Helmut Jilling

Auditor / Consultant
#21
All that the standard expects you to do is to:
Determine
Provide
Maintain
The needed infrastructure.
The standard here has been so lenient that it does not ask for any requirements of records.
If there are evidences that the QMS performance is adversely effected due to lack of Maintenance of provided infrastructure, such can be audit evidences for a NC. The rest like the checklist, PM, b/d M, records, any maintenance procedures, critical parts inventory holding, etc etc ... are all your own inclusions. If you have brought them into the QMS, then please respect the same. There is no need also to document how you will perform the maintenance process either.
Post #18, says it all so well ...
I agree the procedure is not a required procedure. But, I would expect to see some sort of record that maintenace of equipment was performed. But the checklist could be sufficient.
 
Elsmar Forum Sponsor

Helmut Jilling

Auditor / Consultant
#22
Okay, got it! So he had no hard evidence that the PM process was ineffective but he wasn't overly impressed with the checklist we maintained and that probably did not provide a lot of control over PM, but I revised the checklist to get a lil more technical. Hopefully that should solve the problem and as for changing the procedure ( I hate doing so without a strong cause) should I add that PM is being controlled by maintaining check lists as records? That bit isn't mentioned in the procedure but I think with that being said, he can't say that we are not controlling the process.

Thanks!
I still think that you are chasing a nonconformance that you do not fully understand,,,I don't either....so how are you going to root cause the failure, when the failure is not clearly stated. You can guess at what you think he wants to see, to be agreeable. Or, you can request a clarification from the auditor...I mean, I don't even understand what that gibberish was supposed to mean... Or, you can officially appeal it and ask the registrar to review it.

You also have the option to request a different auditor be assigned if you feel this one does a lot of this kind of finding. If you feel you need to.
 

roneljdsilva

Involved In Discussions
#23
Okay let me clarify a few things. It was sent to me as an observation but he did demand a corrective action and a root cause analysis for it and so I am treating it as I would a finding. I actually do not clearly understand what he meant by procedure not identifying controls when I think we have some controls over this process. Also I am trying to get our QMS compliant to API Q1 which demands a documented procedure and control of records. But then again, they do not seem so strict about this whole process.


This audit was a supplier audit that they conducted on us as we supply some drilling equipment over to them every now and then so I was guessing I might as well just revise my records with a better checklist and revise the procedure to include the controls we have already been taking.

I appreciate the help I am learning so much from the Cove, I'm really grateful. And Helmut, I did receive another finding regarding training. If I could send you a message, could I get this clarified? Thanks.
 

Helmut Jilling

Auditor / Consultant
#24
Okay let me clarify a few things. It was sent to me as an observation but he did demand a corrective action and a root cause analysis for it and so I am treating it as I would a finding. I actually do not clearly understand what he meant by procedure not identifying controls when I think we have some controls over this process. Also I am trying to get our QMS compliant to API Q1 which demands a documented procedure and control of records. But then again, they do not seem so strict about this whole process.


This audit was a supplier audit that they conducted on us as we supply some drilling equipment over to them every now and then so I was guessing I might as well just revise my records with a better checklist and revise the procedure to include the controls we have already been taking.
Well, that changes the story significantly... you should have stated that at the outset. My answers were directed at the normal CB audit scenario. If this is a customer audit, then the only option you have is to ask for clarification, explain you don't fully understand what the finding is requesting, then put it in place. I agree what he is looking for can be beneficial, it is just over and above the minimums that ISO 9001 requires.
 
