Machine GR&R (Gage R&R) - Capability Study

T

terranceyu

#1
Hello guys,

Currenely my customer have been given me the new task, which is The gage R&R will now be performed when: any new system or upgrading, any spare part change that cause major breakdown to the machine. Also, when new jig and tools are in placed.

Let me illustrate the problem. The machine used was structured and run in three axis. The program consisted of 200 steps. It was fully run in electro-pneumatic. What should I check on to evaluate the machine performance?

Please enlighten me, guys, as I am really cracking head and couldn't find any hint to start it.:frust:

Regards,
Terrance
 
Elsmar Forum Sponsor
S

someshvar

#2
Re: machine GR&R - capability study

terranceyu,

May be if you could let us know the exact change that you made this time, it would help fellow covers to guide you specifically.

Regards,
Hardik Someshvar
 
T

terranceyu

#3
Re: machine GR&R - capability study

The bore screw was changed actually for this time breakdown.:rolleyes:

Regards,
Terrance
 
L

Lilyshen - 2011

#4
Re: machine GR&R - capability study

I think you don't need to do GR&R for this changed.
 
J

justncredible

#6
You can do a machine capability study on parts produced and then do a gage R&R on the tools used to measure the parts.

Or

You can also have the machine calibrated. For machine calibration I think they map out the machine errors and adjust them out.
 
Thread starter Similar threads Forum Replies Date
Y Product Stability (Machine Capability) vs. Equipment Repeatability (Gage R&R) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7
Q Gage R&R for Instant Measurement Machine Manufacturing and Related Processes 6
L Gage R&R >10% - Decrease Machine Limits? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
C Refractometer Gage R&R for a Refractometer for Machine Coolant Quality Tools, Improvement and Analysis 4
M Pressure gage on a machine-monitoring tool or measuring tool? IATF 16949 - Automotive Quality Systems Standard 9
V Gage R&R for Variables Data on a CMM (Coordinate Measurement Machine) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
S Does a CMM (Coordinate Measuring Machine) require Gage R & R study? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 9
B Gage R&R/MSA for In Process Measurement System in a Turning Machine Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
S GR&R (Gage R&R) on a CMM (Coordinate Measuring Machine) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 17
B Attribute GR&R (Gage R&R) using a CMM (Coordinate Measuring Machine)? General Measurement Device and Calibration Topics 3
S Gage R&R analysis for a fully automatic machine Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
L What kind of Gage R&R is needed for a Pull Test Machine? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
Q Certifying Gage Blocks on an In-House CMM (Coordinate Measuring Machine) General Measurement Device and Calibration Topics 19
D Gage R&R Study Requirements for Shop Gages that are used at the Machine Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
R Questions About CMM (Coordinate Measuring Machine) Gauge (Gage) R & R Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 14
D Attribute Gage R&R study - Automatic machine that tests for a particular feature Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
A Gage R&R - Repeatability and Reproducibility of a newly bought CMM machine Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 8
T Seeking Spreadsheet for CMM (Coordinate Measuring Machine) Gage R&R Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
T Pin gage identification in a small CNC/Screw machine job shop General Measurement Device and Calibration Topics 9
D What is the best gage equipment to measure an ID bore? Coordinate Measuring Machine? General Measurement Device and Calibration Topics 11
K Regulatory requirement of SaMD with machine learning component IEC 62304 - Medical Device Software Life Cycle Processes 1
P Need a programmer for QVI's VMS software for optical inspection machine Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
B IQ/OQ/PQ of CNC Milling Machine Qualification and Validation (including 21 CFR Part 11) 3
G Engineering retest in line - Machine stability issues IATF 16949 - Automotive Quality Systems Standard 8
R Machine directory (2006/42/EEC) is applicable or not Other Medical Device Related Standards 0
B Product Safety Responsibility - Job shop such as a machine shop AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
Marc The German Enigma Machine of World War II After Work and Weekend Discussion Topics 0
R Revalidation machine line and Stability Studies impact. Medical Device and FDA Regulations and Standards News 3
K Validation of new machine (second machine of the same type) Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 2
P How far an operator can reach into a machine before it becomes an ergonomic problem CE Marking (Conformité Européene) / CB Scheme 5
GreatNate Qualifying a CNC machine Manufacturing and Related Processes 3
C Machine Verification Plan Manufacturing and Related Processes 2
F AS9100D Process Matrix for a small cnc machine shop AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
B Using non CE parts in a machine CE Marking (Conformité Européene) / CB Scheme 1
Marco Bernardi Plane measurement with a 3D touch machine like a CMM. Calibration and Metrology Software and Hardware 3
Marco Bernardi Diameters measurement with 3D touch machine like a CMM Calibration and Metrology Software and Hardware 4
S Companies that maintain your machine should be in ASL? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
S Machine Setup for a CNC Machine Capability Study Capability, Accuracy and Stability - Processes, Machines, etc. 1
GoSpeedRacer Veterinary anesthesia machine CE Marking (Conformité Européene) / CB Scheme 1
H Should I mention machine/Equipment password In SOP? Qualification and Validation (including 21 CFR Part 11) 4
R How to properly use Survival Analysis to predict time to machine failure Reliability Analysis - Predictions, Testing and Standards 0
K Mammography Machine Bench Testing - FDA 510(K) US Food and Drug Administration (FDA) 5
J Extent of Validation - New machine installed in manufacturing ISO 13485:2016 - Medical Device Quality Management Systems 8
P Average access height into an industrial machine (average base plate height) Human Factors and Ergonomics in Engineering 2
B Machine process sheet requirements for pill bottling operation Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 1
B Does EMC Directive 2014/30/EU cease to apply when the Machine Directive 2006/42/EC is applicable? CE Marking (Conformité Européene) / CB Scheme 4
jjmusicjr Implementing Machine Replacement Part Reverse engineering technology Manufacturing and Related Processes 3
T QMS Template Help - Small machine shop/job shop Manufacturing and Related Processes 1
D 4M (Man, machine, method, materials) Management Manufacturing and Related Processes 3
jjmusicjr Starting from scratch - a plethora of challenges for a new Lumber Mill Machine Shop Quality Management System (QMS) Manuals 11

Similar threads

Top Bottom