P
Hi there,
During the execution of the GRR, are you unloading / loading the parts between same operator's repetitions, or only between the different operators?
I'm used to unload them on both.
Spoke to another guy and he told me he's used to unload only between different operators.
The measurement process is parts manually loaded on a jig and measured automatically by an optical machine.
I have a doubt and I didn't find any clue about that (is there somehting mentioned in the MSA 3rd edition?)
Thanks
During the execution of the GRR, are you unloading / loading the parts between same operator's repetitions, or only between the different operators?
I'm used to unload them on both.
Spoke to another guy and he told me he's used to unload only between different operators.
The measurement process is parts manually loaded on a jig and measured automatically by an optical machine.
I have a doubt and I didn't find any clue about that (is there somehting mentioned in the MSA 3rd edition?)
Thanks