I have machining background but currently working on development of an injection molding part from a supplier.

I am currently confused about what kind of features should I ask them to do initial process capability?

The part is ABS. I gave them a list of features (pins, holes etc.) to do Cp on both size (e.g. dia) and location (e.g. position, perpendicularity etc.).
But they pushing back saying that they are unable to do Cp on so many dimensions. The dimensions total to about 25.

I am now planning to reduce this list so as to remove the location dimensions, and only ask them to do sizes (length, width, dia, etc.).

However, I am wondering what is the industry norm in initial Cp of injection molding parts?

Thanks.
 
Elsmar Forum Sponsor

Ron Rompen

Trusted Information Resource
#2
Not sure about 'industry norm' as far as the number of features identified for initial process capability.

Process capability requirements should be driven by features that are critical to YOUR process - whether it be diameters, positions, or any other feature.

You can also take into account past history with OTHER similar parts (whether from this supplier or another) and any issues you have had that would have possibly been caught with an initial process capability analysis.

I don't understand how they can 'push back' at this stage, I am assuming that the features requiring capability were identified on the print at the time of quotation. If that did NOT happen, then they do have at least some grounds for complaint.
 

Jafri

Involved In Discussions
#4
I don't understand how they can 'push back' at this stage, I am assuming that the features requiring capability were identified on the print at the time of quotation. If that did NOT happen, then they do have at least some grounds for complaint.
Yes, that is the root of the problem. Thanks for identifying.
The design team took away all critical dimensions from the print for some reason. I wasn't involved at that time.
Now the supplier is making the point that we didn't agree to these dimensions in the first place. Don't there were no criticals mentioned on print, so I picked dimensions myself based on what was important for us from assembly point of view.
 

leftoverture

Involved In Discussions
#6
Sorry I missed this question when you asked it. But I disagree with the poster who says it should be based on what critical to you, because that is only somewhat the case. This is an initial PROCESS study. It measures the capability and stability of the process. Your injection molding supplier is the process expert here so do listen to them and leverage their expertise.

Molding is not like machining. One to three dimensions are all that is needed to assess the stability of the process. In general the desired dimensions will include overall length, width, and height. In other words, in the direction of plastic flow, across plastic flow, and across parting line.

Smaller dimensions such as diameters are not likely to reveal much about the stability of the process. And yes, 25 dimensions is way too many for injection molding. By insisting on that many dimensions you are only adding cost and lead time to your project and you're not getting added value.

Best practice for injection molding: 3 piece per cavity full ISIR and capability study on 2-3 process sensitive dimensions selected with agreement from the molder.
 
N

ncwalker

#7
Will agree with leftoverture on this:

1) Pick a diameter that has a tight tolerance. This will show you what kind of tolerance to expect. And diameters are easy to measure.
2) Pick a diameter that is very different is size from diameter 1. This is because you are dealing with a solidification process, which means a large contributor to variability is initial size due to shrinking associated with cooling. A larger dimension will have more variability than a smaller one.
3) Pick a cross parting line dimension that goes from the A side to the B side. Another molding factor is the consistency with which the mold closes shot to shot. You want a cross parting line dimension is your study to demonstrate this. Key point: the dimension doesn't even have to make sense in the assembly, you want one that is easy to measure. The goal is understanding the molding process.
4) IF the tool has slides, you want to do the same thing as 3 above to the slides. Hopefully, your initial datums are all made by one piece of mold steel. You want a dimension from this piece of steel to every other molding piece. At a minimum, you want to check to at least one moving piece in the A side and one in the B side. Your part may or may not have this complexity. And again, this chosen dimension should be picked as one convenient to measure.
 