Thread starter Similar threads Forum Replies Date
C Requirement to link Quality Manual to ISO 9001 clause numbers? ISO 13485:2016 - Medical Device Quality Management Systems 13
S ISO 9001 Clause 8.2.3 - Review of the requirements for products and services in a Cafe ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
lanley liao How to understand the clause 6 Planning of ISO 9001:2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
J Scope of ISO 9001 clause 10.2 in the product life cycle ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
I Master Document Access - ISO 9001:2015 clause 7.5.3 Document Control Systems, Procedures, Forms and Templates 5
qualprod Why new clause (7.1.6) in ISO 9001:2015? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
L Clause 0.4 of ISO 9001 and EHS - Where should I stop the inclusion of EHS in my QMS ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
S ISO 9001 Clause 8.3 Design for an education services provider ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
S ISO 9001 Clause 8.3 - Design & Development for training course center ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
C Determining if Maintenance Contractor is an External Service subject to ISO 9001 Clause 8.4 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 43
M IATF 16949:2016 clause 8.4.2.3 - We don't have ISO 9001:2015 certificate IATF 16949 - Automotive Quality Systems Standard 26
S ISO 9001:2015 Clause 9.3.2 - MR (Management Review) - Adequacy of resources ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
S ISO 9001:2015 Clause 8.7 Control of Nonconforming Outputs ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 24
qualprod ISO 9001 Clause 9.1 - Monitoring measurement analysis and evaluation ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
D ISO 9001:2015 Clause 8.4.3 "Information for External Providers" buying from online retailers. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
A Records required for ISO 9001 clause 7.1.5.1 - Fitness for purpose of the monitoring and measurement resources ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
E ISO 9001:2015 Clause 10.2.2 - Evidence of all nonconformities and actions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
qualprod ISO 9001:2015 Clause 8.3 - Is it possible to exclude one product but include it in other? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
qualprod Only manufacturing, non applicable - ISO 9001 Clause 8.3 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
A What ISO 9001:2015 clause could be used to write nonconformance for not updating licensed driver list? General Auditing Discussions 8
MichaelDRoach ISO 9001:2015 Clause 9.3.2c)3) - What process or processes is this focused on? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
R CIP (Corrective Action) requirements - ISO 9001 clause 10.2 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
H Clause 8.5.5 and Clause 8.6: which one should be coming first? (ISO 9001:2015) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
GStough ISO 9001:2015 Clause 8.4.2 - Who Is The "Its" in (a)..The Supplier or Their Supplier? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
S Which ISO 9001 Clause applies to "Procedures are outdated"? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 31
R ISO 9001:2015 Clause 7.1.5.2 - Is Measurement traceability applicable? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
Q How to comply with ISO 9001:2015 Clause 7.4 Communication ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
qualprod ISO 9001:2015 - Right method to address clause 6.1? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
J ISO 9001:2015 Cl. 8.1 - 'and to implement the actions determined in clause 6' ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M Referencing ISO 9001:2015 clause for Audit General Auditing Discussions 10
P Design and Development Clause ISO 9001:2015 Exclusion for Medical Services Design and Development of Products and Processes 3
K ISO 9001:2015 clause 9.2.2 a. - Define the audit criteria and scope Internal Auditing 2
K ISO 9001:2015 Clause 5.1.2 Customer Focus (a) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
Q Values - ISO 9001 2015 - Clause 4.1 Note 3 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
A How to 3rd Party Audit ISO 9001 Clause 7.1.6 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
M What do you do for ISO 9001 clause 9.1? Key Performance Indicators ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
T ISO 9001:2015 Clause 9.2.2 Internal Audit - Corrective Action Report Format ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
J ISO 9001:2015 - Clause for Correction of a QMS Nonconformity ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
A How to approach ISO 9001:2015 Clause 7.1.6 when 3rd Party Auditing ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
K What can be considered a "Post Delivery Activity" (ISO 9001:2015 Clause 8.5) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18
A ISO 9001:2015 Clause 9.3.2 - Management Review Inputs must be Documented? Management Review Meetings and related Processes 15
A ISO 9001:2015 Clause 7.1.1.b refers to ....? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
S What do I have to do for ISO 9001:2015 Clause 6.2 - Planning ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
S What do I have to do for ISO 9001:2015 Clause 4.1 and 4.2 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
J Does the word "claim" in ISO 9001 Clause 8.2.2 mean "requirement"? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
Q Drawings from Client - ISO 9001:2008 Clause 4.2.3 or 7.5.4? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
W ISO 9001:2015 Clause 7.5.2 - Is Review and Approval applicable to Records? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 30
B Clarification of ISO 9001:2015 Clause 8.5.6 Control of Changes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
S ISO 9001:2015 Clause 8.2.1 e) - Requirements for Contingency Actions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
C Application of ISO 9001:2015 Clause Interpretations for Service Industries Service Industry Specific Topics 2

Similar threads

Top Bottom