Depends on the nonconformances. If each is in a different process/system, not necessarily. For example, if you have multiple nonconformances in document control it is probably a systemic problem (major). If you have 1 in document control and 1 in internal audits and 1 in design and development, a systematic problem is not indicated, so no major.