McDonnell Douglas Specification Control Drawings

M

Mrs Roy

#1
Can anyone tell me how to find out if an old MD spec from 1983 is still valid? 1D50641- or what Boeing specification replaced it?
 
Elsmar Forum Sponsor

dsanabria

Quite Involved in Discussions
#4
There is no PO, we are organizing inventory and specification data base.
OK - I gather that you are a broker or a warehouse that have inventory and wanted to know if it is still good or valid.

The next best thing is to keep it (which it appears to be obsolete items that you have) and when a customer shows up ask them for requirements
 
Thread starter Similar threads Forum Replies Date
I Control Plan (Product/Process specification/ Tolerance) acceptance FMEA and Control Plans 27
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
D DQ documents of new equipment - Function specification Qualification and Validation (including 21 CFR Part 11) 0
DuncanGibbons Manufacturing Plan vs Material Specification vs Control Plan Manufacturing and Related Processes 4
T Root Cause Failure Analysis - Not following Customer packaging Specification Problem Solving, Root Cause Fault and Failure Analysis 5
Q User Requirement Specification for HR (Human Resource Management System) Manufacturing and Related Processes 1
S Managing specification changes on standard parts purchased through trading companies Document Control Systems, Procedures, Forms and Templates 2
D Performance specification as a Risk Control Measure, EN 14971 ISO 14971 - Medical Device Risk Management 7
D Subcontracting specification developer duties US Food and Drug Administration (FDA) 5
shimonv IEC 60601-1 Essential Performance - Is the signal accuracy specification an essential requirement? IEC 60601 - Medical Electrical Equipment Safety Standards Series 4
S How to find technical specification for facilities maintainance ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
R Process Specification - What is the name of this PPAP form? APQP and PPAP 15
S When does a Distributor become a Specification Developer? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
M Procedure or Specification For Extending Gages Calibration Calibration Frequency (Interval) 2
Lisa Christo Specification developer Other Medical Device Related Standards 0
B IATF 16949:2016 – Technical Specification (eBook edition) IATF 16949 - Automotive Quality Systems Standard 1
R Contract Manufacturer/OEM Supplier - We are a specification developer for a kitted product 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
E Compliance to standards (ISO 80369) but the ID is out of specification Other ISO and International Standards and European Regulations 0
C ICP versus AA: How to determine appropriate specification for assay method verification Qualification and Validation (including 21 CFR Part 11) 1
M Specifications Aerospace - Who is responsible for providing the correct specification(s) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
I EO sterilization out of specification and correction Other Medical Device Regulations World-Wide 1
C Specification Developer or Consultant? Definitions 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
S Medical Device Manufacturer vs. Specification Developer Other US Medical Device Regulations 1
R Specification on flare testing extruded aluminum - Where to find Design and Development of Products and Processes 1
supadrai Establishment registered as specification developer and foreign exporter only 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
J Is there a specification that provides directions on Drawing Revision Changes Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
S Dates on Labels acceptable to the USA - GS1 General Specification 3.4.4 Other US Medical Device Regulations 3
S GR&R using 10 Parts with different Specification Limits Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
shimonv Soldering Station Accuracy out of specification 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
P Accounting for Variability on High Side of Specification Reliability Analysis - Predictions, Testing and Standards 1
P Specification Subscription Services - Eg: Things like MSDS AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
J Deformation specification not defined in print Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
N Understanding the absolute uncertainty specification for a Fluke 5500A Measurement Uncertainty (MU) 3
R Looking for calibration specification for Fluke 7250 pressure controller General Measurement Device and Calibration Topics 5
A Uncertainty Measurement - What this accuracy specification "1% + 10^5": means? General Measurement Device and Calibration Topics 2
R ISO 13485 for Specification Developers ISO 13485:2016 - Medical Device Quality Management Systems 4
P Specification and Tolerance in Stability Control Chart Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 9
T Customer requires Internal Specification to be met on PPAP APQP and PPAP 7
M Molded Component Color Tolerance Specification Manufacturing and Related Processes 6
Z Stamping Press Die Specification Manufacturing and Related Processes 2
L AS9100 - 7.4.2d Purchasing - Specification revision for raw material needed? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A Stuck at 'Analyse' stage of DMAIC Improvement Cycle on Cosmetic Specification Manufacturing and Related Processes 10
D Performing a Gage R and R with No Specification Range Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
T SOP for How to Write a Specification for Raw Materials and Finished Good ISO 13485:2016 - Medical Device Quality Management Systems 3
S Specification Verification Responsibility AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A Cosmetic Visual Inspection Specification Advantages Manufacturing and Related Processes 7
B Searching for Naval Air Engineering Center test specification NAEC TP 83-1 Misc. Quality Assurance and Business Systems Related Topics 1
V Setting Specification Limits for UOD (Uniformity) for Live Bacteria or Spores Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 4
J Why doesn't ANOVA Method take the specification into account when determining GR&R % Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 11
L Implementing ISO 27001 A12.1.1 Security Requirements Analysis and Specification IEC 27001 - Information Security Management Systems (ISMS) 2

Similar threads

Top Bottom