Hello, I am a Process Engineer at a manufacturing plant.
We have just started an Operations Excellence Group. I want to impress my employer since I am working as a contractor now. I want to get hired permanentally. I have done a lot in the past 6 months that I worked here.
All in all, here is what was implemented since I started working here:
-Minimizing Inventory
-Minimize travel/walk time. (some involved redesigning flow line)
-5S Cleanliness Checklists
-Red Tagging to dispose of obsolete and unneeded tools, items, products.
-Shadow Peg Boards
-Continuous Safety Improvement
-Color Coordination
-Minimizing Queue time in various flow lines
-Value Stream Mapping to improve throughput times.
-Design of tooling fixtures to make it easier, faster, more ergonomic to assemble products.
Now I am having a brain freeze. I cannot think of any more ideas.
FYI, Converting the plant to solar power to save on utilities is out of the question. Our building is leased and the building owner is not interested since the payback period for solar power is 20 years.
Does anyone here have additional ideas? I will keep looking through this forum for more info.
Thanks.
We have just started an Operations Excellence Group. I want to impress my employer since I am working as a contractor now. I want to get hired permanentally. I have done a lot in the past 6 months that I worked here.
All in all, here is what was implemented since I started working here:
-Minimizing Inventory
-Minimize travel/walk time. (some involved redesigning flow line)
-5S Cleanliness Checklists
-Red Tagging to dispose of obsolete and unneeded tools, items, products.
-Shadow Peg Boards
-Continuous Safety Improvement
-Color Coordination
-Minimizing Queue time in various flow lines
-Value Stream Mapping to improve throughput times.
-Design of tooling fixtures to make it easier, faster, more ergonomic to assemble products.
Now I am having a brain freeze. I cannot think of any more ideas.
FYI, Converting the plant to solar power to save on utilities is out of the question. Our building is leased and the building owner is not interested since the payback period for solar power is 20 years.
Does anyone here have additional ideas? I will keep looking through this forum for more info.
Thanks.