Is the first piece inspection method supposed to be in the Control Plan?

P

Pudge

#1
Hello,
I am currently in the process of my first Control Plan by myself, I have assisted in a few, but now I am on my own. My question, Is the first piece inspection method supposed to be in the Control Plan?
 
Elsmar Forum Sponsor

The Taz!

Quite Involved in Discussions
#2
Pudge said:
My question, Is the first piece inspection method supposed to be in the Control Plan?
Welcome!

I see no reason why it should not be. . . if that is a NORMAL part of your process control techniques or verification, it is absolutely valid to include it. It would a part of setup process verification as I see it. . . of course. . . all you can guarantee if the part is acceptable is that you can ship it. . .subsequent process controls take over in production.
 
B

Bill Ryan - 2007

#3
Welcome, Pudge :bigwave:

I agree with Taz. You're Control Plan should address all the controls you have in place - both Product and Process. We typically have a "First/Last piece" check and then have ""X" times per shift" checks for the die cast operation. Our "First/Last piece" checks include ALL the "per shift" checks. It's just a blurb in the "Sample Size/Frequency column" on the CP.

Good Luck and let us know if you've got any other questions.
 
D

Diana Cadwalader

#4
First Piece inspection in CP

I would have to concur with everyone else -- Your inspection criteria should all be listed in the CP. Particularly if it is being carried from the FMEA. In my experience, the harder part of drafting the CP is in defining the reaction plan. Most CPs that I have seen say "stop and adjust" or "MRR product" - - this is not fulfilling the intent of the CP, which is to instruct the operator as to what action to take to correct the process. Good luck to you.
 

sowmya

Involved - Posts
#5
Diana is very correct. The most harder part is filling the reaction plan. During our audit we have faced the same issue.

I think you can include all the inspection processes (in process, first piece, final etc.,) and set up approvals in the CP.
 
W

wallyqc

#7
First pc.

My first piece inspection work instruction says "inspect 5 parts to all inspection items on the control plan."

wallyqc
 
Last edited by a moderator:

Wes Bucey

Quite Involved in Discussions
#9
Please, can you help me understand what you mean by "first piece"?

It seems obvious from the context of the posts so far that we are not talking about "First Article Inspection" which in my experience means checking EVERY dimension and attribute of a part made on the exact production machinery which will be used to continue producing the part. Technically, the First Article is usually not the very first piece, but, in fact, the first piece once the machinery is tweaked, but before actual production is authorized.

In a Control Plan, in my further experience, producers generally include the following steps:
  • First Article Inspection (often redundantly approved by a customer before production can begin if it is a custom part. FAI may be performed under laboratory conditions. The First Article is almost always tagged and reserved for future reference.)
  • an inspection plan to take consecutive samples of the production run at predetermined intervals. (in process) These samples are often only inspected for critical characteristics. Almost always, these inspections are performed by the operators at the machine or by inspectors coming to the machine. (Critical characteristics may be crucial fit or function ones or they may be "process critical" ones which flag when a tool may need to be changed because of wear.)
  • a plan to use the readings from the inspections in statistical analysis (SPC, Cpk, etc.)
In ten years in a high tech machining environment, I never heard the term "first piece" except as shorthand for First Article Inspection.
 

sowmya

Involved - Posts
#10
Good point!. Normally this conflict occurs in my company always. Ours is manual (80%) and Machine(20%) company.

So we have three terms ( I don't know whether it is followed everywhere, but we are following like)
First piece approval - The very first piece of the production ( Manual ) is approved - Obviously we cannot predict all the pieces will be correct. But atleast wrong interpretation or wrong understanding by the operator can be avoided.

Set up approval - For machine dependent processes, the setting of the machines and the output from the machine is verified

First article - As you said, when we ship the samples to customers we call it as first article.

