All that the standard expects you to do is to:
Determine
Provide
Maintain
The needed infrastructure.
The standard here has been so lenient that it does not ask for any requirements of records.
If there are evidences that the QMS performance is adversely effected due to lack of Maintenance of provided infrastructure, such can be audit evidences for a NC. The rest like the checklist, PM, b/d M, records, any maintenance procedures, critical parts inventory holding, etc etc ... are all your own inclusions. If you have brought them into the QMS, then please respect the same. There is no need also to document how you will perform the maintenance process either.
Post #18, says it all so well ...
Determine
Provide
Maintain
The needed infrastructure.
The standard here has been so lenient that it does not ask for any requirements of records.
If there are evidences that the QMS performance is adversely effected due to lack of Maintenance of provided infrastructure, such can be audit evidences for a NC. The rest like the checklist, PM, b/d M, records, any maintenance procedures, critical parts inventory holding, etc etc ... are all your own inclusions. If you have brought them into the QMS, then please respect the same. There is no need also to document how you will perform the maintenance process either.
Post #18, says it all so well ...