Machine Shop Yield & Sampling Plan

Q

Quality Engineer66

#1
Hi All,

This is my first post here. I need some help in choosing what standard should I use for sampling. I am going to work in Machine shop where we produce lots of parts. We don't have any acceptance quality level set up. If I use Mil std 105e then for example if I have a lot size of 25 & I inspect 13 parts & found 3 were wrong then how will I know whether quality level is met.

Also what would be my first pass yield? Is it (13-3)/13 or (13-3)/25?

Looking for a great advice from the members.
 
Elsmar Forum Sponsor

Stijloor

Staff member
Super Moderator
#2
Hi All,

This is my first post here. I need some help in choosing what standard should I use for sampling. I am going to work in Machine shop where we produce lots of parts. We don't have any acceptance quality level set up. If I use Mil std 105e then for example if I have a lot size of 25 & I inspect 13 parts & found 3 were wrong then how will I know whether quality level is met.

Also what would be my first pass yield? Is it (13-3)/13 or (13-3)/25?

Looking for a great advice from the members.
Can someone help?

Thank You!!

Stijloor.
 

Stijloor

Staff member
Super Moderator
#3
Hi All,

This is my first post here. I need some help in choosing what standard should I use for sampling. I am going to work in Machine shop where we produce lots of parts. We don't have any acceptance quality level set up. If I use Mil std 105e then for example if I have a lot size of 25 & I inspect 13 parts & found 3 were wrong then how will I know whether quality level is met.

Also what would be my first pass yield? Is it (13-3)/13 or (13-3)/25?

Looking for a great advice from the members.
Bump.

First time poster; can someone give him a hand? :yes:

Thank you!!
 

Jim Wynne

Staff member
Admin
#4
Hi All,

This is my first post here. I need some help in choosing what standard should I use for sampling. I am going to work in Machine shop where we produce lots of parts. We don't have any acceptance quality level set up. If I use Mil std 105e then for example if I have a lot size of 25 & I inspect 13 parts & found 3 were wrong then how will I know whether quality level is met.
Welcome to the Cove. :bigwave:

It seems like you might be going about this backwards; you decide what your AQL should be (given a particular sampling plan) and that plan will tell you the sample size (based on lot size) and give you an accept/reject quantities.

Also what would be my first pass yield? Is it (13-3)/13 or (13-3)/25?
In most cases, if you were to find three defectives in a 13-piece sample from a 25-piece lot, you would inspect the other 12 pieces, so your yield would be from the lot, not from the sample.
 
2

20110525R

#5
Hi All,

This is my first post here. I need some help in choosing what standard should I use for sampling. I am going to work in Machine shop where we produce lots of parts. We don't have any acceptance quality level set up. If I use Mil std 105e then for example if I have a lot size of 25 & I inspect 13 parts & found 3 were wrong then how will I know whether quality level is met.

Also what would be my first pass yield? Is it (13-3)/13 or (13-3)/25?

Looking for a great advice from the members.
Well, I am new to this forum myself, but I have 39 years in manufacturing with an Industrial Engineering and Manufacturing Technology background with 27 of those years in Quality Assurance. I am now Retired and am an ISO 9001 and AS9100 Consultant.
The scarey part here is, are you saying your company is manufacturing parts without a Quality Inspection System, or a Quality Management System in place? Is there a QC/QA group in the facilty or are you the only one there?
Most companies (DoD especially) now use Zero Based Sampling plans and Six Sigma, 5S, SPC or some other system and from what you described, you reject the entire lot with 3 out of tolerance parts of a sample size of 13.
I have to ask some questions to further understand your situation, but if you haven't read your company Policies and Procedures (QA Manual) or the company doesn't have them, then you have no QA/QC system, I for one, would not want to be one of your customers if this is the case. I suggest you talk to your QA/QC Manager, if the company has one, if not, then you have a serious Quality problem with your company. By the way, Mil-Std 105 is obsolete as DoD doesn't want an "Acceptable Quality Level", they want good parts, and I would hope all of your customers do also.
I would be happy to elaborate later, but would need to know more about what is in place with your company.
 

