Is Failure to achieve a Goal a Major Non-Conformance?

DietCoke1953

Starting to get Involved
#1
We had a goal to close 85% of all CAR's in less than 30 days. We only reached a level of 75% closure rate.

Could an auditor consider this a Major non-conformance?
 
Elsmar Forum Sponsor

Jen Kirley

Quality and Auditing Expert
Staff member
Admin
#2
Re: Is Failure to achieve Goal a Major Non-Conformance?

Meeting a goal or not is a result, the issue is not closing nonconformances within their planned date.

To be of more use to you there is so much left to understand here, such as:

1) Did any of these NCs involve product to customer or risk of sending bad product to customer?

2) How many NCs were included in the goal?

3) How far past their due date are they?

4) What kind of evidence was available to the auditor to show there was due diligence in pursuing the issues?

5) What was the exact write up of this major nonconformance?
 

John Broomfield

Staff member
Super Moderator
#3
Re: Is Failure to achieve Goal a Major Non-Conformance?

We had a goal to close 85% of all CAR's in less than 30 days. We only reached a level of 75% closure rate.

Could an auditor consider this a Major non-conformance?
DietCoke,

It depends on whether you prioritized action on the vital few...

...and if your haste to close CARs caused root causes to remain in your system.

Between us we may find the objective itself was a bigger nonconformity "failure to evaluate the time needed for effective corrective action".

John
 
#4
Re: Is Failure to achieve Goal a Major Non-Conformance?

We had a goal to close 85% of all CAR's in less than 30 days. We only reached a level of 75% closure rate.

Could an auditor consider this a Major non-conformance?
Only if they were grasping at straws. If they were "good" they'd suggest removing the goal, since closure of corrective actions cannot be completed within 30 days for a proportion and that, as a result, you'd never make 100%
 

Golfman25

Trusted Information Resource
#5
I hate day based "goals" for closing corrective actions. They are arbitrary and have no basis in reality. Many times, it could take a month to determine the root cause, let alone figure out how to fix it.

IMO, not achieving a goal should be just that. A failure to achieve it. It should have nothing to do with a "non-conformance." All this does it set a mindset to make sure your goals are "achievable" so you don't get dinged. As an owner/manager I prefer goals that are hard to meet. I certainly don't want someone coming in from the outside and telling me we have a non-conformance because we did meet our stretch goal.
 

Kevin Mader

One of THE Original Covers!
Staff member
Admin
#6
Major nonconformance are generally the result of a couple things: 1) failure to establish a process to meet a standard requirement (blatant omission) 2) blatant failure to comply with your prescribed program and standard requirements. Severity of a nonconformance can play into how an auditor views an issue. Single point failures are uncommon, but not out of the question (e.g. health risk items that appear ignored). As Jennifer notes, there are other things that can exacerbate a situation.

Missing by 10 points is hardly cause to issue a major NC by itself. There would have to be other factors that would be considered to have that happen in my opinion. And as noted, putting things to 'hard numbers' isn't my normal cup of tea. For CAPAs/CARs, having soft dates based on established risk is a better practice, to help guide things along to a loose schedule. That, along with the due diligence Jennifer mentions, is essential in giving auditors a warm fuzzy that things are being attended to. Even if you miss the 'goal' by 10 points, a solid record of reviews and extensions, etc. should keep things from ending up bad.

I think our colleagues above got the gist of things just right! Good luck!
 

Scott Catron

True Artisan
Super Moderator
#7
I hate day based "goals" for closing corrective actions. They are arbitrary and have no basis in reality.
Exactly. Why did you pick 30 days for a goal? Why not 35? or 25? Why not some other number?

(an P.S. - nice to have a Kevin Mader sighting.)
 
Last edited:
#8
Exactly. Why did you pick 30 days for a goal? Why not 35? or 25? Why not some other number?

(an P.S. - nice to have a Kevin Mader sighting.)
Why choose any specific number of days? That's inappropriate AND an external type of requirement. Anyone who understands how CA works would set a goal of within "+/- 1 day of target for the specific CA issue". That way, it's appropriate to the individual needs of that CA and holds people to their planned actions...
 

Randy

Super Moderator
#9
We had a goal to close 85% of all CAR's in less than 30 days. We only reached a level of 75% closure rate.

Could an auditor consider this a Major non-conformance?
If you are aware of your inability of not meeting your goal and do nothing....Shame on you....But not to the tune of a Major

It's your objective and maybe it was unreasonable, you don't have the resources or whatever...Change it...but not to 75%....Initiate an internal corrective action and fix the problem....

USE THE SYSTEM!!!!!!!!!
 

Jen Kirley

Quality and Auditing Expert
Staff member
Admin
#10
Why choose any specific number of days? That's inappropriate AND an external type of requirement. Anyone who understands how CA works would set a goal of within "+/- 1 day of target for the specific CA issue". That way, it's appropriate to the individual needs of that CA and holds people to their planned actions...
Some target is generally expected as you know, lest actions be left with a vague finish goal that too easily slips to the back burner as it were.

Two unanswered questions are at issue here. Are the targets unreasonable? Or, do people not make serious effort to close the actions?

