I need some help with clarification of the rules re: recert mandays.
We are going for our recert to TS.
We have a corporate certification scheme that has the following facilities on it:
For a total of 1398 people employeed in the facilities that are included on the corp certificate.
So, we have 6 facilities that are running a common management system.
When figuring the mandays, do I take the total people of 1398 and then take those 9.0 days and spread them across facilities,
or
do we take the mandays for each facility based on the headcount at each facility? 29.5 days for the whole of the organization before any design related exclusions and corporate scheme exclusions?
Please help me to understand the proper way of doing this according to iaob. The rules are ambiquous enough that it can be interpreted any way.
Thanks so much!!!!!!!!!!!!!!!!
We are going for our recert to TS.
We have a corporate certification scheme that has the following facilities on it:
Corp = 200 employees (design, contract review, testing,)
mfg 1 = 264 employees (metals forming facility with no design or contract review)
mfg 2 = 18 employees (distribution center - pick pack and ship only)
mfg 3 = 277 employees (plastics injection molding)
mfg 4 = 425 employees (metals forming)
mfg 5 = 214 employees (plastics injection molding)For a total of 1398 people employeed in the facilities that are included on the corp certificate.
So, we have 6 facilities that are running a common management system.
When figuring the mandays, do I take the total people of 1398 and then take those 9.0 days and spread them across facilities,
or
do we take the mandays for each facility based on the headcount at each facility? 29.5 days for the whole of the organization before any design related exclusions and corporate scheme exclusions?
Please help me to understand the proper way of doing this according to iaob. The rules are ambiquous enough that it can be interpreted any way.
Thanks so much!!!!!!!!!!!!!!!!