Jim Wynne

Staff member
Admin
#6
Well, I am new to this forum myself, but I have 39 years in manufacturing with an Industrial Engineering and Manufacturing Technology background with 27 of those years in Quality Assurance. I am now Retired and am an ISO 9001 and AS9100 Consultant.
The scarey part here is, are you saying your company is manufacturing parts without a Quality Inspection System, or a Quality Management System in place? Is there a QC/QA group in the facilty or are you the only one there?
Most companies (DoD especially) now use Zero Based Sampling plans and Six Sigma, 5S, SPC or some other system and from what you described, you reject the entire lot with 3 out of tolerance parts of a sample size of 13.
I have to ask some questions to further understand your situation, but if you haven't read your company Policies and Procedures (QA Manual) or the company doesn't have them, then you have no QA/QC system, I for one, would not want to be one of your customers if this is the case. I suggest you talk to your QA/QC Manager, if the company has one, if not, then you have a serious Quality problem with your company. By the way, Mil-Std 105 is obsolete as DoD doesn't want an "Acceptable Quality Level", they want good parts, and I would hope all of your customers do also.
I would be happy to elaborate later, but would need to know more about what is in place with your company.
As far as the obsolescence 105E is concerned, it might have been superseded by the government, but it's still in use otherwise in many companies. The nice thing about math is that it's never obsolete. :D
I'm pretty sure that before 105E was supplanted the government (and all other customers) wanted good parts. ANSI/ASQ Z1.4 (the current version of the MIL standard) has accept/reject criteria just like its predecessor. The point that needs to be made here, imo, is that lot sampling plans on the producer end are of dubious value and should be obviated by process control. Nonetheless, there may be times when suppliers are faced with questionable lots and will (a) need to do sampling and (b) make a decision based on a rational assessment of risk. That's what sampling plans are for.
 
2

20110525R

#7
As far as the obsolescence 105E is concerned, it might have been superseded by the government, but it's still in use otherwise in many companies. The nice thing about math is that it's never obsolete. :D
I'm pretty sure that before 105E was supplanted the government (and all other customers) wanted good parts. ANSI/ASQ Z1.4 (the current version of the MIL standard) has accept/reject criteria just like its predecessor. The point that needs to be made here, imo, is that lot sampling plans on the producer end are of dubious value and should be obviated by process control. Nonetheless, there may be times when suppliers are faced with questionable lots and will (a) need to do sampling and (b) make a decision based on a rational assessment of risk. That's what sampling plans are for.
Jim,
My point wasn't whether or not the Mil-Std was obsolete or the math, but if Quality Engineer66 has no accept/reject criteria, then who has been responsible for the metrics and processes before he came to work at the facility to validate the Processes and Outcomes? Rational assessment of Risk is directly related to criticallity of the part (FMEA in most cases) and if he's just going to work at a machine shop has he talked to QA/QC folks yet? Does the company have an Inspection System in place? If up till now, sampling has not been used, then how has this company been evaluating the product. My guess is, there is something in place, procedures/system, to guide him in assessing the Processes and Outcomes and he needs to review that system (i.e. talk to QA/QC folks) before making an accept/reject criteria decision.
Mike
 
Q

Quality Engineer66

#8
Thanks all for the help. I am afraid to say that we don't have any standards to follow. We do have the check list but no sampling plan. What sampling technique should I use in the machine shop? Also how to calculate the yield based on the sampling plan.
 
2

20110525R

#9
Thanks all for the help. I am afraid to say that we don't have any standards to follow. We do have the check list but no sampling plan. What sampling technique should I use in the machine shop? Also how to calculate the yield based on the sampling plan.
Guess I am a little confused by your question now on calculating yield. Are you using SPC? If not, why? Have you had training in Statistical Process Control (SPC)? You are a Quality Engineer correct? Sorry, not to be down on you, but your questions now that I re-look at this thread are pretty much basic SPC.
Maybe time for some "Light Reading" on W. Edwards Deming, Joseph M. Duran, Walter A. Shewhart and Kaoru Ishikawa. Okay, I jest, it's not light reading, pretty boring stuff (wait till you sit through the Deming Tapes), but definitely worth the study for your field. If you have had this training, then I apologize for the inference here, but what you are asking here is pretty much normal stuff for a QAS/QAR or QAE to do.
 
Q

Quality Engineer66

#10
I am fresh graduate from college & working as a quality engineer. I am given the role to set the standards for the machine which doesn't have any system as its a new addition to the company. Can you please help me how to choose a sampling plan & how to know about the yield?
 
