Gman2
Involved - Posts
Inspection and Test Status for 2000
The old standard had us running around tagging everything with an initialed OK To Use sticker or something equal at every stage.
What are your thoughts about the new standard?
Under 7.5.3 ID and Traceability it states the org SHALL identify the product status with respect to monitoring and measuring requirements.
Does that mean from the time material arrives it needs to be stickered or tagged OK to use from receiving?
Because currently we are not doing that, and before I dive into this process I want to be sure I don't go overkill. I am all about streamlining all these processes here, so far so good I just want to keep the streamline train running.
Right now we identify on our receiving inspection sheets but those do not follow the material.
How do you handle product test status from recipt to dispatch?
Is it tagged or stickered at ALL stages?
G.
The old standard had us running around tagging everything with an initialed OK To Use sticker or something equal at every stage.
What are your thoughts about the new standard?
Under 7.5.3 ID and Traceability it states the org SHALL identify the product status with respect to monitoring and measuring requirements.
Does that mean from the time material arrives it needs to be stickered or tagged OK to use from receiving?
Because currently we are not doing that, and before I dive into this process I want to be sure I don't go overkill. I am all about streamlining all these processes here, so far so good I just want to keep the streamline train running.
Right now we identify on our receiving inspection sheets but those do not follow the material.
How do you handle product test status from recipt to dispatch?
Is it tagged or stickered at ALL stages?
G.