G
Hello everyone,
I'm wondering if anyone has come up with a "gauge evaluation sheet/form"? I'm looking for something I can use to say that I have evaluated the risks of using a gauge with a 29% GR&R (for example) and my reasons for not replacing or improving the system are: (no suitable alternative; too expensive; job is temporary; etc.)
Thanks in advance,
gaugefixer
I'm wondering if anyone has come up with a "gauge evaluation sheet/form"? I'm looking for something I can use to say that I have evaluated the risks of using a gauge with a 29% GR&R (for example) and my reasons for not replacing or improving the system are: (no suitable alternative; too expensive; job is temporary; etc.)
Thanks in advance,
gaugefixer