Expecting more arguements / views from everyone

Sowmya
 
Thread starter Similar threads Forum Replies Date
S Improving Quality inspection gate in one piece flow manufacturing process Manufacturing and Related Processes 0
J AS9100D Sections related to 1st Piece and In-Process Inspection Manufacturing and Related Processes 15
I First Piece Inspection classified as a Key Process Input FMEA and Control Plans 2
5 First Piece Inspection (Primarily Standard Machining) Question Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
Q Effective 1st Piece Inspection Sign Off Procedure Quality Manager and Management Related Issues 8
M Example of a typical First Piece Inspection Procedure Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
B CNC Machining Shop still heavily relies on First Piece and Final QC Inspection Manufacturing and Related Processes 5
D First Piece Set-Up Inspection question Manufacturing and Related Processes 11
jkuil Recording of First Piece Inspection to meet 21 CFR 820.80e and ISO 13485 7.5.1.1 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 8
J Software or template to manage first piece, in process and final inspection reports Software Quality Assurance 2
K First Piece vs. First Article - QC Inspection Terminology Inspection, Prints (Drawings), Testing, Sampling and Related Topics 24
P No In-process or first piece inspection - Final Inspection ONLY! Am I wrong? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 37
D Does every piece of equipment used in a laboratory need to have an IQ protocol written and executed? ISO 13485:2016 - Medical Device Quality Management Systems 1
S "X-MR charts do not separate piece-to-piece repeatability of the process" Statistical Analysis Tools, Techniques and SPC 2
S Setting up the process - First piece inspections Statistical Analysis Tools, Techniques and SPC 3
S If a piece of software receives approval as part of a medical device system Canada Medical Device Regulations 5
K Gage R on a 10 Piece Sample with a CMM using Minitab Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
A Simple 125 piece part Capabilty Excel .xls sheet to calculate Cpk Capability, Accuracy and Stability - Processes, Machines, etc. 3
H Do we need all three AS9102 forms if we manufacture only Piece Parts? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
C One sample piece from standard production? AS9102 FAIR questions AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
N Designing an attribute MSA for a new piece of metrology equipment Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 11
CalRich Retention of First Piece from each Production Run IATF 16949 - Automotive Quality Systems Standard 11
D Distribution of a Kit composed of Piece Parts from several Manufacturers EU Medical Device Regulations 3
8 Single Piece Flow Game - Understanding the Principles and Logic of Single Piece Flow Lean in Manufacturing and Service Industries 3
M About First and Last Piece Procedure & Marking, Packing, Traceability IATF 16949 - Automotive Quality Systems Standard 7
M TS 16949 Sampling Plan Information - List the specific dimensions for each piece? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
C Traceability without Working Order - Batch to One Piece Flow AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
N Nonconforming Product - 1st Piece Rejection Nonconformance and Corrective Action 3
R Control on Setting piece mix-up - Are there any fool proof systems? Quality Tools, Improvement and Analysis 2
R Anyone know how to establish one piece flow in apparel industry? Lean in Manufacturing and Service Industries 9
ScottK Inspecting surface finish on SS on a piece that can't be measured with current equip. Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
T Employee home piece work and supplier control ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 22
K Chrysler requirements for First Piece Approval IATF 16949 - Automotive Quality Systems Standard 3
J Process Capability Sheet for a short term 30 piece study needed Statistical Analysis Tools, Techniques and SPC 1
Y Implementing One Piece Flow Lean in Manufacturing and Service Industries 9
C Cost per Piece of Powder Painted Part Manufacturing and Related Processes 3
Q Teeth Sharpness Measurement - Broaching into a flat aluminum piece General Measurement Device and Calibration Topics 7
S Calibration Labels Per Piece or is a Listing Acceptable? General Measurement Device and Calibration Topics 4
K Looking for some Quality Catch Phrases - First Piece and Last Piece Displays Document Control Systems, Procedures, Forms and Templates 34
B Should 1st Piece Process be a Control or a Line Item in the Control Plan FMEA and Control Plans 10
B ISO10012:2003 Question - Choosing or assessing the capability of a piece of equipment Other ISO and International Standards and European Regulations 1
D What does 1st piece (1st Article) mean to a lay person like myself? IATF 16949 - Automotive Quality Systems Standard 12
A The Numeracy Piece - Word is new to me, does anyone know about it? Statistical Analysis Tools, Techniques and SPC 1
A Customer wants to invoke AS9103 on one time buy of 25 piece order. AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
A Customer wants AS9103 applied to 30 piece order. Quality Tools, Improvement and Analysis 2
M Management Review: "Powerful Tool" (ISO 9004 5.6.3) or Redundant Piece of Paper? Management Review Meetings and related Processes 17
S Can a trained person in our lab "certify" a piece of steel gauge General Measurement Device and Calibration Topics 3
M Single piece APQP APQP and PPAP 1
M Document Evidence for One Piece Flow Processes Misc. Quality Assurance and Business Systems Related Topics 8