SBS - The best value in QMS software

Is Quarry Blasting a Special Process according to 7.5.2?

Randy

Super Moderator
#11
On an other note, the first and the best measure of a good blast is made from the sound heard of the blast by the blast site manager. This is based on experience and not a direct measure. Hence this process can never get into the requirement of 7.5.2.
After one has blasted enough he can tell a fizzle from a good blow, trust me. I've known guys who could pile stuff up from a blast as good as a shovel
 
Elsmar Forum Sponsor

armani

Involved In Discussions
#12
Thank u all for ur opinions .... It's good having a third (fourth, fifth...) opinion!
But, one question arises with obstinacy (for the sake of your opinion): validation is not mandatory according to ISO 9001, so, excluding it, could rock blasting still be "special process" (7.5.2 a-d)?
It would induce a more sense of responsibility in treating this process as part of ISO 9001 Q mgm. system, I think!
 
Last edited:

somashekar

Staff member
Super Moderator
#13
Thank u all for ur opinions .... It's good having a third (fourth, fifth...) opinion!
But, one question arises with obstinacy (for the sake of your opinion): validation is not mandatory according to ISO 9001, so, excluding it, could rock blasting still be "special process" (7.5.2 a-d)?
It would induce a more sense of responsibility in treating this process as part of ISO 9001 Q mgm. system, I think!
I would more say it as a specialized process as it involves high levels of risk of life, serious injury, property damage , legal and more, associated to quarry blasting process.
 

Big Jim

Super Moderator
#14
Thank u all for ur opinions .... It's good having a third (fourth, fifth...) opinion!
But, one question arises with obstinacy (for the sake of your opinion): validation is not mandatory according to ISO 9001, so, excluding it, could rock blasting still be "special process" (7.5.2 a-d)?
It would induce a more sense of responsibility in treating this process as part of ISO 9001 Q mgm. system, I think!
I think you are still hung-up on understanding the definition of a "special process". If you look to the aerospace standard, AS9100C, you will get a better idea. I understand that what is there is actually a holdover from an earlier iteration of ISO 9001.

In AS9100C, "special processes" shows up as a note for 7.5.2.

"NOTE These processes are often referred to as special processes."

You keep trying to put the term special processes somewhere else, but it belongs right here in 7.5.2, validation of processes. When you can't tell the outcome of a process from ordinary inspection, it needs to be validated. These processes that require validation are special processes, plain and simple.

I believe, as others have told you, that quarry blasting is not a special process. You can tell the outcome from ordinary inspection.

Is it possible that you have no special processes and could claim 7.5.2 as an exclusion? Yes. Just make sure that there are no processes that require validation.

From my experience, it is the 2nd most claimed exclusion, well behind design.
 
Thread starter Similar threads Forum Replies Date
V Any international guidelines for Mines Quarry & Mineral Processing Plant EMS? Miscellaneous Environmental Standards and EMS Related Discussions 12
Judy Abbott General temperature used in the blasting process and laser process Manufacturing and Related Processes 2
A Blasting Visual Standard Validation - Site Acceptance Test required Other Medical Device and Orthopedic Related Topics 1
Nihls MSA Study Type 2 (special conditions ) IEC 60601 - Medical Electrical Equipment Safety Standards Series 0
Techilady Ford Special Characteristics Communication and Agreement Form (SCCAF) provides production requirements? FMEA and Control Plans 4
R Critical Characteristics & Special Characteristics FMEA and Control Plans 2
P Letter to file or special 510k or traditional 510k 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
S OEM full range calibrations vs Validation special test points Medical Device and FDA Regulations and Standards News 0
G Special 510K possible? Only the packaging has changed Other US Medical Device Regulations 0
S Special 510(k) for orthopedic implant 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
N Riveting - special process Manufacturing and Related Processes 11
H AS9100D clause 8.5.1 f) & 8.5.1 g) - Special Processes AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
C AIAG-VDA PFMEA - 1st special Characteristics? [5step vs. 6step] FMEA and Control Plans 3
J 1.11 Preliminary Identification of Special Product and Process Characteristics APQP and PPAP 4
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 12
Y What are different Special Inspection Level 1-4 and General spesification 1-3 ? AQL - Acceptable Quality Level 0
L Special Processes for SERVICES AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
K PSA Special characteristics Customer and Company Specific Requirements 0
Watchcat Advantages to pursuing a Special 510(k) instead of a Traditional 510(k) Other US Medical Device Regulations 5
qualprod Managing a "special" customer into the QMS? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
S Special 510(K) - Labeling change from Rx to OTC Other US Medical Device Regulations 11
M Special Controls and Class II Medical Devices Medical Device and FDA Regulations and Standards News 18
A ISO 10993-7:2008/ Amd.1:2019 - Classification of special populations Other Medical Device Related Standards 3
H SPC for special characteristics - CSR - Control of SC and CC Statistical Analysis Tools, Techniques and SPC 1
L Special Processes - Technical reason concerning torque - Anaerobic compounds Manufacturing and Related Processes 10
M Informational US FDA Final Guidance – Special Premarket Notification [510(k)] Pathway Medical Device and FDA Regulations and Standards News 0
F Replacement Bone Screws - Traditional 510(k) or Special 510(k)? Other US Medical Device Regulations 7
F Assignment of Special Characteristics to government regulations IATF 16949 - Automotive Quality Systems Standard 5
qualprod ISO 9001:2015 8.5.1 f - Scope with customer special process requirements ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
J ISO 13485 - 7.5.2 cleanliness , 6.4.2 validation of special processes, and 6.4.2 contamination ability to be exempt? ISO 13485:2016 - Medical Device Quality Management Systems 5
L Injection Moulding Process (Special Process) Validation Food Safety - ISO 22000, HACCP (21 CFR 120) 2
S The key differences in 510k types - Traditional vs. Abbreviated vs. Special US Food and Drug Administration (FDA) 0
D I'm new in IMDS special using the IMDS application Manufacturing and Related Processes 8
S VW Special status condition IATF 16949 - Automotive Quality Systems Standard 3
K Letter to file vs Special 510 for additional accessory in orthopaedic kit Other US Medical Device Regulations 1
P Special 510(k) - Modified Medical Device Description Other US Medical Device Regulations 8
P V&V for Special 510k 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
F CQI-23 Special Process Molding - Controls IATF 16949 - Automotive Quality Systems Standard 7
B AS9100 - Are special process suppliers required to be NADCAP accredited? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 15
A Non-destructive testing methods are special processes? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 18
P Sanctioned Interpretations - IATF 16949 Cl. 8.3.3.3 Special characteristics IATF 16949 - Automotive Quality Systems Standard 3
E IATF 16949 Cl. 8.2.3.1.2 - Customer-designated special characteristics IATF 16949 - Automotive Quality Systems Standard 1
T Customer special status and initial IATF certification IATF 16949 - Automotive Quality Systems Standard 12
J NADCAP - Supplier Special Processes Certifications Manufacturing and Related Processes 1
N Special Vs Non-Special Processes Misc. Quality Assurance and Business Systems Related Topics 15
D Customer-Designated Special Characteristics vs. Special Characteristics IATF 16949 - Automotive Quality Systems Standard 2
S IATF 16949 Clause 8.3.3.3 - Documentation of all Special Characteristics in Drawings IATF 16949 - Automotive Quality Systems Standard 2
A Special Procedures for Non Aerospace Customers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
M AS9110C Clause 8.5.1.2 Validation and Control of Special Processes for Repair Station AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
C AS9102 Form 2 Information - Special Processes - Plating AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2

Similar threads

Top Bottom