Is it OK to put 2 Part Numbers on 1 PSW (Part Submission Warrant)?

Elsmar Forum Sponsor
S

sitapaty

#12
You have to submit seperate ppaps for them.Because the part nos are differant
Besides both will be rejected if one of the pair is defective.
Sitapaty
 
P

PasiJ

#13
My supplier submitted 2 part numbers on 1 PSW:
  • it's for a 2 out prog Die.
  • Parts are left and right handed.
I have a problem with it, but don't know of a specific rule that prohibits this. Please let me know.
Two different PSW documents and measurement documents. If other PPAP dpocuments are identical those could be used once.
 
Thread starter Similar threads Forum Replies Date
G Part Numbers and Qualified Suppliers - Put supplier name in the actual drawing sheet? Document Control Systems, Procedures, Forms and Templates 4
A Can a US manufacturer put export only products on a CFG? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
M Hiring Decisions - How much effort do you put into the hiring process these days? (7/2020) Misc. Quality Assurance and Business Systems Related Topics 6
C Is it required to put"Rx only" on the home page of an app? Medical Device and FDA Regulations and Standards News 4
V What plans have been put in place to achieve quality objectives? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
G What information to put on measurement Dimensional Results APQP and PPAP 7
bryan willemot Looking for a good CoC to put with my certification sheets when we send parts Document Control Systems, Procedures, Forms and Templates 1
Z Do we still have to put UDI if we have DI and lot number seperately on our product ? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
D QMS Documentation Process - I want to put all the Process SOPs to a QMS system Document Control Systems, Procedures, Forms and Templates 3
C What are rules to notify customers if IATF cert is put on hold? IATF 16949 - Automotive Quality Systems Standard 2
C IATF 16949 : 2016 - How put in place a Containment for this kind of Major NC IATF 16949 - Automotive Quality Systems Standard 14
K Where in the quality manual do I put our Quality Objectives and our Quality Policy Quality Management System (QMS) Manuals 19
D When Quoting an ISO Standard should I put the quote in italics? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
somashekar How to put in place a Risk Assessment of Vulnerabilities & Corruption... Sustainability, Green Initiatives and Ecology 2
N Microsoft Word - How to make high-light go away after text is put in Excel .xls Spreadsheet Templates and Tools 5
A Two Identical Medical Devices put in different Classes - Class I and Class II 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
L RAPS RAC EU Certificate: is anyone going to put hands on? Professional Certifications and Degrees 4
Crusader Certificate of Compliance - Put a form number on it or not? Records and Data - Quality, Legal and Other Evidence 17
D Multiple Discrepancies put on one SCAR Quality Manager and Management Related Issues 5
I ISO 9001:2008 4.2 Documentation - Where to put a Procedure Quality Manager and Management Related Issues 7
D What Information to put on an Internal Chemical List Food Safety - ISO 22000, HACCP (21 CFR 120) 3
AnaMariaVR2 Why modern maps put everyone at the centre of the world Coffee Break and Water Cooler Discussions 0
S What Spill Containment to Put at Dock Door Miscellaneous Environmental Standards and EMS Related Discussions 4
T What should I put on my Quality Notice Board? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
T What should I put on my Environmental Notice Board? Miscellaneous Environmental Standards and EMS Related Discussions 4
I What do you have to put in place for Sterile Procedure Packs? MDD Article 12 ISO 13485:2016 - Medical Device Quality Management Systems 1
M Shelf Life of Mineral Oil USP (put on cutting burrs before shipping) Manufacturing and Related Processes 19
M MSA - According to the formula cg how much tolerance should be put in place? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
V We put Old plating spec on supplier prints and need to PPAP to Customer. APQP and PPAP 1
M Trying to take current documentation and put it into ISO forms Document Control Systems, Procedures, Forms and Templates 1
K Equipment Lifetime: Put in operation manual or a individual document/declaration Quality Manager and Management Related Issues 1
M AS9101 Appendix D question - What to put in Box 8 ?Process Name? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
D How do you put confidence bounds around bimodal data? Statistical Analysis Tools, Techniques and SPC 12
B Do we need to put the box around the SN symbol listed in EN 980? Other ISO and International Standards and European Regulations 5
Wes Bucey Put some zip in your resume or cover letter Career and Occupation Discussions 1
B Urine Reagent Strips - Which directive should I put on the declaration? EU Medical Device Regulations 1
S Can we put two Manufacturer's address in IFU (Instructions For Use)? CE Marking (Conformité Européene) / CB Scheme 2
E Where to put QMS Definitions, e.g. forms, policies, etc ISO 13485:2016 - Medical Device Quality Management Systems 8
Q Suggestions on what to put on an Employee ISO 9001 Intranet page ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
Marc The Future - G.E.?s Breakthrough Can Put 100 DVDs on a Disc After Work and Weekend Discussion Topics 0
J Suppliers for labels to put on medical device cables Other Medical Device and Orthopedic Related Topics 2
K Where to put Product and Process Characteristics on the Control Plan. FMEA and Control Plans 1
K Where to put product and process characteristic in PFMEA (AIAG Manual 4th edition)? FMEA and Control Plans 6
J Required to put original manufacturers on Approved Supplier List? Supplier Quality Assurance and other Supplier Issues 6
bobdoering Isuzu, Toyota Put Clean Diesel Engine Project On Hold. World News 1
J Metrics to be put in place in our Test department - First Pass Yield and Paretos Quality Tools, Improvement and Analysis 6
R Continental put the boot in.... Travel - Hotels, Motels, Planes and Trains 5
N Yields & Through Put Rates - Food processing industry Manufacturing and Related Processes 3
D Should I put Warehouse under Manufacturing Department? Misc. Quality Assurance and Business Systems Related Topics 8
T How to put some teeth into a Non-Conformance Program Nonconformance and Corrective Action 17

Similar threads

Top Bottom