Thread starter Similar threads Forum Replies Date
B Machine Shop Yield and Cost - Productivity, Yield and Absorption Performance Manufacturing and Related Processes 3
B Product Safety Responsibility - Job shop such as a machine shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 10
F AS9100D Process Matrix for a small cnc machine shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
T QMS Template Help - Small machine shop/job shop Manufacturing and Related Processes 1
jjmusicjr Starting from scratch - a plethora of challenges for a new Lumber Mill Machine Shop Quality Management System (QMS) Manuals 11
T EN 10204 3.1 Inspection Certificate - Machine Shop Various Other Specifications, Standards, and related Requirements 4
M AS9100d (section 7.1.3) example of compliance in machine shop environment. AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
B ISO 9001:2015 for a Small Machine Shop need Resources ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
H AS9100D Cert question - Small machine shop - Where can I buy a certificate? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
S Need Continuous improvement Suggestions - Small (30 of us) all-CNC machine shop ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 28
M Industry Standards - Sheet Metal a Machine Shop Manufacturing and Related Processes 1
J Suggestions on Inadequate Resources in a Small Machine Shop Nonconformance and Corrective Action 2
M API Monogram License for a Small Machine Shop Oil and Gas Industry Standards and Regulations 1
J QMS and ISO 9001 for a Single Person Machine Shop ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 24
S Job travelers through a machine shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
A Start Up of a small AS9100 Machine Shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
S How will ISO 9001 help the machinists in a very small Machine Shop ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 23
M Start New Machine Shop OR BUY Business Continuity & Resiliency Planning (BCRP) 9
B Determing Machine Capability in a High Mix, Low Volume Sheet Metal Shop Manufacturing and Related Processes 4
M Machine Shop Process Instructions (Traveler) question AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
J Use of PPMs in Low Volume Machine Shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
S Product FMEA vs. Process FMEA - Aerospace Industry Machine Shop FMEA and Control Plans 5
P Machine Shop Tool Crib Procedure - Tooling for CNC mills Quality Tools, Improvement and Analysis 1
N Setting up MSA system in a machine shop environment. Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
N Setting up a new Calibration Room in a Machine Shop Calibration and Metrology Software and Hardware 3
A Nonconformances and Rework in a Machine Shop Nonconformance and Corrective Action 6
H AS9100C 6.2.2 Compliance - Machine Shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
C Microscope Power to use for Visual Inspections in an Aerospace Machine Shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
K Defect Reporting and Tracking Software for a Small Machine Shop Quality Assurance and Compliance Software Tools and Solutions 1
Project Man The "Ifs" in ISO 13485 Clause 6.4 Work Environment - Machine Shop which makes parts ISO 13485:2016 - Medical Device Quality Management Systems 1
E Configuration Managment in an Engineering Sub-Contract Machine Shop (3 people) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
N Where to begin defining and monitoring Quality Metrics in a Machine Shop Manufacturing and Related Processes 9
bobdoering Measurement Expert Advice - Modern Machine Shop Magazine Column General Measurement Device and Calibration Topics 0
E Production Planning in an Industrial Machine JOB SHOP Lean in Manufacturing and Service Industries 1
B SPC Software Selection for use in a CNC Machine Shop - InfinityQS and Lighthouse Quality Assurance and Compliance Software Tools and Solutions 3
W Special Training Tools for the Deaf in a Machine Shop Training - Internal, External, Online and Distance Learning 16
Douglas E. Purdy Sample Production FMEA for Machine Shop wanted FMEA and Control Plans 3
C What to expect in a GE Aerospace Audit of a 100 Person Machine Shop Customer and Company Specific Requirements 5
M Training and Competence requirements in a Small Machine Shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
S What is the Secret of Excellent Quality in a Machine shop? Misc. Quality Assurance and Business Systems Related Topics 29
S Implementing Dock To Stock in a Small Machine Shop Misc. Quality Assurance and Business Systems Related Topics 6
O NET-INSPECT is it worth it? Small Machine Shop doing AS9100 Quality Manager and Management Related Issues 2
D AS9100 Design - Machine shop offering Drafting Services? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
R 7.2.1 Customer Requirements Checklist for a Small Contract Manufacturing Machine Shop AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
H Contract Machine and Fabrication Shop - AS9100 Exemptions AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
K Paperless Electronic Records in a Machine Shop Records and Data - Quality, Legal and Other Evidence 8
L In-Process and Final Inspection for a job shop (Machine) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 11
C Is SPC a requirement of AS9100? Small Machine Shop and Assembly AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 8
B Requirements for AS9100 Contract Machine Shop in FAA Certification Process Federal Aviation Administration (FAA) Standards and Requirements 2
L Training Requirements Documentation and Records - Machine Shop ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12