calibration/Verification Records - IATF 16949 section 7.1.5.2.1 f) IATF 16949 - Automotive Quality Systems Standard 6
D IATF 16949 Process Map IATF 16949 - Automotive Quality Systems Standard 3
Vader22 IATF 16949 extended manufacturing site help IATF 16949 - Automotive Quality Systems Standard 2
D IATF 16949 Certification and Letter of Conformance expiry (Help!!!) IATF 16949 - Automotive Quality Systems Standard 8
D AS9100 VS IATF 16949 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
Ashland78 Need IATF 16949 ISO Gap Analysis Excel File Internal Auditing 3
T Justification of "Design Excluded" in IATF 16949 Design and Development of Products and Processes 5
Sidney Vianna Job Opening in the USA - IATF 16949 Lead Auditor Position Job Openings, Consulting and Employment Opportunities 0
Ron Rompen IATF 16949 8.5.1.4 IATF 16949 - Automotive Quality Systems Standard 7
P IATF 16949:2016 Letter of conformity IATF 16949 - Automotive Quality Systems Standard 5
D IATF 16949 SI 10, External non-accredited lab IATF 16949 - Automotive Quality Systems Standard 4
S IATF 16949 - Summary at a glance Clause wise - changes from ISO TS IATF 16949 - Automotive Quality Systems Standard 4
T IATF 16949 Recording inspection results IATF 16949 - Automotive Quality Systems Standard 2
S IATF 16949 Supplier selection criteria 8.4.1.2 IATF 16949 - Automotive Quality Systems Standard 4
D IATF 16949 M&TE Laboratory scope IATF 16949 - Automotive Quality Systems Standard 7
M IATF 16949 SI # 10: Integrated self-calibration of measurement equipment- Needs for explanation IATF 16949 - Automotive Quality Systems Standard 2
Q ISO 9001/IATF 16949 Audit Finding Question - Document Retention IATF 16949 - Automotive Quality Systems Standard 11
J IATF 16949 Calibration/Verification records question ISO 26262 - Road vehicles – Functional safety 6
D Bulk Materials (Greases) and IATF 16949 IATF 16949 - Automotive Quality Systems Standard 11
J IATF 16949 Internal Audit question - Auditor's responsibility Internal Auditing 6
S IATF 16949 Internal Audit Example IATF 16949 - Automotive Quality Systems Standard 18
B Remote IATF 16949 audit preparation General Auditing Discussions 10
R IATF 16949 Certification for new site with transferred product--what is the impact with CSR and scorecards? IATF 16949 - Automotive Quality Systems Standard 4
B IATF 16949 Cert Expire- New certification body IATF 16949 - Automotive Quality Systems Standard 5
M IATF 16949 - Audit of Remote Location/Support Site and IT IATF 16949 - Automotive Quality Systems Standard 4
O Informational Ford Motor Company Customer Specific Requirements for IATF 16949:2016 - 08 Jan 2021 Customer and Company Specific Requirements 0
B Updated IATF 16949 - Will IATF 16949 get revised when ISO 9001:202X is released? IATF 16949 - Automotive Quality Systems Standard 4
O Release of Sanctioned Interpretations (SIs) related to Rules 5th Edition and Sanctioned Interpretations related to IATF 16949:2016 IATF 16949 - Automotive Quality Systems Standard 0
S Thoughts on managing ISO 9001, 13485, IATF 16949 and 17025 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 33
P IATF 16949 requirement - error-proofing in control plan IATF 16949 - Automotive Quality Systems Standard 3
R IATF 16949 - Outsourcing of internal audits Internal Auditing 11
eule del ayre Documented Information - Periodic Review of Documents? IATF 16949:2016 / ISO 9001:2015 IATF 16949 - Automotive Quality Systems Standard 34
Crimpshrine13 Laboratory Scope - Calibration vs. Test Methods - IATF 16949 IATF 16949 - Automotive Quality Systems Standard 3
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 12
L IATF 16949 certification costs IATF 16949 - Automotive Quality Systems Standard 3
B FCA US Customer Specific IATF 16949- Critical Characteristics 8.6.2 Customer and Company Specific Requirements 2
B IATF 16949 News Six month extension on all valid IATF 16949 certs IATF 16949 - Automotive Quality Systems Standard 10
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
B FCA US IATF 16949 Customer Requirements updates Customer and Company Specific Requirements 3
S Can assembly manufacturing sub-supplier be certified IATF 16949? IATF 16949 - Automotive Quality Systems Standard 6
D IATF 16949 Requirement for CMMI in a Global Company Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 0
M Tips on preparing for IATF 16949 Internal Lead Auditor exam Manufacturing and Related Processes 1
A IATF 16949 4.3.1 - Determining the scope of the quality management system - supplemental IATF 16949 - Automotive Quality Systems Standard 9
S Definition of "worldwide" in view of IATF 16949 and Product conformity IATF 16949 - Automotive Quality Systems Standard 3
R Where does IATF 16949 address Process mapping? IATF 16949 - Automotive Quality Systems Standard 3
A Document "Correspondence IATF 16949 vs ISO13485" available? IATF 16949 - Automotive Quality Systems Standard 0

Similar threads

Top Bottom