ISIR (Initial Sample Inspection Report) vs. PSW (Part Sample Warrant)

S

Scott Hackler

#1
ISIR vs PSW

I have read articals (can't remember which publications, but have seen it twice) when refering to Initial Sample Inspection Report (ISIR) it was followed by (Now PSW). PSW is Product Sample Warrant, but I fail to find documentation supporting the change from ISIR to PSW.

We submit numerous ISIR's to our automotive customers. As we implement TS, do we now refer to them as PSW's?
 
Elsmar Forum Sponsor
J

JaySturgeon

#2
Imho

IMHO

ISIR is the layout inspection report submitted with the PSW (Part Submission Warrant).

The PSW will reference the ISIR typically only if something is not to specification.

Jay Sturgeon

:truce:
 
S

Scott Hackler

#3
PSW was described as "Product Sample Warrant."
It made it sound as if Initial Sample Reports were being revised to Product Sample Warrants by writing it in this manner "ISIR (Now PSW)."
- Not the case, huh?
 
J

JaySturgeon

#4
Scott Hackler said:
PSW was described as "Product Sample Warrant."
It made it sound as if Initial Sample Reports were being revised to Product Sample Warrants by writing it in this manner "ISIR (Now PSW)."
- Not the case, huh?
Scott:

Look at the PPAP Manual Page 54 at the sample PSW.

Jay
 
#6
In the beginning, when Ford developed their Q!/Q100/Q101 program they referred to their approval process as "ISIR" With the advent of QS9000 the term PPAP was developed. The Ford ISIR contained the same/similar items as the PPAP, including a PSW.
As Howard states, Germany uses the term ISIR; as do most of the JApanese automakers.
TS2 does not use an acrynom. It simply states "conform to a product and manufacturing process approval procedure recognized by the custmer" A rose by any other name . . .
 
Thread starter Similar threads Forum Replies Date
B Is PPAP the same process as a ISIR (Initial Sample inspection report)? APQP and PPAP 15
T How to report Basic Dimensions on a Dimensional Report (ISIR) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
T PPAP - Intent of an ISIR ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Can the same form number be in Word and Excel for ISIR's and such? Document Control Systems, Procedures, Forms and Templates 9
P ISIR vs. PPAP - Customer is requesting an ISIR Cover Sheet according VDA Quality Manager and Management Related Issues 5
J How much to charge for helping a startup company with initial ISO 13485 certification? Consultants and Consulting 3
J ISO 13485 System 'soft start' - How to best reflect this in initial audits, management review minutes and other records? ISO 13485:2016 - Medical Device Quality Management Systems 3
H CQI-15 2nd Edition - Date of initial assessment? IATF 16949 - Automotive Quality Systems Standard 3
MrTetris How to qualitatively assess initial probability ISO 14971 - Medical Device Risk Management 4
S Private Label Requirements, Manufacturer's Registration & Initial Importers 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
S Medical Device Initial Importer (DII) Requirements - Delivery Address 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 0
J AIAG PPAP: 2.2.11.3 Acceptance Criteria for Initial Study (page 9, 4th edition) APQP and PPAP 1
L Why is initial production units, lots, or batches, or their equivalents required for Design Validation? US Food and Drug Administration (FDA) 3
S Initial Importer and ISO 13485 (MDSAP) - Will the US company be included? ISO 13485:2016 - Medical Device Quality Management Systems 1
S Should an Initial Importer separately do Establishment Registration? US Food and Drug Administration (FDA) 1
Y Time gap for First Surveillance Audit of AS9100D after initial certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
J Initial capability for injection molding part Capability, Accuracy and Stability - Processes, Machines, etc. 6
T Customer special status and initial IATF certification IATF 16949 - Automotive Quality Systems Standard 12
A Setting initial Expiry Date of an IVD per BS EN 23640:2015 Other Medical Device Related Standards 12
S Registration/Listing; Initial Importer - Private Label w/ Foreign Establishment 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 7
V Inspection of Initial Importer/ Distributor Products and Materials 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
GURU SDI Cleanliness Requirements for Initial Samples Customer Complaints 4
dubrizo Initial Supplier Identification, Review and Controls ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
dubrizo Initial Impressions of Newly Released IATF 16949 Standard IATF 16949 - Automotive Quality Systems Standard 43
C Service and maintenance in an initial importer facility USA 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
A We passed our ISO TS 16949 initial certification Covegratulations 3
K Initial Samples with dimensional deviation in Serial Production Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
E Addition of Label by Initial Importer 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
S Struggling with definition of Initial Importer and First Title 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
A API Q1 5.6.1.2 - Initial Supplier Evaluation Oil and Gas Industry Standards and Regulations 9
W AS9100C registration - How long does the system have to run before initial audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
J Required Audit Days for TS 16949 Initial Certification Audit IATF 16949 - Automotive Quality Systems Standard 1
JodiB Is DCR (Document Change Request) Needed for Initial QMS Procedures? Document Control Systems, Procedures, Forms and Templates 16
4 Initial Environmental Review and Gap Analysis, difference? Miscellaneous Environmental Standards and EMS Related Discussions 8
C DCN or ECN for Initial Release of FMEA & CP and subsequent changes? FMEA and Control Plans 3
JoCam NADCAP Initial Audit Cancellation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
E Initial Registration of an Establishment with FDA US Food and Drug Administration (FDA) 5
W Contract Initial Importer and Order Handling for a Class I Medical Device Service Industry Specific Topics 2
L How to change the status of "Initial Importer" on the FURLS site US Food and Drug Administration (FDA) 1
Q Engineering purchased a new Caliper - 7.6 - Initial Calibration Required? General Measurement Device and Calibration Topics 6
J Customer wants a P-value with our initial Process Studies Statistical Analysis Tools, Techniques and SPC 4
C Is an Initial Environmental Review a must while implementing ISO 14001 ISO 14001:2015 Specific Discussions 5
M 7.5.1.3 Should mentioned examples such as initial run be verified or validated? IATF 16949 - Automotive Quality Systems Standard 1
W How do you determine the initial recall date for instrumentation? General Measurement Device and Calibration Topics 1
K 820.180(b) Record Retention - Does it apply here? We act as the initial Importer 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
X General Motors' initial process study requirements APQP and PPAP 1
H Design Control Requirement - Initial Distributor of a Class I Video Laryngoscope US Food and Drug Administration (FDA) 4
M AS9100 Rev C Initial Certification - Determination of Competence AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
N Initial Status Review - Certification to OHSAS 18001 Occupational Health & Safety Management Standards 4
S What's the difference between prototype and initial samples? APQP and PPAP 5

Similar threads

Top Bottom