Thread starter Similar threads Forum Replies Date
Manix Initial Capability study on N50 parts - Subgroup Size? Statistical Analysis Tools, Techniques and SPC 5
L Basic Need:Initial Capability Study:No critical characteristic on print Statistical Analysis Tools, Techniques and SPC 6
U Is Initial Importer Status Required if a Medical Device is Manufactured and Sterilized by an OEM in the US Other US Medical Device Regulations 1
J Furnace repaired - Do I need a new initial TUS? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
I IQOQ or just initial calibration required? General Measurement Device and Calibration Topics 3
K FDA - Can we have more than 1 Initial Importer Medical Device and FDA Regulations and Standards News 4
J How much to charge for helping a startup company with initial ISO 13485 certification? Consultants and Consulting 3
J ISO 13485 System 'soft start' - How to best reflect this in initial audits, management review minutes and other records? ISO 13485:2016 - Medical Device Quality Management Systems 3
H CQI-15 2nd Edition - Date of initial assessment? IATF 16949 - Automotive Quality Systems Standard 3
MrTetris How to qualitatively assess initial probability ISO 14971 - Medical Device Risk Management 4
S Private Label Requirements, Manufacturer's Registration & Initial Importers 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
S Medical Device Initial Importer (DII) Requirements - Delivery Address 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 0
J AIAG PPAP: 2.2.11.3 Acceptance Criteria for Initial Study (page 9, 4th edition) APQP and PPAP 1
L Why is initial production units, lots, or batches, or their equivalents required for Design Validation? US Food and Drug Administration (FDA) 3
S Initial Importer and ISO 13485 (MDSAP) - Will the US company be included? ISO 13485:2016 - Medical Device Quality Management Systems 1
S Should an Initial Importer separately do Establishment Registration? US Food and Drug Administration (FDA) 1
Y Time gap for First Surveillance Audit of AS9100D after initial certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
T Customer special status and initial IATF certification IATF 16949 - Automotive Quality Systems Standard 12
A Setting initial Expiry Date of an IVD per BS EN 23640:2015 Other Medical Device Related Standards 12
S Registration/Listing; Initial Importer - Private Label w/ Foreign Establishment 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 7
V Inspection of Initial Importer/ Distributor Products and Materials 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
GURU SDI Cleanliness Requirements for Initial Samples Customer Complaints 4
dubrizo Initial Supplier Identification, Review and Controls ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
dubrizo Initial Impressions of Newly Released IATF 16949 Standard IATF 16949 - Automotive Quality Systems Standard 43
C Service and maintenance in an initial importer facility USA 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
A We passed our ISO TS 16949 initial certification Covegratulations 3
knightarmourus Initial Samples with dimensional deviation in Serial Production Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
E Addition of Label by Initial Importer 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
S Struggling with definition of Initial Importer and First Title 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
A API Q1 5.6.1.2 - Initial Supplier Evaluation Oil and Gas Industry Standards and Regulations 9
W AS9100C registration - How long does the system have to run before initial audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
J Required Audit Days for TS 16949 Initial Certification Audit IATF 16949 - Automotive Quality Systems Standard 1
J Is DCR (Document Change Request) Needed for Initial QMS Procedures? Document Control Systems, Procedures, Forms and Templates 16
4 Initial Environmental Review and Gap Analysis, difference? Miscellaneous Environmental Standards and EMS Related Discussions 8
C DCN or ECN for Initial Release of FMEA & CP and subsequent changes? FMEA and Control Plans 3
JoCam NADCAP Initial Audit Cancellation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
E Initial Registration of an Establishment with FDA US Food and Drug Administration (FDA) 5
W Contract Initial Importer and Order Handling for a Class I Medical Device Service Industry Specific Topics 2
L How to change the status of "Initial Importer" on the FURLS site US Food and Drug Administration (FDA) 1
Q Engineering purchased a new Caliper - 7.6 - Initial Calibration Required? General Measurement Device and Calibration Topics 6
J Customer wants a P-value with our initial Process Studies Statistical Analysis Tools, Techniques and SPC 4
C Is an Initial Environmental Review a must while implementing ISO 14001 ISO 14001:2015 Specific Discussions 5
M 7.5.1.3 Should mentioned examples such as initial run be verified or validated? IATF 16949 - Automotive Quality Systems Standard 1
W How do you determine the initial recall date for instrumentation? General Measurement Device and Calibration Topics 1
K 820.180(b) Record Retention - Does it apply here? We act as the initial Importer 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
X General Motors' initial process study requirements APQP and PPAP 1
H Design Control Requirement - Initial Distributor of a Class I Video Laryngoscope US Food and Drug Administration (FDA) 4
M AS9100 Rev C Initial Certification - Determination of Competence AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
N Initial Status Review - Certification to OHSAS 18001 Occupational Health & Safety Management Standards 4
S What's the difference between prototype and initial samples? APQP and PPAP 5

Similar threads

Top Bottom