Hello Dear All,
Need suggestion. Two questions:
We are an aerospace industry building eVTOL Motors and in Prototype stage aiming for MRL5/6. Most of the components are manufactured by our „NEW“ suppliers and sub-suppliers of ISO9001 certified majorly (fast make).
01. During the manufacturing of 20 prototypes (MRL5/6), Do we need to consider conducting MSA? Is it beneficial during this stage? Or beneficial in Production stage only?
02. Incase, If the sub-suppliers are conducting MSA, us it a good approach to skip incoming inspection at our Tier1 Suppliers?
Please suggest.
Thanks s lot in advance.
Best Regards
Need suggestion. Two questions:
We are an aerospace industry building eVTOL Motors and in Prototype stage aiming for MRL5/6. Most of the components are manufactured by our „NEW“ suppliers and sub-suppliers of ISO9001 certified majorly (fast make).
01. During the manufacturing of 20 prototypes (MRL5/6), Do we need to consider conducting MSA? Is it beneficial during this stage? Or beneficial in Production stage only?
02. Incase, If the sub-suppliers are conducting MSA, us it a good approach to skip incoming inspection at our Tier1 Suppliers?
Please suggest.
Thanks s lot in advance.
Best Regards