I didn't include in my list earlier, but you and our fellow Covers have pointed out its relevance:

6) Does the procedure allow for extensions? And if so, were these actions extended?

There is just too little to go on here to decide how to feel. I have lots of clients who don't have problems with assigning target finish dates. If they get it wrong, they extend as long as they need to get it right without undue delay.
:2cents:
 
Thread starter Similar threads Forum Replies Date
C Corrective action for failure in documents control ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
T Root Cause Failure Analysis - Not following Customer packaging Specification Problem Solving, Root Cause Fault and Failure Analysis 5
A Exact terms for a plating failure and difference between rejection rate and failure rate Manufacturing and Related Processes 9
JoCam Failure to test Class I medical device to IEC 60601-1-11 IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
C Kaizen Events - Factors Affecting Failure Lean in Manufacturing and Service Industries 13
C Failure nets - Same level effects FMEA and Control Plans 0
C Failure mode at 0h, vs. 1 year vs. 5 year... FMEA and Control Plans 8
R How to properly use Survival Analysis to predict time to machine failure Reliability Analysis - Predictions, Testing and Standards 0
D Testing to failure for design verification Reliability Analysis - Predictions, Testing and Standards 11
M Informational US FDA – Ethicon Recalls Circular Staplers for Insufficient Firing and Failure to Completely Form Staples Medical Device and FDA Regulations and Standards News 0
C Detection Action for Failure Effects - AIAG 4th Edition Layout FMEA and Control Plans 5
Marc NASA Says Oregon Company Metals Fraud Caused $700 Million Satellite Failure - 2019 World News 16
C PCBA Hardware Component different failure types - How to rate detection? FMEA and Control Plans 8
N PFMEA repetitive failure modes in subsecuent stations. FMEA and Control Plans 1
P Detection rating for a user (surgeon) related failure mode in DFMEA APQP and PPAP 3
J How to look up Failure Modes on FDA website FMEA and Control Plans 4
P Electronic component failure analysis turnaround time Reliability Analysis - Predictions, Testing and Standards 0
C Design for Assembly in DFMEA - Failure Effect of Sub-System(s) FMEA and Control Plans 5
Marc Server RAM Failure - 7 Dec 2018 Forum News and General Information 3
K Spot weld - Peel test failure Manufacturing and Related Processes 3
C Electrical Power Plant Supply failure in PFMEAs FMEA and Control Plans 10
kisxena Memo to File - Failure to Validate Supply Chain Security Management Systems 1
Y IEC 62304 Section 4.3(a) - 100% probability of failure IEC 62304 - Medical Device Software Life Cycle Processes 3
S FMEA column column ''therblig motion'' for a given potential failure FMEA and Control Plans 12
J What does "factional and failure dependencies“ mean? FMEA and Control Plans 1
N PFMEA Potential Failure Mode for Weight FMEA and Control Plans 5
P Root Cause for a Process Validation Batch Failure 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
M Infusion Pump Power Failure Alarm IEC 60601-2-24 IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
K Determining Effect of Failure without a DFMEA (Design FMEA) FMEA and Control Plans 1
R Will multi-time flashovers constitute a failure of Hi-Pot test? IEC 60601 - Medical Electrical Equipment Safety Standards Series 9
P IATF 16949 - 10.2.5 Warranty and 10.2.6 Field failure IATF 16949 - Automotive Quality Systems Standard 1
J Medical Device Failure Effects - Where to draw the line? FMEA and Control Plans 8
kedarg6500 Potential Effects of Failure(s) FMEA and Control Plans 23
Marc Definition PFH - Probability of dangerous failure per hour Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 0
Marc Definition PFD - Probability of failure on demand Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 0
C Squeeze in one more - Rate of failure Statistical Analysis Tools, Techniques and SPC 6
L First Time Completing a 5 Why/RootCause Failure Analysis Nonconformance and Corrective Action 8
Z Failure Mode Identification in PFMEA according to AIAG FMEA Rev.4 FMEA and Control Plans 6
B IPCD Sterility test failure during MPQ (EO sterilization validation) ISO 13485:2016 - Medical Device Quality Management Systems 2
A Failure Mode from Operator "Components Fallen but Loaded" FMEA and Control Plans 3
M Population failure rate based on attribute data Statistical Analysis Tools, Techniques and SPC 4
P UFMEA - Use Failure Mode Effects Analysis FMEA and Control Plans 7
Sean Kelley Seeking Feedback on ASQ Guide to Failure Mode and Effect Analysis FMEA and Control Plans 2
alonFAI Component Failure (Relay) during ICT Testing after Surface Mount Assembly Manufacturing and Related Processes 5
J Thread Gauge Calibration Failure for Pitch Diameter being too large General Measurement Device and Calibration Topics 3
J Should failure mode caused by Fixture problem be into PFMEA? FMEA and Control Plans 2
T Weibull analysis of life time test of 8 electric motors until failure Reliability Analysis - Predictions, Testing and Standards 9
Q Corrective Action - Product failure during testing Nonconformance and Corrective Action 7
T Would a Leak be a Failure Mode on a Design FMEA? Design and Development of Products and Processes 2
B FDA Software Failure Mitigation US Food and Drug Administration (FDA) 18
Similar threads